Hot Tapping Procedure

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

ASSET OWNER

PETRONAS CARIGALI SDN BHD

CONTRACTOR
JUSTRITE CONSTRUCTION AND SERVICES SDN BHD

PROVISION OF PERMANENT
CO2 SNUFFING SYSTEM
FOR ERB WEST FLARE

WELDING OF LATROLET AND HOT TAPPING PROCEDURES

Prepared by Checked by Reviewed by Approved by


Date Description Rev.
(Justrite) (Justrite) (PCSB-SBO) (PCSB-SBO)

20/6/06 Procedure Dickson Joseph 1


Justrite Construction & Services Sdn Bhd

Introduction

The LP (150mm Ø ) and HP (400mm Ø) flare pipeline shall be tapped in for the proposed CO2
snuffing system.
The respective flare line shall be tapped 45 degree and a latrolet to be in place for the new
CO2 snuffing system line.

The following procedures are for positioning, welding the latrolet onto the existing HP and LP
flare and making hot tap access entry into the line respectively. These procedures are in accor-
dance to the PTS 31.38.60.10 Hot Tapping on Pipelines, Piping and Equipment.

This hot tapping and welding operation procedure will be presented in the following order:

I. Preliminary Job Preparation


II. Welding Procedures
III. Hot Tapping Procedure.

I. Preliminary Job Preparation.

The line shall be depressurized after system shutdown and at no gas content prior to welding
and tapping work. Control isolation valve of the flare shall be at closed position.

Gas test to be carried out to test the oxygen gas level prior to welding and tapping work.

II. Welding Procedures

A. Weld Gap
• Fitting body or connecting fitting must be raised off the surface of the pipe or vessel
wall to establish a proper weld gap.

• Normal weld gap is 1.6mm per ANSI B31.1, applicable for carbon steel ASTM A105
pipeline.

B. Welding
• Arc weld should be used, if at all possible for all grades and types to minimize
warp age and distorting because of its localization of concentrated heat and to
prevent misalignment of hot tapping toll when the cut is made.

C. Mark up and fit up.


• As per drawing, the latrolet shall be 45 degree positioning. Fitter shall mark up and
fit up the latrolet position prior to welding work.

1. Tack Weld
• Preheat the access fitting to eliminate the possibility of the material cooling to a
temperature below the minimum.
• Temperature crayons or electricity temperature controls are generally used to
determine when the proper heat has been reach.
• Isolate all welding from chills and drafts.
• Center the body on absolute top dead center of pipeline run which it is to be in-
stalled.
• The base joint is tack welded, preferably at four (4) points.

2
Justrite Construction & Services Sdn Bhd REPORT NO: PPR/01/06

• The base joint is tack welded, preferably at four (4) points.


• After tack welding, the spacers are withdrawn and all slag removed.

2. Stringer Beads ( Root Pass )


• The stringer beads are applied completely around the base of the fitting.

3. Reinforcing or cover beads.


• Continuous reinforcing or cover beads should be added to fill the level and pro-
vide a smooth, tapered and very slightly convex weld slope.

D. Post Welding
• The whole area should then be wrapped with gunny sack and allowed to cool
slowly.

III. Hot Tapping Procedure

A. Hot Tapping precautionary considerations.

• Welding Integrity Test.

Test the integrity of the finished weld before cutting is started. Testing may be done
hydrostatically.

B. Hot Tapping – Method of Statement.

1. Hot Tapping equipment is coupled with the access fitting body which has been
welded earlier.
2. Open gate valve fully.
3. Check for wall smoothness and alignment of internal diameter of welded spools.
4. Assemble the hole saw chamber onto the hot tapping machine and insert the hot
tapping machine through gate valve and tap spool until the drill bit touches the pipe
surface.
5. Pull out the hole saw with unrestricted shaft to determine the actual length of the
hot tapping machine.
6. Place the gasket on the RF of the gate valve.
7. Mount the hot tapping machine with the shaft totally retracted until the tip of the drill
bit about 0.5 inches to 1 inch from the gate valve shuttle.
8. Insert all stud bolts and nuts, tighten with torque wrench then check the alignment
of hot tapping machine.
9. Slowly turn the handle of hot tapping machine until the drill bit of the saw touches
the pipe surface
10. Start drilling the pipe until the hole saw cut through the pipe wall.
11. Turn the handle of the hot tapping machine reverse to retract the shaft and the hole
saw completely.
12. Close gas valve completely.
13. Bleed the hole saw chamber through the bleed valve if the tapping machine.
14. Dismount the hot tapping machine by removing all stud bolts and nuts.
15. Remove the coupon and clean the saw chamber.