0% found this document useful (0 votes)
43 views4 pages

096000-048# Injection Pump Test Specifications: VE4/9F2200RND048

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views4 pages

096000-048# Injection Pump Test Specifications: VE4/9F2200RND048

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

INJECTION PUMP TEST SPECIFICATIONS

MANUFACTURER TOYOTA
INJECTION PUMP 096000-048#
ENGINE TYPE L VE4/9F2200RND048
VEHICLE MODEL CRESSIDA ROTATION Clockwise viewed from GOVERNOR TYPE Maximum-minimum
drive side speed
RATED VOLTAGE 12V INJECTION ORDER A-B-C-D INJECTION INTERVAL 90° ± 30'
Dimension KF (mm) 5.80 Dimension MS (mm) 0.65 ± 0.1
Dimension K (mm) 3.30 ± 0.1 Dimension PS (mm) —
1. TEST CONDITIONS
Nozzle 093400-0540 (DN12SD12A) Feed Pressure 19.6 kPa ( 0.2 kgf/cm 2)
Nozzle Opening Pressure 14.7 ± 0.5 MPa ( 150 ± 5 kgf/cm 2) High Pressure Pipe Ø2 × Ø6 × 840 mm
Test Oil SAE J967 (ISO4113) Fuel Temperature 40 - 45 °C (104 - 113°F)
NOTE : Apply 6 volts DC across the fuel cut solenoid during adjustment.
2. PRE-ADJUSTMENT Applying 6 ± 0.1 V to T.C.V.

Lever Position Pump Speed Boost Pressure Fuel Delivery Max. Spread
(deg) (rpm) in Delivery
(kPa) (mmHg) (mm3/st) (cc/200st) (mm3) (cc)

Full Load 28.5 ± 5° 1200 — — 39.0 ± 0.5 7.8 ± 0.1 2.0 0.4
(Full)
High Speed 2450 — — 18.5 ± 2.5 3.7 ± 0.5 — —
3. ADJUSTMENT OF INTERNAL PRESSURE Applying 6 ± 0.1 V to T.C.V.
Lever Position Pump Speed Boost Pressure Internal Pressure Remarks
(rpm) (kPa) (mmHg) (kPa) (kgf/cm 2)

Full 400 — — 245.0 ± 29.5 2.5 ± 0.3 By the regulating valve

2200 — — 686.0 ± 29.5 7.0 ± 0.3

4. OVERFLOW QUANTITY CHECK Applying 6 ± 0.1 V to T.C.V.


Lever Position Pump Speed Boost Pressure Overflow Quantity Remarks
(rpm) (kPa) (mmHg) (L/h) (cc/1000st)
Full 2200 — — 22 - 48 167 - 364
NOTE : The overflow valve belonging to the pump should be used checking.

5. ADJUSTMENT OF TIMER Applying 6 ± 0.1 V to T.C.V.


Lever Position Pump Speed Boost Pressure Piston Travel Remarks
(rpm) (kPa) (mmHg) (mm)

Full 800 — — 1.20 ± 0.40

1200 — — 2.80 ± 0.40

2000 — — 6.00 ± 0.40

2300 — — 6.75 ± 0.40

NOTE : Hysteresis at each pump speed is less than 0.3 mm.


2014.04.03
096000-048#
6. ADJUSTMENT OF BOOST COMPENSATOR — : Not Applicable

Lever Pump Boost Pressure Fuel Delivery Max. Spread Remarks


Speed in Delivery
Position (rpm)
(kPa) (mmHg) (mm3/st) (cc/200st) (mm3) (cc)

— — — — — — — — —

7. ADJUSTMENT OF FUEL DELIVERY Applying 6 ± 0.1 V to T.C.V.

Lever Pump Boost Pressure Fuel Delivery Max. Spread Remarks


Speed in Delivery
Position (rpm)
(kPa) (mmHg) (mm3/st) (cc/200st) (mm3) (cc)

Full 1200 — — 39.0 ± 0.5 7.8 ± 0.1 2.0 0.4 By full load setting screw

2450 — — 18.5 ± 2.5 3.7 ± 0.5 — — By max. speed setting screw

2250 — — 31.5 ± 2.0 6.3 ± 0.4 — —


Less than Less than
2700 — — 5.0 1.0 — —

100 — — 50.5 ± 7.5 10.1 ± 1.5 4.0 0.8 By governor sleeve plug

500 — — 34.5 ± 1.5 6.9 ± 0.3 2.5 0.5

2100 — — 35.3 ± 1.3 = A 7.0 ± 0.2 = A 2.5 0.5

8. SETTING OF LOAD SENSING TIMER Applying 6 ± 0.1 V to T.C.V.


Lever Position Pump Speed Boost Pressure Fuel Delivery Remarks
(rpm) (kPa) (mmHg) (mm3/st) (cc/200st)

Start of Load Sensing 2100 — — A – (7.0 ± 2.0) A – (1.4 ± 0.4) By governor shaft

End of Pressure Drop 1200 — — 14.0 ± 1.0 2.8 ± 0.2 Check

Repeat Advance Angle

Check Points 1. Change of Piston Travel : 1.40 ± 0.20 mm (Pump speed 1200 rpm)

2. : mm

3. Dimension of Governor Shaft : L = 1.5 ± 0.5 mm


096000-048#
9. SETTING ADJUSTING LEVER AT LOW SPEED Applying 6 ± 0.1 V to T.C.V.
Lever Pump Boost Pressure Fuel Delivery Max. Spread Remarks
Position Speed in Delivery
(deg) (rpm) (kPa) (mm3/st) (cc/500st) (mm3) (cc)
Lever setting
– 17.5 ± 4° 425 — 7.0 ± 1.5 = B 3.5 ± 0.8 = B 1.7 0.9
(Idle)
More than More than
400 — B + 2.5 B + 1.3 — —

500 — B - ( 6.0 ± 2.5) B - ( 3.0 ± 1.3) — —

10. SETTING OF ADJUSTING LEVER AT PARTIAL RANGE — : Not Applicable


Pump Speed Boost Pressure Fuel Delivery Remarks
3
(rpm) (kPa) (mmHg) (mm /st) (cc/500st)

— — — — — —

11. CHARACTERISTIC OF A.C.S.D.


Lever Pump Speed Boost Pressure Measuring Value Remarks
Position (rpm) (kPa) (mmHg)
— — — — — —

Fuel temperature : 39 - 41°C (102 - 106°F)

12. ADJUSTMENT OF T.C.V.


Lever Position Pump Speed Boost Pressure Piston Travel Remarks
(rpm) (kPa) (mmHg) (mm)
— — — — — —

13. SETTING OF DIAPHRAGM FOR HEATER & POWER STEERING — : Not Applicable
Pump Speed Vacuum Pressure Fuel Delivery Remarks
3
(rpm) (kPa) (mmHg) (mm /st) (cc/500st)
— — — — — —

14. ADJUSTMENT OF POWER CONTROL — : Not Applicable


Lever Pump Speed Boost Pressure Fuel Delivery Remarks
Position
(rpm) (kPa) (mmHg) (mm /st)3
(cc/200st)
— — — — — — —
IDLE - 0° + FULL