NORTH OF DWG.
10.75
TANK
B 13
B 14
BUILDING 9
BUILDING 10
BUILDING 8
BUILDING 1 BUILDING 12
BUILDING
BUILDING
BUILDING 6
BUILDING 5
11
7
BUILDING 4
BUILDING 2 BUILDING 3
LEGEND:
MALE TOILET
MALE TOILET JANITOR OWNER:
G
G 021
021 G 022
3XLAYER, EACH LAYER CONTAINS 5XØ110mm² UPVC CONDUIT INSIDE Ø150mm² SLEEVE
F
800 UNDER SLAB ON GRADE AT -80 cm F.F.L : F
B02 6350 11 F-EDB-B02 : 3.5X70mm² AL/XLPE/STA/PVC + 1X35mm² AL/PVC B02
F-DB-B02 : 8//(3.5X240)mm² AL/XLPE/STA/PVC + 1X240mm² AL/PVC
1250 F-KIOSEK(2,3):(3.5*50)mm2 AL/XLPE/STA/PVC+1X25mm² AL/PVC
2500 RETAILF-KIOSEK(4):(3.5*70)mm2 AL/XLPE/STA/PVC+1X35mm²
RETAIL AL/PVC RETAIL RETAIL RETAIL RETAIL
G 016F-KIOSEK(1):(3.5*35)mm2 AL/XLPE/STA/PVC+1X16mm²
G 015 AL/PVC G 014 G 013 G 012 G 011
G G
B02 250 250 250 250
B02
3XLAYERS, EACH LAYER CONTAINS 2XØ50mm² UPVC CONDUIT INSIDE Ø63mm² SLEEVES UNDER Ø150 FWR FROM U/G TO H/L
SLAB ON GRADE AT -80 cm F.F.L INCLUDE:
2XØ50mm² FOR: 2//(1X120) CU\PVC BONDING CONDUCTOR FOR EARTHING
3XØ50mm² FROM SLP-B02 TO STREET LIGHTING, DIGITAL SIGNAGE AND LANDSCAPE LIGHTING
Ø50mm² SPARE
H H
B02 B02
Fire Pipe sleev 160 mm under SOG
-970mm
00 ISSUE FOR APPROVAL 5-12-2023 R.S R.S. A.A.
Drainage Pipe sleev 160 mm under SOG No. REVISIONS DATE DRA ENG. CHK.
MEP CONTRACTOR :
-970mm
ALEMAM
01 02 03 04 05 06 07 08 09 10 11
B02 B02 B02 B02 B02 B02 B02 B02 B02 B02 B02 AL EMAM FOR ENGINEERING & PROJECTS CO.
GROUND FLOOR
Tower No. 4 Floor 6 - Bavaria Town - Plot No. 10 A - Katameya Tel.: (+202) 27498468/69/70/71/72/73/74/75
TEL.: (+202) 27498468 / 69 / 70 / 71 / 72 / 73 / 74 / 75
Email : [email protected]
PROJECT DATA:
MALL OF MANSOURA
BUILDING NAME
B02
DISCIPLINE
Composite
SHEET TYPE
Builder Work
SHEET TITLE
Ground Floor
11-12-2023 A0
CODE
Number Number
B02 SD COM. GR 00