Solis S5-EH1P-L Hybrid Inverter: Instruction Manual
Solis S5-EH1P-L Hybrid Inverter: Instruction Manual
Instruction Manual
Ver1.1
Please adhere to the actual products in case of any discrepancies in this user manual.
If you encounter any problem on the inverter, please find out the inverter S/N
and contact us, we will try to respond to your question ASAP.
Ginlong Technologies Co., Ltd.
This manual covers the Solis S5-EH1P-L Series model listed below :
S5-EH1P3K-L, S5-EH1P3.6K-L, S5-EH1P4.6K-L, S5-EH1P5K-L, S5-EH1P6K-L
Display
Key
Rs485 Meter cable x1
CAN cable x1 (For Eastron Meter) Eastron Meter x1 CT x1
.01. .02.
2. Safety & Warning 2. Safety & Warning
2.1 Safety
The following types of safety instructions and general information appear in this document as
describedbelow: WARNING:
To reduce the risk of fire, over-current protective devices (OCPD) are
DANGER: required for circuits connected to the inverter.
“Danger” indicates a hazardous situation which if not avoided, will result in The DC OCPD shall be installed per local requirements. All photovoltaic
death or serious injury. source and output circuit conductors shall have isolators that comply with
the NEC Article 690, Part II.
WARNING: All Solis single phase inverters feature an integrated DC switch.
“Warning” indicates a hazardous situation which if not avoided, could result
in death or serious injury. CAUTION:
Risk of electric shock, do not remove cover. There is no user serviceable
CAUTION: parts inside, refer servicing to qualified and accredited service technicians.
“Caution” indicates a hazardous situation which if not avoided, could result
in minor or moderate injury. CAUTION:
The PV array supplies a DC voltage when they are exposed to sunlight.
NOTE:
“Note” provides tips that are valuable for the optimal operation of your CAUTION:
product. Risk of electric shock from energy stored in capacitors of the Inverter,
do not remove cover for 5 minutes after disconnecting all power sources
WARNING: Risk of fire
(service technician only). Warranty may be voided if the cover is removed
Despite careful construction, electrical devices can cause fires.
without authorization .
Do not install the inverter in areas containing highly flammable materials
or gases. CAUTION:
The surface temperature of the inverter can reach up to 75℃ (167 F).
Do not install the inverter in potentially explosive atmospheres.
To avoid risk of burns, do not touch the surface of the inverter while it’s
operating. Inverter must be installed out of the reach of children.
2.2 General Safety Instructions
NOTE:
WARNING: PV module used with inverter must have an IEC 61730 Class A rating.
Only devices in compliance with SELV (EN 69050) may be connected to the
RS485 and USB interfaces. WARNING:
Operations below must be accomplished by licensed technician or
Solis authorized person.
WARNING:
Please don’t connect PV array positive (+) or negative (-) to ground, it could WARNING:
cause serious damage to the inverter. Operator must put on the technicians’ gloves during the whole process
in case of any electrical hazards.
WARNING:
Electrical installations must be done in accordance with the local and national
electrical safety standards. WARNING:
AC BACKUP Port of S5-EH1P-L Series is not allowed to connect to the grid.
WARNING:
Do not touch any inner live parts until 5 minutes after disconnection
from the utility grid and the PV input.
.03. .04.
2. Safety & Warning 3. Overview
3.1 Screen
Solis S5-EH1P-L Series adopts 7 inch color screen, it displays the status, operating information
WARNING: and settings of the inverter.
The S5-EH1P-L Series does not support parallel (three- and single-phase)
operation on the AC-BACKUP port. 3.2 Keypad
Connecting multiple units in parallel will void the warranty. There are four keys in the front panel of the inverter (from left to right):
ESC, UP, DOWN and ENTER keys. The keypad is used for:
Scrolling through the displayed options (the UP and DOWN keys);
Access and modify the settings (the ESC and ENTER keys).
××× × × ×
3 Phase LOAD 1 Phase LOAD Generator
Figure 3.2 Keypad
COM Port
WARNING:
Please refer to the specification of the battery before configuration.
.05. .06.
4. Installation 4. Installation
4.1 Select a Location for the Inverter
To select a location for the inverter, the following criteria should be considered: Install on a wall or strong structure capable of bearing the weight of the machine (18.3kg).
Exposure to direct sunlight may cause output power derating. It is recommended to Install vertically with a maximum incline of +/- 5 degrees, exceeding this may cause
300mm
300mm
300mm 300mm 300mm
500mm
500mm
Figure 4.2 Inverter Mounting clearance
NOTE:
Figure 4.1 Recommended Installation locations
Nothing should be stored on or placed against the inverter.
.07. .08.
4. Installation 4. Installation
4.2 Mounting the Inverter
Dimensions of mounting bracket:
Suitable fixing screws
102
21
Φ6.8
Bracket
70
140
11.8
333
318
Locking screw
6.8
Figure 4.4 Fix bracket on the wall
140
WARNING:
The inverter must be mounted vertically.
31
2.Lift up the inverter (be careful to avoid injury), and align the back bracket on the
31 inverter with the convex section of the mounting bracket. Hang the inverter on the
mounting bracket and make sure the inverter is secure (see Figure 4.5)
Figure 4.3 Inverter wall mounting
Once a suitable location has be found accordingly to 4.1 using figure 4.3 and figure 4.4
mount the wall bracket to the wall.
The steps to mount the inverter are listed below:
1. Select the mounting height of the bracket and mark the mounting holes.
For brick walls, the position of the holes should be suitable for the expansion bolts.
.09. .10.
4. Installation 4. Installation
4.3 PE Cable Installation 4.4 PV Input Cable Installation
An external ground connection is provided at the right side of inverter.
Prepare OT terminals: M4. Use proper tooling to crimp the lug to the terminal. Before connecting inverter, please make sure the PV array open circuit
Connect the OT terminal with ground cable to the right side of inverter. The torque is 2Nm. voltage is within the limit of the inverter.
Before connection, please make sure the polarity of the output voltage of
PV array matches the“DC+”and“DC-”symbols.
1. Select a suitable DC cable and strip the wires out by 7±0.5mm. Please refer to the table
below for specific specifications.
Cross section(mm²)
Cable type
Range Recommended value
Industry generic PV cable 4.0~6.0
7±0.5mm 4.0(12AWG)
(model:PV1-F) (12~10AWG)
Figure 4.7
2. Take the DC terminal out of the accessory bag, turn the screw cap to disassemble it, and
Figure 4.6 Connect the external grounding conductor
take out the waterproof rubber ring.
Positive terminal
Negative terminal
Figure 4.8
.11. .12.
4. Installation 4. Installation
3. Pass the stripped DC cable through the nut and waterproof rubber ring. 6. Measure PV voltage of DC input with multimeter, verify DC input cable polarity.
Positive terminal
Negative terminal +
Figure 4.9 -
4. Connect the wire part of the DC cable to the metal DC terminal and crimp it with a special Figure 4.12
DC terminal crimping tool.
7. Connect the wired DC terminal to the inverter as shown in the figure, and a slight
"click" is heard to prove the connection is correct.
Positive terminal
Squeeze
Click
Negative terminal
Figure 4.10
5. Insert the crimped DC cable into the DC terminal firmly, then insert the waterproof rubber
Figure 4.13
ring into the DC terminal and tighten the nut.
After you hear a "click", pull gently to check for a firm engagement.
CAUTION:
Positive terminal If DC inputs are accidently reversely connected or inverter is faulty or not
Click working properly, it is NOT allowed to turn off the DC switch. Otherwise it
may cause DC arc and damage the inverter or even lead to a fire disaster.
Negative terminal The correct actions are:
*Use a clip-on ammeter to measure the DC string current.
*If it is above 0.5A, please wait for the solar irradiance reduces until the
current decreases to below 0.5A.
*Only after the current is below 0.5A, you are allowed to turn off the DC
switches and disconnect the PV strings.
Tighten * In order to completely eliminate the possibility of failure, please disconnect
the PV strings after turning off the DC switch to aviod secondary failures due
to continuous PV energy on the next day.
Please note that any damages due to wrong operations are not covered in
the device warranty.
Figure 4.11
.13. .14.
4. Installation 4. Installation
4.5 Battery Power Cable Installation
4.5.1 Normal battery cable installation 4.5.2 Extended battery cable installation
If the battery cable size is required to be changed by the battery manufactuer, please
NOTE: refer to following content for the cable preparation. Otherwise, you may skip these steps.
External battery switch must be installed between the battery and inverter for
safe maintenance purpose if the battery does not have built-in DC breaker.
The battery switch must have a rated current greater than or equal to 80A/125A
(80A for 3K~3.6K Models, 125A for 4.6K~6K Models).
Connect the Battery cable to the inverter and make sure the positive and negative poles
A A-1 A-2 B C-1 C-2 D
are correct. A "Click" sound means fully connection and fasten the cables with the terminal
protection cover as indicated in Figure 4.14. Figure 4.16
A:Connector Body
A-1: Barrel sealing (Not included when no sealing requirement)
A-2: O-Ring (Not included when no sealing require ment)
B: Barrel(Only for cable size 16mm² )
C: Grommet(Not included when no sealing requirement)
C-1: For 16mm²
C-2: For 25mm²
D: Back Shell
Figure 4.14 Installation of Terminal Protection Cover
Step 1: Wire cutting and stripping (Apply for 10mm² & 16mm² Cable)
To remove the battery connection, please ensure the system is powered off and then
remove the terminal protection cover. When disconnect the battery cables, please Stripping conductor: 18±1mm
press the button as indicated in the figure while pulling out the cable.
Button
Conductor Insulation
Figure 4.15 Figure 4.17
NOTE:
Before connecting the battery, please carefully read the user manual of the
battery and perform the installation exactly as the battery manufacturer
requests.
.15. .16.
4. Installation 4. Installation
Step 2: Un-assemble Grommet and Back shell over the cable as shown. Step 4: Crimping the lug as shown.
Figure 4.20
Table 4.1
When 16mm² cable apply,
assembly barrelinto lug firstly as shown
Recommended crimping tool: Manual hydraulic crimping
Die:25 mm²
Figure 4.21
.17. .18.
4. Installation 4. Installation
4.6 AC Cable Installation
Step 5: Install grommet and back shel. There are two AC terminals and the assembly steps for both are the same.
TakeouttheACconnectorpartsfromthepackaging.
Assemble the grommet onto the connector body firstly
Describe Numerical value
No gap Then assemble back shell onto the connector body and tighten Exposure Length 9mm
Table 4.2
22mm 9mm
Figure 4.22
27mm 9mm
Figure 4.23
A A: Locker
B C D E
B: Body
C: Seal body
D: Claw
E: Nut
Figure 4.24
Figure 4.25
.19. .20.
4. Installation 4. Installation
4.7 Communication Cable Installation
4. Push Housing into Body. 4.7.1 Communication Port Definition
Table 4.3
Figure 4.27
4.7.2 CAN Port Connection
6. The same installation for both cable end plug and socket connectors. 4.7.2.1 CAN Communication with Lithium Battery
7. Mating plug andsocket: Push the plug into the socket completely, then rotate the 1. A 3m length pre-made CAN cable is provided in the accessory package with one
locker according to the direction instructed by the marks on thelocker. end marked with “To CAN” and the other end marked with “To Battery”.
To Battery
To CAN
Figure 4.29
Figure 4.28
NOTE: 2. Insert the RJ45 terminal on the end of the CAN cable (Marked with “To CAN”) to the
Before mating the plug and socket, please double check both AC Grid and CAN port at the bottom of the inverter and fasten the swivel nut.
AC Backup connectors. Do not connect the grid cables to the AC Backup 3. Connect the other end marked with “To Battery” to the battery.
port or connect the backup load cables to the AC Grid Port.
Otherwise, it may leads to malfunction or damage.
.21. .22.
4. Installation 4. Installation
4.7.3 RS485 Meter Port Connection
NOTE:
4.7.3.1 RS485 Meter Connector Assemble Steps
RJ45terminal
Pin definition of the CAN Port is following A 2-pin connector with 5m RS485 cable for meter communication can be found in the
12345678
EIA/TIA 568B. package. If extending the RS485 cable, please ensure the distance is within 100m and
CAN-H on Pin 4: Blue CAN-H twisted shielded RS485 cable should be used to prevent signal interference.
CAN-L on Pin 5: Blue/White CAN-L Red wire is RS485A
Black wire is RS485B
4.7.2.2 Battery Temperature Sensor Connection for Lead-acid Battery
(Optional)
NOTE:
Battery temperature sensor can be optionally used with lead-acid battery for
inverters to accurately detect the battery ambient temperature and adjust
voltage compensation based on the customer-defined coefficient. It is an
optional accessory which may not be provided with the inverter package.
If lead-acid battery is used and battery temperature sensor is needed, A. Connection Part B. Rotatory Ring C. Main Body D. Sealing Ring E. Fasten Nut
please contact your distributor or Solis sales to purchase individually. Figure 4.31
1. Insert the RJ45 terminal end to the CAN port at the bottom of the inverter and fasten
the swivel nut. (Cable length: 1 meter)
2. Fasten the temperature sensor ring onto the battery module. If no suitable fastening RS485A RS485B
terminal can be found on the battery module, the sensor ring can be attached to the
positive or negative pole of the battery module.
Figure 4.32
Table 4.4
.23. .24.
4. Installation 4. Installation
4.7.4 DRM Port Connection (Optional)
4.7.4.1 For Remote Shutdown Function
NOTE:
Solis inverters support remote shutdown function to remotely control the inverter Solis hybrid inverter is designed to provide 12V power for DRED.
to power on and off through logic signals.
The DRM port is provided with an RJ45 terminal and its Pin5 and Pin6 can be used for
remote shutdown function. RJ45 plug 1--8
RJ45terminal
Correspondence between the
cable s and the stitch es of plug
12345678 Pin 1: white and orange ; Pin 2: orange
Signal Function Pin 3: white and green; Pin 4: blue
Pin 5: white and blue; Pin 6: green
12345678
Short Pin5 and Pin6 Inverter Generates Pin 7: white and brown; Pin 8: brown
Open Pin5 and Pin6 Inverter Shutdown in 5s Figure 4.34 Strip the insulation layer and connect to RJ45 plug
Figure 4.33 Strip the insulation layer and connect to RJ45 plug
3. Rotate the black ring on the Solis Data Logger in clockwise to secure the connection.
Assignment for inverters capable Assignment for inverters capable
Pin of both charging and discharging Pin of both charging and discharging
NOTE:
1 DRM 1/5 5 RefGen Do not rotate the main body of the Solis Data Logger.
2 DRM 2/6 6 Com/DRM0 It may damage the logger and the inverter COM port.
3 DRM 3/7 7 V+
4 DRM 4/8 8 V-
Table 4.6
.25. .26.
4. Installation 4. Installation
NOTE:
1. The Smart Meter with CT is already configured ; please do not change any
settings on the Smart Meter.
2. One Smart Meter can be used with only one hybrid inverter.
The Solis S5-EH1P-L Series inverter is able to connected Acrel meters or Eastron meters
to fuilfill the control logic of the self-consumption mode, export power control, monitoring,
etc.
Acrel 1ph meter (With CT): ACR10R-D16TE (Optional)
Figure 4.36
Acrel 3ph meter (With CT): ACR10R-D16TE4 (Optional)
Eastron 1ph meter (Direct Insert): SDM120M (Optional)
4.7.5.2 Third party monitoring/control device connection Eastron 1ph meter (With CT): SDM120CT
If a third party monitoring/control device need to be connected directly to the inverter, the Eastron 3ph meter (Direct Insert): SDM630 (Optional)
COM port can be used with a special connector to extend the RS485A and RS485B pins, Eastron 3ph meter (With CT): SDM630MCT (Optional)
please contact Solis local service team or Solis sales for this special connector. Below 4.8.1 section describes the connection diagram of 1ph meter Eastron SDM120CT
and Acrel ACR10R-D16TE.
Below 4.8.2 section describes the connection diagram of 3ph meter Eastron SDM630MCT
and Acrel ACR10R-D16TE4.
NOTE:
Please note that the CT orientation must be correct, G r id
s id e
Modbus RTU protocol is supported by Solis inverters. To acquire latest protocol document,
please contact Solis local service team or Solis sales.
Compatible Smart Meter Model Meter RS485 Pin Definition
4.8 Meter Installation SDM120CT (Default) Pin 9 – RS485B, Pin 10 – RS485A
A Smart Meter with the CT in product box is compulsory for hybrid system installation. RJ45 Port on the meter
ACR10R16DTE
It can beused to detect the grid voltages and current directions, provide the operating Pin 7 – RS485B, Pin 8 – RS485A
condition of the hybridinverter via RS485 communications. ACR10R16DTE4 Pin 21 – RS485A, Pin 22 – RS485B
Table 4.7
.27. .28.
.29.
3 4
8 9 10
RS485 Meter COM Pin 9 – RS485A - Black
SDM120M
Pin 10 – RS485B - Red
CB S5-EH1P-L
L L
N N GRID
4.8.1 Single phase meter installation
PE PE
Battery
Grid
RCD
s id e
G r id
PE N L
L
K
Power cable
Load_a
CT direction
towards to grid
Note:
If the CT is installed in the wrong direction,
the Hybrid Inverter can't work normally.
Back-up 5 6 7 8 9 10212223
CB
L L
CB White Black
PV strings N RCD N
PE PE
S5-EH1P-L CB
L CT L
CB S5-EH1P-L
N N GRID
PE PE
Battery Grid
RCD
PE N L
s id e
Power cable G r id
L
K
Load_a
Note:
If the CT is installed in the wrong direction, CT direction
the Hybrid Inverter can't work normally. towards to grid
9 10 11 12 13 14 15 16 17 18 19 20
Meter
Meter 1 2 3 4 5 6 7 8
Back-up CB
CB L L
PV strings
N RCD N
PE PE
CT3 L3
CB RS485 L2
S5-EH1P-L CT2
CB
4. Installation
L L1 GRID
N CT1 N
PE PE
4.8.2 Three phase meter installation
Battery
Grid
RCD
PE N L
s id e
G r id
L
K
Power cable
Load_a
CT direction
Note: towards to grid
If the CT is installed in the wrong direction,
the Hybrid Inverter can't work normally.
N
Lc N
Lb
La
La
1 2 3 4 1312
Meter
Critical Load:3kw
A B
Distribution box 5 6 7 8 9 10 21 22 23
Back-up
L L
PV strings RS485
N RCD N
PE PE CTc Lc
RS485 CTb Lb
S5-EH1P-L
La CTa La GRID
N N
PE PE
Battery
Grid
RCD RCD RCD
PE N L PE N La Lb Lc PE N Lc
Power cable
s id e
G r id
L
Note: K
If the CT is installed in the wrong direction,
the Hybrid Inverter can't work normally.
CT direction
Figure 4.41 (Acrel ACR10R-16DTE4) towards to grid
.32.
4. Installation
4. Installation 5. Commissioning
4.9 LED Indicators 5.1 Preparation of Commissioning
There are three LED indicators on the RHI inverter (Red, Green, and Orange) which Ensure all the devices are accessible for operation, maintenance and service.
indicate the working status of the inverter. Check and confirm that the inverter is firmly installed.
Space for ventilation is sufficient for one inverter or multiple inverters.
Nothing is left on the top of the inverter or battery module.
Inverter and accessories are correctly connected.
Cables are routed in safe place or protected against mechanical damage.
Light Status Description Warning signs and labels are suitably affixed and durable.
.33. .34.
5. Commissioning 5. Commissioning
4. Enter advanced settings (do not repeat this step for all subsequent operations). 5. Select the local grid standard code.
Menu
Settings 2015-02-23 19 35 Advanced Settings 2015-02-23 19 35 Select
Settings
Standard 2015-02-23 19 35
G99
0.00kW Settings
Calibrate DSPUpdate
0.00kW
Reset Password BaudRate RS485
Advanced Information
0.00kW Restart HMI
Applicable Country/Region
.35. .36.
5. Commissioning 5. Commissioning
6. Check the backup supply settings. If you don't have a backup circuit on the backup port, 7. Select the battery option and set battery SOC
disable it. Otherwise, keep it as enable and refer to section 4.6 for the installation process The default setting for overdischarge SOC is 20%, force charging SOC is 10%, force
of AC backup connector. charge current limit is 100A. If other setting is needed please follow 6.6.6.2 for detail.
Advanced Settings 2015-02-23 19 35 Storage
Settings Energy Set 2015-02-23 19 35
PS. If you don't have battery connected, set it to "No Battery".
Control Parameter
Select Standard Export Power Set Advanced Settings 2015-02-23 19 35 Storage
Settings Energy Set 2015-02-23 19 35
Step 1 Step 2
Control
SettingsParameter 2015-02-23 19 35 Step 1 Step 2
Backup Supply: Disable Floating Charge: 055.0V
Backup Votage: Equalizing Charge: 000.0V SettingsSelect
Battery 2015-02-23 19 35
230.0V
Current Direction: Charge Batter y Overoltage: 056.4V
Battery Current: 000.0A Battery Undervoltage:046.0V Battery Module:
Charge Limitation: 000.0A Voltage Droop:
OverDischg SOC: 020%
Disable B-BOX LV
Discharge Limitation:000.0A
SET=<ENT> DONE=<ESC>
ESC UP DOWN ENT
YES=<ENT> NO=<ESC>
Step 3 ESC UP DOWN ENT
Step 3 Step 4
Battery
SettingsSelect 2015-02-23 19 35
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
Step 5
.37. .38.
5. Commissioning 5. Commissioning
8. Select the storage work mode.
Brand Model Setting Recommended settings - Self-Use Mode. This mode can maximize the use of
photovoltaic power generation directly for household electricity, or store it in batteries
BYD Box Pro 2.5-13.8 Select "B-BOX"
and use it for household electricity.If the other mode need to be used, please follow
LG Energy 6.6.6.4.
RESU 3.3/6.5/10/13 (CEI 0-21) Select "LG Chem"
Solution
Advanced Settings 2015-02-23 19 35 Storage
Settings Energy Set 2015-02-23 19 35
Battery Select HH MM HH MM HH MM
Charge Time: 22:00----08:00 Total Time: 10:00
Not Allow
Discharge Time: 08:00----22:00 Total Time: 14:00
Charge Time: 00:00----00:00 Total Time: 00:00
Discharge Time: 00:00----00:00 Total Time: 00:00
Charge Time: 00:00----00:00 Total Time: 00:00
Discharge Time: 00:00----00:00 Total Time: 00:00
NOTE:
NEXT=<ENT> DONE=<ESC> YES=<ENT> NO=<ESC>
Only battery models in the list can be selected. ESC UP DOWN ENT ESC UP DOWN ENT
Step 5 Step 6
NOTE:
See step 6, if "Charge from grid for self use" is set to "Not Allow", the inverter
will not force charge the battery and the battery could potentially go to sleep
mode.
.39. .40.
5. Commissioning 5. Commissioning
8. Please check in the accessory package and confirm the meter type first. 9. Switch on the inverter DC switch.
If the default meter is Acrel ACR10R16DTE, please select the meter type as "1PH Meter". 10. Switch on battery breaker.
If the default meter is Eastron SDM120CT, please select the meter type as "Eastron 1PH 11. Verify the readings in "Information" pages.
Meter". If another meter is used, please refer to section 6.6.6.3.1 to select the meter type.
Menu
Settings 2015-02-23 19 35
Please set the "meter placement" as "Grid". If other configuration is used, please refer to
Information
section 6.6.6.3.2.
0.00kW 2.526
KWH
Settings
Advanced Settings 2015-02-23 19 35 Storage
Settings Energy Set 2015-02-23 19 35
0.00kW
0.00kW
Control Parameter
Select Standard Export Power Set Advanced Information
0.00kW
ON/OFF HMIUpdate Battery Select
Meter Placement
1/4 2/4
ESC UP DOWN ENT ESC UP DOWN ENT
Step 3 Step 4
YES=<ENT> NO=<ESC>
YES=<ENT> NO=<ESC>
Settings
Information 2015-02-23 19 35 Information
Settings 2015-02-23 19 35
ESC UP DOWN ENT ESC UP DOWN ENT
Step 5 Step 6
YES=<ENT> NO=<ESC> YES=<ENT> NO=<ESC>
ESC UP DOWN ENT ESC UP DOWN ENT
Step 5 Step 6
.41. .42.
5. Commissioning 6. Operation
5.3 Shutdown procedure
1. Turn off the AC isolator at the grid connection point.
2. Turn off the DC switch of the inverter.
Pressing the ESC
main menu
3. Turn off the DC switch between inverter and battery. key calls back
4. Waiting for the LCD of inverter to turn off and the system shutdown is completed. the previous menu
information
UP/DOWN
settings
ESC
ENTER
Monthly Energy Main interface UP/DOWN
ESC
advanced info.
Pressing the ENTER
key to switch UP/DOWN
to the submenu
advanced settings
Settings
Set Language 2015-02-23 19 35
English
中文
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
.43. .44.
6. Operation 6. Operation
6.2 Main Menu
After setting the language, press "ESC" to access the main page. There are four submenu in the Main Menu:
1. Information
2. Settings
3. Advanced Information
4. Advanced Settings
0.00kW 2.526
KWH
0.00kW Menu
Settings 2015-02-23 19 35
0.00kW
Information
0.00kW
Settings
Advanced Information
Non-Critical Loads: Loads connected to the AC Grid port which Solar Power: 00000W
will shutdown if the grid is in malfunction. Solar Voltage1: 000.0V Solar Current1: 000.0A
Solar Voltage2: 000.0V Solar Current2: 000.0A
2.526
Smart Meter: When the smart meter is connected successfully, Grid Voltage: 000.0V Grid Power: +00000W
KWH
it will display "RS485 OK", otherwise "RS485 Fail". Battery Voltage: 000.0V Grid Frequency: 00Hz
Backup Voltage: 000.0V Charg Power: +00000W
Critical Loads: Loads connected to the AC Backup port which will DRM NO.: 08
be supported by battery and solar even if the grid is in malfunction.
Grid: The arrow and value indicate the export/import power of 1/4
the hybrid system.
ESC UP DOWN ENT
.45. .46.
6. Operation 6. Operation
Information 2015-02-23 19 35 Settings
Information 2015-02-23 19 35
2/4 4/4
ESC UP DOWN ENT ESC UP DOWN ENT
Settings
Information 2015-02-23 19 35
NOTE:
BMS Information Meter Power/Grid Power: Positive value indicates exporting power to the
Module Type: No Battery grid, negative value indicates importing power from the grid
Battery Voltage: 00.00V Charge Power: Positive value indicates charging, negative value indicates
Battery Current: 000.0A discharging.
Charge Limit: 000.0A
Discharge Limit: 000.0A
SOC Value: 000%
SOH Value: 000% NOTE:
BMS Status: Normal Information for "PV Inverter Meter" is only available when two Eastron
meters are used and Meter Placement is selected as "Grid+PV Meter".
3/4
Details please consult Solis service department.
ESC UP DOWN ENT
.47. .48.
6. Operation 6. Operation
6.4 Settings 6.4.2 Set Address
In the "Settings" section, Time/Date, Slave address and language can be modified. Set the slave address of the inverter. The default address is 01.
Set Time/Date
Slave Address:01
Set Address
Set Language
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
YY MM DD
2015 - 2 - 23 YES=<ENT> NO=<ESC>
HH MM
Figure 6.12 Set Language
20 : 53
NEXT=<ENT> DONE=<ESC>
ESC UP DOWN ENT
.49. .50.
6. Operation 6. Operation
6.5 Advanced Information 6.5.2 Running Message
Detailed information can be viewed in this section: This function is for maintenance person to get running message such as internal
1.Alarm Message temperature, Standard NO. etc.(Values are for reference only).
2.Running Message
Settings Message
Running 2015-02-23 19 35
3.Version
4.Communication Data. DC Bus Voltage: 410.7V
5.Daily Energy Reactive Power Ratio: +1.00
6.Monthly Energy Output Power Limit: 100%
Control Word Status: 0000H
7.Yearly Energy
Inverter Temperature: +0031.6degC
8.Total Energy. Standard: G59/3
9.Warning Message Grid Filter NO.: 00
Ground Voltage: 000.0V
Advanced
Settings Information 2015-02-23 19 35 Battery Enable: Disable
Communication Data
6.5.3 Version
Daily Energy Inverter model number and software version can be viewed in this section.
Monthly Energy Values are for reference only..
Version 2015-02-23 19 35
ESC UP DOWN ENT
Model: F8
Figure 6.13 Advanced Information Software Ver.:140000
6.5.1 Alarm Message
40 pages of latest alarm messages (5 per page). Alarm message shows the alarm
that will lead to inverter shutdown. 版本号 2015-02-23 19 35
01-10: 86 61 A1 00 01 50 8A 06 1E 00 500
11-20: D5 05 1E 00 00 00 00 00 00 00
Monthly Energy[kWh]
400
21-30: 00 00 00 00 00 00 00 00 00 00
31-40: 09 02 00 00 00 00 B8 10 C0 00 300
41-50: 20 5C 80 01 00 00 43 00 07 02 200
51-60: 01 00 04 00 6D 04 E6 05 01 00
100
61-70: DC 05 1E 00 59 06 1E 00 D4 03
71-80: 10 27 00 00 00 00 00 00 00 00 000
05 10 15 20 25
81-90: 00 00 00 00 00 00 60 00 00 00 2015-02-23 : 071.2kWh
ESC
Figure 6.19 Monthly Energy
Figure 6.17 Communication Data
6.5.7 Yearly Energy
6.5.5 Daily Energy The screen shows the inverter yearly energy detail of different year.
The screen shows the daily energy detail of the inverter.
Settings
Yearly Energy 2015-02-23 19 35
2.5
60
Ye a r l y E n e r g y [ M W h ]
2.0
50
1.5
40
Daily Energy[kW]
1.0
30
00.51
0.5
20
0.0
10
01 02 03 04 05 06 07 08 09 10 11 12
2015
00
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 ESC UP DOWN ENT
2015-02-23
.53. .54.
6. Operation 6. Operation
6.5.8 Total Energy 6.6 Advanced Settings - Technicians Only
The screen shows the inverter total energy detail.
NOTE:
Settings
Total Energy 2015-02-23 19 35 This function is for authorised technicians only. Improper access
3.0
and operation may result in abnormal results and damage to the inverter.
Password required – restricted access – authorised technicians only
2.5
Un-authorised access may void the warranty. (Password"0010")
Totally Energy[MWh]
2.0
1.5
Select Advanced Settings from main menu, the LCD screen show the password is needed:
1.0
0.5
Settings
Password 2015-02-23 19 35
00.01
0.0
2006 2007 2008 2009 2010 2 0 11 2012 2013 2014 2015
ON/OFF HMIUpdate
Calibrate DSPUpdate
Restart HMI
Figure 6.22 Warning Message
Storage Energy Set
.55. .56.
6. Operation 6. Operation
6.6.1 Select Standard
This function is used to select corresponding grid standards.
Please refer to the actual LCD setting for the grid standard options. NO. Code in LCD ApplicableCountry/Region
1 VDE4015 Germany
Settings
Select Standard 2015-02-23 19 35
2 DK1 East Denmark
3 DK2 West Denmark
Select Standard:
G99 4 EN50438L Applicable in some European countries
5 France France
6 C10/11 Belgium
7 NRS097 South Africa
8 CEI-021 Italy
9 RD1699 Spain
YES=<ENT> NO=<ESC>
10 EN50549 Applicable in some European countries
11 G98 UK
Figure 6.25 Select Standard
12 G99 UK
Press "UP" and "DOWN" to go through the list. 13 G98NI North Ireland
Press "ENT" to check the parameters, press "ENT" again to select the standard.
14 G99NI North Ireland
15 EN50549IE Ireland
NOTE: Table 6.1 Applicable Country/Region
Please check if the grid code setting comply with local requirement.
5.6.2 ON/OFF
For different countries and regions, corresponding grid code needs to be selected in the This function is used to start or stop the generation of the inverter.
inverter LCD to meet the requirements of local network provider.
This instruction indicates how to change the grid code and what code should be selected Settings
ON/OFF 2015-02-23 19 35
in different places.
This following list illustrates the grid standard options in the inverter which are subject to
ON
change. It is for your reference only. If customer has any doubts or uncertainty, please
consult Solis service department for confirmation. OFF
Detailed protection limits can be viewed when choosing the code.
Please select "Save&Send" to enforce the code. STOP
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
.57. .58.
6. Operation 6. Operation
6.6.3 Calibrate
Warranty or maintenance may result in resetting total generating data, this function allow PowerParameter
the maintenance personnel to amend the total generating data of replacement inverter to
the original one. Adjusting total1.000
Power Para: generating power 2015-02-23 19 35
By using our data monitoring hardware, the data on monitoring website can automatically
synchronize with the preset total generating power of inverter.
Calibrate 2015-02-23 19 35
Total Energy
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
Power Parameter
Adjusting total00000
Total Energy: generating
56 kWhpower 2015-02-23 19 35
Please Input New Password
X X X X
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
Figure 6.30 Reset Password
Figure 6.28 Total Energy
.59. .60.
6. Operation 6. Operation
6.6.5 Restart HMI 6.6.6.2 Battery Select
This function is to reboot the LCD screen. This product is compatible with multiple battery models. Please refer to the latest
compatible battery list on Solis company website.
6.6.6 Storage Energy Set
WARNING:
This section contains working mode setting, battery control setting, etc.
Inverter must be installed with compatible battery models. Any defect,
Settings Energy Set
Storage 2015-02-23 19 35
damage or collateral loss due to using a non-compatible battery is not
in the scope of inverter warranty or compensation.
Control Parameter Please refer to the battery compatible list on Solis company website for
information on latest compatible battery models.
Battery Select
Meter Set
For above compatible battery modules, Only three parameters need to be defined:
* OverDischg SOC (10%~40%, default 20%)
Storage Mode Select --Inverter will not discharge the battery when the OverDischg SOC is reached.
Battery self-discharge is unavoidable,SOC may go lower than the limit if the battery
Battery Wakeup
can't get charged for a long period of time.
* ForceCharge SOC (5%~OverDischg SOC, default 10%)
--To prevent the battery going into sleep mode, when the ForceCharge SOC is reached,
inverter will charge the battery using the power from either PV or Grid.
Figure 6.31 StorageEnergyset
* ForceChg Limit (0A~100A, default 100A)
--Determine the battery charge current limit when inverter operates in force charge status.
6.6.6.1 Control Parameter
Enter the Control Parameter menu as shown below:
Don't change the settings without the permission of technicians.
Battery Module:
SettingsParameter
Control 2015-02-23 19 35 B-BOX LV
.61. .62.
6. Operation 6. Operation
Battery
SettingsSelect 2015-02-23 19 35
NOTE:
5G products support lead-acid battery. Select "Lead-Acid" in the
OverDischg SOC: 020% "Battery Select" and configure the following parameters according
to different lead-acid batteries.
Settings
Lead Acid Battery 2015-02-23 19 35
SET=<ENT> DONE=<ESC>
Battery
SettingsSelect 2015-02-23 19 35 ESC UP DOWN ENT
.63. .64.
6. Operation 6. Operation
6.6.6.3 Meter Set
These settings are used to select the meter types and meter installed locations based
Settings
Lead Acid Battery 2015-02-23 19 35
on the actual configuration.
Settings
Meter Set 2015-02-23 19 35
Environment Temp:
Hot Meter Select
Meter Placement
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
YES=<ENT> NO=<ESC>
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
Eastron 3ph meter (Direct Insert): SDM630 (Optional) “Eastron 3ph meter”
Eastron 3ph meter (With CT): SDM630MCT (Optional) “Eastron 3ph meter”
No meter is connected “No Meter”
.65. .66.
6. Operation 6. Operation
6.6.6.3.2 Meter Placement Mode 1: Self-Use Mode Logic(Maximize the usage of PV)
PV Power Using Priority: Load>Battery>Grid
Grid: Meter is installed at the grid connection point.
Load Support Priority: PV>Battery>Grid
Load: Meter is installed at the load branch circuit.
Battery Charging Power comes from PV. (If “Charging From Grid” is allowed, it can also
Grid+PV Inverter: One meter is connected at the grid connection point, the other meter is
come from Grid)
connected at the AC output port of an extra PV inverter. (Eastron Meter supported).
If “Time of Use” is “Run”, the logic will follow the charging/discharging settings and time
settings as defined in “Time of Use”. For those undefined period of time, it will still follow
Settings
Meter Placement 2015-02-23 19 35
the Self-Use logic.
Time of use for Self use
Install on: Path: Advanced Settings->Storage Energy Set->Storage Mode Select->
Grid Self-Use Mode->ON->Time of use for Self use
Settings
Time of use for Self use 2015-02-23 19 35
1. Self Use Mode 2. Feed in Priority Mode 3. Backup Mode 4. Off Grid Mode ESC UP DOWN ENT
Figure 6.40
Settings Mode Select
Storage 2015-02-23 19 35 Charging from gird self use
Path: Advanced Settings->Storage Energy Set->Storage Mode Select->
Mode: Self-Use Mode->ON->Charging from gird for Self use
Self Use Settings from gird for Self use
Charging 2015-02-23 19 35
Allow
Not Allow
YES=<ENT> NO=<ESC>
Figure 6.41
.67. .68.
6. Operation 6. Operation
Mode 2: Feed In Priority Mode Logic(Feed the excess PV to Grid in order to gain Mode 3: Backup Mode Logic(Keep the Battery at a certain SOC and only use it
subsidies) during power outage)
PV Power Using Priority: Load>Grid>Battery Backup Mode Logic: Keep the Battery at a certain SOC and only use it during power
Load Support Priority: PV>Battery>Grid outage.
Battery Charging Power comes from PV. (If “Charging From Grid” is allowed, it can also Backup SOC Setting Range: From Battery “Overdischarge SOC” to 100%
come from Grid)
PV Power Using Priority: Battery>Load>Grid
If “Time of Use” is “Run”, the logic will follow the charging/discharging settings and time
Load Support Priority: PV>Grid>Battery
settings as defined in “Time of Use”. For those undefined period of time, it will still follow
Battery Charging Power comes from PV. (If “Charging From Grid” is allowed, it can also
the Feed in Priority logic.
come from Grid)
Time of use for Feed for priority
* The “Backup Mode” is not applicable for Lead-acid batteries.
Path: Advanced Settings->Storage Energy Set->Storage Mode Select->
Charging from gird for Backup mode
Feed in Priority Mode->ON->Time of use for Feed for priority
Path: Advanced Settings->Storage Energy Set->Storage Mode Select->Backup Mode->
Settings
Time of use for Feed for priority 2015-02-23 19 35
ON->Backup SOC->Charging from gird for Backup mode
Optimal Income: Stop
Settings from gird for Backup mode
Charging 2015-02-23 19 35
Charge Limit: 050.0A
Discharge Limit: 050.0A
HH MM HH MM HH MM
Charge Time: 22:00----08:00 Total Time: 10:00 Allow
Discharge Time: 08:00----22:00 Total Time: 14:00
Charge Time: 00:00----00:00 Total Time: 00:00
Discharge Time: 00:00----00:00 Total Time: 00:00 Not Allow
Charge Time: 00:00----00:00 Total Time: 00:00
Discharge Time: 00:00----00:00 Total Time: 00:00
NEXT=<ENT> DONE=<ESC>
YES=<ENT> NO=<ESC>
Figure 6.42
ESC UP DOWN ENT
Allow
Not Allow
YES=<ENT> NO=<ESC>
Figure 6.43
.69. .70.
6. Operation 6. Operation
Mode 4: Off-Grid Mode Logic(For Off-grid use and AC-Grid Port Disconnected) 6.6.7 Export power Set
OverDischg SOC for Off-Grid Setting Range: From Battery “Forcecharge SOC” to 100%
This function is to set the export power control.
PV Power Using Priority: Load>Battery
1.Backflow Power. 2. ON/OFF. 3.Failsafe ON/OFF
Load Support Priority: PV>Battery
Setting 1&3 are only valid when Setting 2 is set to "ON"
Battery Charging Power comes from PV.
"ON/OFF" is to enable/disable the export power control function
Off Grid Mode "Backflow Power" is to set the max allowed export power at the meter location
Path: Advanced Settings->Storage Energy Set->Storage Mode Select->Off-Grid Mode-> "Failsafe ON/OFF" is a protection method to prevent excess export power when meter
ON->Off Grid Mode communication fails
Settings
Off Grid Mode 2015-02-23 19 35 Settingspower Set
Export 2015-02-23 19 35
ON/OFF
FailSafe ON/OFF
YES=<ENT> NO=<ESC>
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
.71. .72.
6. Operation 6. Operation
6.6.7.2 ON/OFF 6.6.8 HMI Update
Enable/Disable the function. This function is used to update HMI software.
Values are for reference only.
Settings
ON/OFF 2015-02-23 19 35
HMIUpdate 2015-02-23 19 35
ON
The Current Version:F0
OFF
YES=<ENT> NO=<ESC>
C A N C E = < E S C > U P D AT E S Y S T E M = < E N T >
ON
The Current Version:00
OFF
YES=<ENT> NO=<ESC>
C A N C E = < E S C > U P D AT E S Y S T E M = < E N T >
ESC UP DOWN ENT
.73. .74.
6. Operation 6. Operation
6.6.10 BaudRate RS485 6.6.11.1 AFCI Set
This function is to change the internal communication Baudrate. Inverters have the built-in AFCI function which can detect the arc fault on the
DC circuit and shut down the inverter to prevent a fire disaster.
BaudRate
Settings RS485 2015-02-23 19 35 AFCI Set 2015-02-23 19 35
版本号 2015-02-23 19 35
YES=<ENT> NO=<ESC>
ESC UP DOWN ENT
ESC UP DOWN ENT
WARNING: WARNING:
This function is for maintenance personnel only, wrong operation The "AFCI Level" is reserved for technicians ONLY. Do not change the
will prevent the inverter from working properly. sensitivity otherwise it will lead to frequent false alarms or malfunctions.
Manufacturer is not responsible for any further damages caused by
unauthorized modifications.
SettingsSetting
Special 2015-02-23 19 35
AFCI Set
EPS Mode
YES=<ENT> NO=<ESC>
.75. .76.
6. Operation 6. Operation
6.6.11.2 EPS Mode
During the normal operation, if an DC arc is detected, the inverter will shut down and EPS Mode needs to work with external Solis NPS switching box to achieve ATS
give out the following alarm: switching function.
When grid is available, only the Grid Port is enabled and load is supported through
ARC-FAULT 2015-02-23 19 35 NPS box by the grid.
When grid is lost, Grid Port will be disabled and after the “Switching Time”, the Backup
Port will be enabled and then load is supported through NPS box by the Backup Port.
*It gives up the UPS function of the backup port and manually set the switching time.
Restart Press ESC 3s This mode must work with the Solis NPS switching Box.
Otherwise it may cause some unexpected control mistakes.
Settings
EPS Mode 2015-02-23 19 35
Installer needs to thoroughly inspect the DC circuit to ensure all the cables arecorrectly
fastened.
Once the DC circuit issue has been fixed or it is confirmed to be OK, press “ESC” for 3s
and wait for the inverter to restart.
SET=<ENT> DOWN=<ESC>
.77. .78.
7. Maintenance 8. Troubleshooting
Solis S5-EH1P-L Series inverter does not require any regular maintenance. However, cleaning the The inverter has been designed in accordance with international grid tied standards for
heatsink will help inverter dissipating heat and increase the lifetime of inverter. The dirt on the safety, and electromagnetic compatibility requirements. Before delivering to the customer
inverter can be cleaned with a soft brush. the inverter has been subjected to several test to ensure its optimal operation and reliability.
In case of a failure the LCD screen will display an alarm message. In this case the inverter
CAUTION:
Do not touch the surface when the inverter is operating. Some parts may be may stop feeding energy into the grid. The alarm descriptions and their corresponding alarm
hot and cause burns. Turn OFF the inverter (refer to Section 5.2) and let it messages are listed in Table 8.1:
cool down before you do any maintenance or cleaning of inverter.
When faults occur, the “Fault” state will be shown on the main screen.
Follow the steps below to check what fault occurs.
The LCD and the LED status indicator lights can be cleaned with cloth if they are too dirty
to be read. Steps: Enter → Down → Advanced Information→ Enter →Alarm Message.
Information
Settings
Advanced Information
Advanced Settings
Adcanced
Settings Information 2015-02-23 19 35
Communication Data
Daily Energy
Monthly Energy
.79. .80.
8. Troubleshooting 8. Troubleshooting
Message Name Information Description Troubleshooting Suggestion Message Name Information Description Troubleshooting Suggestion
Off Control device to shutdown 1. Turn on the device in the ON/OFF Setting. 1. Grid side fault, restart the device.
Surge Alarm On-site grid surge If it is still not eliminated, please contact the
1. Confirm whether the inverter is connected manufacturer's customer service.
to an external EPM/meter to prevent
reverse current. Grid voltage exceeds the
2. Confirm whether the inverter is controlled OV-G-V01 upper voltage range
LmtByEPM The device's output is under by an external third-party device.
controlled 3. Confirm whether the power setting of the Grid voltage exceeds the
UN-G-V01 lower voltage range
inverter power control is limited.
4. Verify settings in section 6.6.7 and check Grid frequency exceeds the
your meter readings. OV-G-F01 upper frequency range
Grid frequency exceeds the 1. Confirm whether the power grid is abnormal.
LmtByDRM DRM Function ON 1. No need to deal with it. UN-G-F01 2. Confirm that the AC cable is properly
lower frequency range
connected.
LmtByTemp Over temperature power Unbalanced grid voltage 3. Restart the system and check if the fault
G-PHASE
limited 1. No need to deal with it, the device is in persists.
normal operation. Grid voltage frequency
LmtByFreq Frequency power limited G-F-GLU
fluctuation
.81. .82.
8. Troubleshooting 8. Troubleshooting
Message Name Information Description Troubleshooting Suggestion Message Name Information Description Troubleshooting Suggestion
1. Confirm whether the battery model selection 1. Confirm that the grid is abnormal.
BatName-FAIL Wrong battery brand selection
is consistent with the actual one. DCInj-FAULT 2. Confirm that the AC cable connection is not
The current DC component
(1037 DATA:0000) abnormal.
1. Can failure is a failure of communication exceeds the limit
3. Restart the system, confirm that the fault
between inverter and battery. Check cable
continues.
conditions. Check to ensure you have it
CAN Fail CAN Fail plugged in on the CAN port of the battery and IGBT-OV-I 1. Restart the system, confirm that the fault
IGBT overcurrent continues.
inverter. Check that you are using the right (1048 DATA:0000)
cable. Some batteries require a special
battery from the battery manufacturer. 1. Check whether the surrounding environment
OV-TEM of the inverter has poor heat dissipation.
Module over temperature
1. Verify battery voltage is within standards. (1032 DATA:0000) 2. Confirm whether the product installation
Measure battery voltage at inverter connection meets the requirements.
OV-Vbatt Battery undervoltage detected
point. Contact your battery manufacturer for
RelayChk-FAIL 1. Restart the system, confirm that the fault
further service. Relay failure
(1035 DATA:0000) continues.
1. Restart the system and check if the fault 1. Check the working environment temperature
UN-Vbatt Battery overvoltage detected persists.If it is still not eliminated, please UN-TEM
Low temperature protection of the inverter.
contact the manufacturer's customer service. (103A DATA:0000) 2. Restart the system to confirm if the fault
continues.
1. Check if the internal fan is working correctly PV ISO-PRO01
Fan Alarm Fan alarm or jammed. PV negative ground fault
(1033 DATA:0001) 1. Check whether the PV strings have insulation
OV-DC01 problems.
DC 1 input overvoltage PV ISO-PRO02 2. Check whether the PV cable is damaged.
(1020 DATA:0001) 1. Check if the PV voltage is abnormal PV positive ground fault
(1033 DATA:0002)
2. Restart the system, confirm that the fault
OV-DC02 continues 12Power-FAULT
(1020 DATA:0002) DC 2 input overvoltage 12V undervoltage failure
(1038 DATA:0000)
OV-BUS ILeak-PRO01 Leakage current failure 01
(1021 DATA:0000) DC bus overvoltage
(1034 DATA:0001) (30mA)
UN-BUS01 ILeak-PRO02 Leakage current failure 02
(1023 DATA:0001) DC bus undervoltage 1. Check current leakage to ground.
1. Restart the system, confirm that the fault (1034 DATA:0002) (60mA) Verify your grounding.
UNB-BUS continues. Verify all wires are in good condition and not
DC bus unbalanced voltage ILeak-PRO03 Leakage current failure 03
(1022 DATA:0000) (1034 DATA:0003) (150mA) leaking current to ground.
UN-BUS02 Abnormal detection of ILeak-PRO04
(1023 DATA:0002) DC bus voltage (1034 DATA:0004) Leakage current failure 04
DC-INTF. DC hardware overcurrent 1. Check if the DC wires are connected correctly ILeak_Check Leakage current sensor
(1027 DATA:0000) (1, 2, 3, 4) without loose connection. (1039 DATA:0000) failure
1. Confirm that the grid is abnormal.
OV-G-I 2. Confirm that the AC cable connection is not 1. Confirm whether the grid is seriously distorted.
A phase RMS value GRID-INTF02
(1018 DATA:0000) abnormal. Power grid disturbance 02 2. Check whether the AC cable is connected
overcurrent (1046 DATA:0000)
3. Restart the system, confirm that the fault reliably.
continues.
OV-DCA-I
(1025 DATA:0000) DC 1 average overcurrent OV-Vbatt-H/
Battery overvoltage hardware 1. Check if the battery circuit breaker is tripping.
OV-BUS-H
OV-DCB-I 1. Restart the system, confirm that the fault failure / VBUS 2. Check if the battery is damaged.
DC 2 average overcurrent (1051 DATA:0000)
(1026 DATA:0000) continues.
GRID-INTF. AC hardware overcurrent
(1030 DATA:0000) (abc phase)
.83. .84.
8. Troubleshooting 9. Specifications
Message Name Information Description Troubleshooting Suggestion Technical Data S5-EH1P3K-L S5-EH1P3.6K-L
Input DC (PV side)
OV-ILLC 1. Check whether the backup load is overloaded. Recommended max. PV power
LLC hardware overcurrent 4800W 5700W
(1052 DATA:0000) 2. Restart the system, confirm that the fault
continues. Max. input voltage 600V
Please keep ready with you the following information before contacting us. Output AC(Back-up)
1. Serial number of Solis Single Phase Inverter; Rated output power 3kW
2. The distributor/dealer of Solis Single Phase Inverter (if available); Max. apparent output power 4.5 kVA, 10SEC
3. Installation date. Back-up switch time <20ms
4. The description of problem (i.e. the alarm message displayed on the LCD and the status Rated output voltage 1/N/PE, 220 V/230 V
of the LED status indicator lights. Other readings obtained from the Information Rated frequency 50Hz/60Hz
submenu (refer to Section 6.2) will also be helpful.);
Rated output current 14.0 A/13.5 A
5. The PV array configuration (e.g. number of panels, capacity of panels, number of
THDv(@linear load) <2%
strings, etc.);
Input AC (Grid side)
6. Your contact details.
Input voltage range 187-265V
Max. input current 20.5 A/20.0 A 25.0 A/23.5 A
Frequency range 45-55 Hz/ 55-65Hz
.85. .86.
9. Specifications 9. Specifications
Technical Data S5-EH1P3K-L S5-EH1P3.6K-L Technical Data S5-EH1P3K-L S5-EH1P3.6K-L
Output AC(Grid side) General data
Rated output power 3kW 3.6kW Dimensions(W/H/D) 333*505*249mm
Max. apparent output power 3.3kVA 4kVA Weight 18.3kg
Operation phase 1/N/PE Topology High frequency insolation (for battery)
Rated grid voltage 220 V/230 V Operation temperature range -25℃~+60℃
The grid voltage range 187-265 V Ingress protection IP65
Rated grid frequency 50 Hz/60 Hz Noise emission <20 dB (A)
AC grid frequency range 45-55 Hz/55-65 Hz Cooling concept Natural convection
Rated grid output current 13.7 A/13.1 A 16.4 A/15.7 A Max.operation altitude 3000m
Max. output current 15.0 A/14.5 A 18.5 A/17.5 A G98 or G99, VDE-AR-N 4105 / VDE V 0124, EN 50549-1,
Power Factor >0.99 (0.8 leading - 0.8 lagging) VDE 0126 / UTE C 15 / VFR:2019, RD 1699 / RD 244 /
Grid connection standard UNE 206006 / UNE 206007-1, CEI 0-21, C10/11,
THDi <2% NRS 097-2-1, TOR, EIFS 2018.2, IEC 62116, IEC 61727,
Efficiency IEC 60068, IEC 61683, EN 50530, MEA, PEA
.87. .88.
9. Specifications 9. Specifications
Technical Data S5-EH1P4.6K-L S5-EH1P5K-L* Technical Data S5-EH1P4.6K-L S5-EH1P5K-L*
Input DC (PV side) Output AC(Grid side)
Recommended max. PV power 8000W 8000W Rated output power 4.6kW 5kW
Max. input voltage 600V Max. apparent output power 4.6kVA 5.5kVA*
Rated voltage 330V Operation phase 1/N/PE
Start-up voltage 120V Rated grid voltage 220 V/230 V
MPPT voltage range 90-520V The grid voltage range 187-265 V
Full load MPPT voltage range 155-520V 170-520V Rated grid frequency 50 Hz/60 Hz
Max. input current 15.0A/15.0A AC grid frequency range 45-55 Hz/55-65 Hz
Max. short circuit current 22.5A/22.5A Rated grid output current 20.9 A/20.0 A 22.8 A/21.7 A
MPPT number/Max input strings number 2/2 Max. output current 21.0 A/20.0 A 25.0 A/24.0 A
Battery Power Factor >0.99 (0.8 leading - 0.8 lagging)
Battery Type Li-ion / Lead-acid THDi <2%
Battery Voltage range 42 - 58V Efficiency
Battery Capacity 50 - 2000Ah Max efficiency >97.1%
Maximum Charging Power 5kW EU efficiency >96.5%
Maximum Charge/discharge current 100A Protection
Communication CAN DC reverse polarity protection Yes
Output AC(Back-up) Short circuit protection Yes
Rated output power 5kW Output over current protection Yes
Max. apparent output power 7 kVA, 10SEC Surge protection DC Type Ⅱ/ AC TypeⅡ
Back-up switch time <20ms Ground fault monitoring Yes
Rated output voltage 1/N/PE, 220 V/230 V Integrated AFCI (DC arc-fault circuit protection) Yes
Rated frequency 50Hz/60Hz Protection class / Over voltage category I / II
Rated output current 23.0 A/22.0 A
THDv(@linear load) <2%
.89. .90.
9. Specifications 9. Specifications
Technical Data S5-EH1P4.6K-L S5-EH1P5K-L* Technical Data S5-EH1P6K-L*
G98 or G99, VDE-AR-N 4105 / VDE V 0124, EN 50549-1, MPPT number/Max input strings number 2/2
VDE 0126 / UTE C 15 / VFR:2019, RD 1699 / RD 244 / Battery
Grid connection standard UNE 206006 / UNE 206007-1, CEI 0-21, C10/11,
Battery Type Li-ion / Lead-acid
NRS 097-2-1, TOR, EIFS 2018.2, IEC 62116, IEC 61727,
IEC 60068, IEC 61683, EN 50530, MEA, PEA Battery Voltage range 42 - 58V
Safty/EMC standard IEC/EN 62109-1/-2, EN 61000-6-2/-3 Battery Capacity 50 - 2000Ah
.91. .92.
9. Specifications 9. Specifications
Technical Data S5-EH1P6K-L* Technical Data S5-EH1P6K-L*
Output AC(Grid side) General data
Rated output power 6kW Dimensions(W/H/D) 333*505*249mm
Max. apparent output power 6.6kVA Weight 18.3kg
Operation phase 1/N/PE Topology High frequency insolation (for battery)
Rated grid voltage 220 V/230 V Operation temperature range -25℃~+60℃
The grid voltage range 187-265 V Ingress protection IP65
Rated grid frequency 50 Hz/60 Hz Noise emission <20 dB (A)
AC grid frequency range 45-55 Hz/55-65 Hz Cooling concept Natural convection
Rated grid output current 27.3 A/26.1 A Max.operation altitude 3000m
Max. output current 30.0 A/29.0 A G98 or G99, VDE-AR-N 4105 / VDE V 0124, EN 50549-1,
Power Factor >0.99 (0.8 leading - 0.8 lagging) VDE 0126 / UTE C 15 / VFR:2019, RD 1699 / RD 244 /
Grid connection standard UNE 206006 / UNE 206007-1, CEI 0-21, C10/11,
THDi <2% NRS 097-2-1, TOR, EIFS 2018.2, IEC 62116, IEC 61727,
Efficiency IEC 60068, IEC 61683, EN 50530, MEA, PEA
.93. .94.