DESCRIPTION CORE CUTTING WORKS

DESIGNATION NAME SIGNATURE


Project Manager

Document No. REVISION


0

R749/BIB AL NADHA/MS-01
ARKI GROUP DESIGN LLC

Contents-

1.0 PURPOSE

2.0 SCOPE

3.0 RESPONSIBILITIES

4.0 EQUIPMENT AND MATERIALS

5.0 PROCEDURES

6.0 EMERGENCY PROCEDURES

7.0 REVISION AND APPROVAL

8.0 ENVIRONMENTAL PROTECTIVE MEASURES

9.0 GENERAL SAFETY CONSIDERATIONS


ARKI GROUP DESIGN LLC

1. Purpose

The purpose of this method statement is to define the procedures and safety
measures for core cutting works in Level 10 DIB AL NADHA 1 .

2. Scope

This method statement applies to all core cutting works carried out in Level 10
DIB AL NADHA site and arranging necessary protections to all the associated
banking systems.

3. Responsibilities

a) Project Manager: Overall responsibility for ensuring the core cutting works are
conducted safely and efficiently.

b) Site Supervisor: Responsible for supervising the core cutting activities and
ensuring compliance with the method statement.

c) HSE officer :Ensure the whole process is as per safe system of work and HSE
plan.

Core cutting Team: Responsible for the actual core cutting work, including setup,
operation, and cleanup.

4. Equipment and Materials

 Core cutting drilling machine

 Diamond core bits

 Water source for cooling


ARKI GROUP DESIGN LLC

 Personal protective equipment (PPE)

 Barrier tape and signage

 First aid kit

5. Procedures

5.1 Pre-Work Preparation

 Identifying the core cutting locations and mark them with the help of the
survey team.

 Ensuring that the core drilling machine is in good working condition.

 Selecting the appropriate core bit size for the job.

 Checking that all safety equipment, such as PPE, is available and in good
condition.

 Establishing a safe work zone around the core cutting area using barrier
tape and appropriate signage.

5.2 Safety Measures

 All personnel involved in core cutting works must wear appropriate PPE,
including safety glasses, hearing protection, dust masks, gloves, and steel-
capped boots.

 Ensuring that there is adequate ventilation in enclosed areas.

 Operators of core drilling machines should be trained and competent in


their use.

 Securing the core drilling machine to prevent movement during operation.


ARKI GROUP DESIGN LLC

 Keeping the work area clean and free of tripping hazards.

 Having a first aid kit on site in case of minor injuries.

a)Safety Precautions:

 Ensuring all workers are wearing appropriate personal protective


equipment, such as safety glasses, helmets, gloves, and hearing protection.

 Establishing a safe work zone and warn others in the area.

b)Drilling:

 Positioning the core drill rig over the desired location.

 Setting up water cooling or lubrication system to control dust and heat


generated during drilling.

 Starting the drilling process, ensuring that the core barrel is properly
aligned with the marked location.

 Applying steady pressure and control the drill speed to prevent overheating
and maintain a straight hole.

c)Core cutting:

 As the drill advances, the core is removed within the core barrel.

 Periodically retract the drill to clear cuttings and allow for the removal of
the core .
ARKI GROUP DESIGN LLC

d)Extraction:

 Once the desired depth is reached, stop the drill and retract it.

 Carefully extract the core sample from the core barrel. This may require
using core extractors or other tools.

e)Sample Handling:

Handling the core with care to avoid damages.

f) Cleanup:

Removing the drilling equipment from the site.

Cleaning the area, ensuring that any drilling fluids or debris are properly disposed
off.

g)Documentation:

Maintaining detailed records of the core cutting activities, including location,


depths, core sample characteristics, and any issues encountered during drilling

h)Reporting:

Preparing a report with the findings from core sample analysis and any relevant
recommendations for the project.
ARKI GROUP DESIGN LLC

5.3 Core cutting Process

 Positioning the core drilling machine over the marked location.

 Using water for cooling and dust suppression during core cutting
to prevent overheating and airborne dust.

 Begining the core cutting process, maintaining a stable and


controlled feed rate.

 Periodically inspecting the core bit for wear and replace it when
necessary.

5.4 Post-Work Cleanup

 Turn off the core drilling machine.

 Removing all waste material and clean the work area.

 Storing the equipment properly.

 Disposing of waste materials in accordance with local regulations.


ARKI GROUP DESIGN LLC

6. Emergency Procedures

In the event of an emergency, contact the site supervisor or project


manager immediately. Follow the site's emergency response plan.

a) Stop the Core cutting Process: Immediately halting the core


cutting operation by shutting down the equipment or disengaging
the core bit.

b) Alert Personnel: Notifying all personnel on-site about the


emergency, using a predefined signal or communication method.

c) Evacuate the Area: If the emergency poses a risk to personnel,


evacuate the immediate area to a safe distance. Ensure everyone
is accounted for.

d) Assess the Situation: Determining the nature of the emergency. It


could be related to equipment failure, a hazardous gas release,
structural instability, or other factors.

e) Notify Authorities: If the situation is severe and beyond the


capabilities of site team, contacting relevant authorities or
emergency services for assistance.
ARKI GROUP DESIGN LLC

f) First Aid: If there are injuries, administer first aid as necessary.


Ensuring that trained personnel are available to provide medical
assistance.

g) Control Hazards: If the emergency involves hazardous substances,


taking measures to control and contain them to prevent further
harm.

h) Fire Safety: In case of a fire, use fire extinguishers or other


appropriate fire-fighting equipment. Evacuating the area if the fire
is uncontrollable.

i)Follow Safety Procedures: Adhering to safety procedures and


protocols, such as donning personal protective equipment, as needed.

j)Communication: Maintaining clear and consistent communication


with all personnel and authorities involved in the emergency response.

k)Investigation and Documenting: After the situation is under control,


investigating the cause of the emergency and document the incident
for future analysis and prevention.
ARKI GROUP DESIGN LLC

l)Review and Improve: Using the incident as an opportunity to review


and improve your emergency response procedures for future core
cutting operations.

7. Revision and Approval

This method statement should be reviewed and approved by the


project manager and the safety officer before core cutting works
commence. It may need to be updated if conditions change or if new
risks are identified.

8. Environmental protective measures

Site Assessment: Conducting a thorough site assessment to understand


the potential impacts of core cutting on the ecosystem and surrounding
environment.

Permitting: Ensuring that all necessary permits and approvals are


obtained from local authorities.
ARKI GROUP DESIGN LLC

Site Selection (LEVEL 10): Choosing core cutting locations carefully to


minimize disturbance to protected areas.

Containment: Using containment measures such as silt curtains and


berms to prevent drilling fluids and cuttings from spreading.

Spill Response Plan: Developing and implementing a spill response plan


to address any accidental releases of drilling fluids or contaminants.

Non-Toxic Drilling Fluids: Using environmentally friendly drilling fluids


that are non-toxic and minimal harm.

Minimize Waste: Minimizing waste generation and ensure proper


disposal of cuttings, drilling fluids, and other waste materials in
accordance with regulations.

Best Practices: Following best practices for core cutting techniques,


including proper drilling speed and pressure to minimize disturbance.
ARKI GROUP DESIGN LLC

Restoration: After core cutting is completed, restore the site to its


original condition as much as possible, including re-vegetation.

Monitoring: Implementing environmental monitoring to track the


impact of core cutting activities and ensure compliance with
environmental regulations.

Training: Ensuring that personnel involved in core cutting operations


are trained in environmental protection measures and are aware of
their responsibilities.

EMERGENCY SERVICES
SERVICES AGENCY

Police Dubai 999

Ambulance Dubai 998


Civil Defense Dubai 997

9. General Safety Considerations:

 All workers shall wear proper personal protective equipment as per


company standards.
 All workers will be suitable trained, and safety inducted prior to
commence their work on site.
 Daily task briefing will be held for understanding of the work to
be performed and to discuss safety precautions to be taken.
 Daily checks will be conducted on equipment and machinery prior to
start work.
ARKI GROUP DESIGN LLC

 A first aider shall be present at site and a first aid kit will be
provided in the site office.
 Competent site supervisor should be present at site to
supervise the works.
 Particular Safety precautions to be taken during the execution.
 All persons involved in the works will have relevant experience