1. Read this manual thoroughly before installing, operating, or maintaining this lift.
2. This lift is designed for indoor use only, and should not be installed in a pit or depression.
3. The floor on which the lift is to be installed must be 4-¼” inch minimum thickness concrete, with a mini
mum compressive strength of 3000 psi, and reinforced with steel bar.
4. The lifts have specific electrical requirements as described in the Installation Instructions section of this
manual.
5. This lift has a minimum ceiling height requirement as described in the Installation Instructions section of
this manual.
6. Failure by the owner to provide the recommended shelter, mounting surface, electrical supply, and ceil-
ing height could result in unsatisfactory lift performance, property damage, or personal injury.
2
Section 1
Owner’s Manual
Safety Instructions:
1. Do not raise a vehicle on the lift until the installation is completed as described in this manual.
2. Anyone who will be in the vicinity of the lift when it is in use should read and refer to the following
publications supplied with this lift:
• “INSTALLATION AND OWNERS MANUAL”, I MAN 994322
• “LIFTING IT RIGHT”, ALI SM93-1.
• “AUTOMOTIVE LIFT SAFETY TIPS”, ALI-ST90.
• “VEHICLE LIFTING POINTS FOR FRAME ENGAGING LIFTS”, ALI/LP-GUIDE.
• “SAFETY REQUIREMENTS FOR OPERATION, INSPECTION, AND MAINTENANCE”, ANSI/ALI
ALOIM-2006.
3. Technicians should be trained to use and care for the lift by familiarizing themselves with the publica-
tions listed above. The lift should never be operated by an untrained person.
4. Always position the arms and adapters properly out of the way before pulling the vehicle into, or out of
the bay. Failure to do so could damage the vehicle and/or the lift.
5. Do not overload the lift. The capacity of the lift is shown on cover of this document and on the lift’s serial
number tag.
6. Positioning the vehicle is very important. Only trained technicians should position the vehicle on the lift.
Never allow anyone to stand in the path of the vehicle as it is being positioned.
7. Position the arms to the vehicle manufacturer’s recommended pickup points. Raise the lift until contact
is made with the vehicle. Make sure that the arms have properly engaged the vehicle before raising the
lift to a working height.
8. Keep everyone clear of the lift when the lift is moving, the locking mechanism is disengaged, or the
vehicle is in danger of falling.
9. Unauthorized personnel should never be in the shop area when the lift is in use.
10. Inspect the lift daily. The lift should never be operated if it has damaged components, or is malfunction-
ing. Only qualified technicians should service the lift. Replace damaged components with manufac-
turer’s parts, or equivalent.
11. Keep the area around the lift clear of obstacles.
12. Never override the self-returning lift controls.
13. Use safety stands when removing or installing heavy vehicle components.
14. Avoid excessive rocking of the vehicle when it is on the lift.
15. To reduce the risk of personal injury, keep hair, loose clothing, fingers, and all body parts away from mov
ing parts.
16. To reduce the risk of electric shock, do not use the lift when wet, do not expose the lift to rain.
17. To reduce the risk of fire, do not operate equipment in the vicinity of open containers of flammable liquids
(gasoline).
18. Use the lift only as described in this manual, use only manufacturer’s recommended attachments.
19. Unusual vehicles, such as limousines, RV’s, and long wheelbase vehicles, may not be suitable for lifting
on this equipment. If necessary, consult with the manufacturer or the manufacturer’s representative.
20. The troubleshooting and maintenance procedures described in this manual can be done by the lift’s
owner/employer. Any other procedure should only be performed by trained lift service personnel. These
restricted procedures include, but are not limited to, the following: cylinder replacement, carriage and
safety latch replacement, leg replacement, overhead structure replacement.
21. Anyone who will be in the vicinity of the lift when it is in use should familiarize themselves with follow-
ing .Caution, Warning, and Safety related decals supplied with this lift, and replace them if the
are illegible or missing:
3
Monthly Maintenance:
1. Lubricate the four inside corners of the legs with heavy duty bearing grease.
2. With lift lowered check the hydraulic fluid level. If necessary add oil as described in the Installation
Instruction section of this manual
3. Check carriage latch synching: Latches should click at the same time. If necessary adjust equaliza
tion cables as described in the Installation Instruction section of this manual.
4. Check tightness of all bolts.
5. Check anchor bolt tightness. If the anchor bolts are loose, they should be re-torqued to 90ft/lbs.
• Check the nuts for tightness every week for the first month, and every month afterwards.
6. Replace worn or broken parts with lift manufacturer’s parts, or their equivalent.
4
Troubleshooting:
5
15. At full rise the latch will not disengage and the lift cannot be lowered.
• If the equalization cables are out of adjustment the carriages are out of sync, and when the lift is
at full rise one of the safety latches may not have the clearance to disengage and allow the lift to
lower.
* To lower the lift
» Raise the lift to full height.
» Make sure both latches are engaged.
» Use a hydraulic jack and a length of pipe to raise the carriage with the lock which
is sticking enough to disengage the safety latch.
» Remove the jack and pipe.
» Pull the latch release handle to disengage the latches.
» Lower the lift and remove the vehicle.
» Readjust the cables as described in the Installation Instruction section of this
manual.
16. Power Unit will not stop running
• Switch is damaged, turn off power to the lift and replace switch.
6
6. Lift Lockout/Tagout Procedure
Purpose
This procedure establishes the minimum requirements for the lockout of energy that could cause injury to per-
sonnel by the operation of lifts in need of repair or being serviced. All employees shall comply with this proce-
dure.
Responsibility
The responsibility for assuring that this procedure is followed is binding upon all employees and service person-
nel from outside service companies (i.e., authorized installers, contractors, etc.). All employees shall be instruct-
ed in the safety significance of the lockout procedure by the facility owner/manager. Each new or transferred
employee along with visiting outside service personnel shall be instructed by the owner/manager (or assigned
designee) in the purpose and use of the lockout procedure.
Preparation
Employees authorized to perform lockout shall ensure that the appropriate energy isolating device (i.e., circuit
breaker, fuse, disconnect, etc.) is identified for the lift being locked out. Other such devices for other equipment
may be located in close proximity of the appropriate energy isolating device. If the identity of the device is in
question, see the shop supervisor for resolution. Assure that proper authorization is received prior to performing
the lockout procedure.
7. Operating Conditions
Lift is not intended for outdoor use and has an operating ambient temperature range of 41º-104ºF (5º-40ºC).
7
Section 2
Installation Instructions
Procedure:
1.
Read this manual thoroughly before installing, operating, or maintaining this lift.
2.
Site Evaluation and Lift Location:
A. Always use an architect’s plan when provided. Before unpacking the lift entirely, deter
mine if the site is adequate for the lift model being installed see figures 1 and 2 for typical
bay layout and ceiling height requirements.
B. Snap chalk lines to identify the lift’s centerline.
C. Snap a chalk line parallel to the lift’s centerline, spaced 9” toward the rear of the bay.
This line represents the back edge of the leg bases.
D. Snap chalk lines parallel to the lift’s centerline spaced 68-1/2 to the left and 68-1/2 to the
right. These lines represent the APPROXIMATE outside edges of the leg bases,
* DO NOT USE THESE LINES TO POSITION THE LEGS, FOLLOW THE INSTRUCTIONS IN THIS MANUAL.
8
12’ Minimum
Distance To
137” Standard Setting Nearest Obstruction
131” Narrow Setting Typical
9’ Minimum 64”Optional
Distance To 68-1/2” DP10a
Nearest Obstruction
Typical
15’ Minimum
Distance To
Nearest Obstruction
Nearest Obstruction
Typical
12’ Minimum
137” Standard Setting Distance To
131” Narrow Setting Nearest Obstruction
Typical
68-1/2” DP10S
11’ Minimum
Distance To
Nearest Obstruction
Typical
13’ Minimum
Distance To
Nearest Obstruction
Typical
Figure 1
9
Figure 2
3. Unpack the lift. Remove the swing arms, bolt box, power unit box, and overhead beam.
A. Save all packing hardware, as these components are necessary to complete the installation.
B. Remove the ½” bolts from the uprights which hold the two legs together.
C. Remove the top leg. Do not stand legs up, instead lay the legs flat on their backs on the floor.
4. Attach the cylinder mount or uprights. Attach the cylinder mounts or uprights to the legs using four ½” X
1-¾” bolts, washers and nuts as shown in figure 3a. Assemble overhead beam using (2) M10 x 1.5 bolts
and M10 serrated flanged lock nuts, figure 3.
1 Slot Exposed
Narrow Setting
2 Slots Exposed
Standard Setting
Figure 3
10
5.Install hydraulic cylinders, fittings, hoses, and cables
A. Warning: When attaching hydraulic fittings with pipe threads to the cylinders use Teflon tape.
DO NOT start the Teflon tape closer than 1/8” from the end of the fitting. Failure to comply may cause
damage to the hydraulic system.
B. Warning: When tightening connections with flared (JIC) fittings, always follow the following tightening
instructions. Failure to follow these instructions may result in cracked fittings and / or leaks.
11
* Again, tighten the fitting hand tight, then rotate the nut portion of the fitting 2-1/2 hex flats.
C. Install the cylinders to the uprights with 1/2" x 5" Grade 8 bolt, cylinder bushings, washers, and nut, Figure
4. The port near the rod end of the cylinders should be positioned pointing to the leg’s open side.
D. Remove the plugs and install the bushings into the ports at the top of the cylinders.
E. Connect the shortest hydraulic hose to one of the runs on the JIC tee fitting.
F. Connect the longest hydraulic hose to the other run on the JIC tee fitting.
G. Connect the remaining hydraulic hose to the branch on the JIC tee fitting.
H. Install the rubber grommet into the hole in the mainside leg.
I. Connect a male pipe thread to male JIC elbow to the port near the rod end of each cylinder. The fittings
should face towards the center of the lift.
J. Connect the free end of the shortest hydraulic hose to the elbow on the cylinder in the mainside leg. This
connection should be hand-tight only.
K. Feed the shortest remaining hose through the rubber grommet, from inside the leg out. Feed this hose
down through the hose guide welded to the outside of the leg. This hose will attach to the power unit.
1/4 TUBE
1/4 TUBE 1/4 NPT
1/4 NPT SWIVEL BRANCH TEE 1/4 TUBE SWIVEL ELBOW
WITH 3/8 NPT BUSHING WITH 3/8 NPT BUSHING
LEG SHOWN
CUT AWAY
LEG SHOWN
CUT AWAY
Figure 4
12
L. Feed the long hose through the cylinder mount or upright tube along the cylinder and out the end.
M. Connect push in connectors to the base port of each cylinder. The tee should be attached to the main
side cylinder.
N. Feed one end of an equalization cable down through the rightmost hole in the carriage top, figure 5. Con-
tinue to feed the cable until it extends out the bottom of the carriage. Attach a nylon insert locknut
and washer to the end of the cable so that 1/8” of cable stud extends past the end of nut. Pull the op-
posite end of the cable until the washer contacts the carriage top. Repeat for the other cable/carriage.
Note: For narrow setting, use cable attachment further down inside carriage.
Figure 5
O. Attach the cylinders to the carriages. Make sure the snap ring on the cylinder rod is in the groove.
Taking care not to damage the threads on the cylinder rod, pull carriage up to the cylinder and feed the
rod through the hole in the carriage plate until the snap ring contacts it. Attach the full nut to the rod
and tighten until the cylinder rod turns. Hold the full nut with a wrench and tighten a jam nut against
it. Repeat for the other cylinder.
* Do not hold the cylinder rod in a way that could damage the finish. Cylinder leaks caused by dam
aged rods are not covered by warranty.
6. Carriage Placement. Disengage the latch by pulling out the latch on the column, figure 6.
Slide the carriage to the leg’s baseplate. Engage the latch by releasing the latch. Slide the carriage
up until the first "click" is heard. Repeat the process for the other carriage.
13
Pull Latch
Out
Figure 6
A. Raise the Mainside leg only and position it where it is to be secured, figure 2.
B. The anchor bolts must be installed at least 5-11/16" from any edge or seam in the concrete
C. The concrete must be at least 4-¼” thick with a compressive strength of 3,000 psi.
D. Using the leg as a template, drill the anchor bolt holes for the Mainside Leg Only!!
* Use a hammer drill with a Carbide tip, 3/4" diameter, solid drill bit. The bit tip diameter
should be to ANSI Standard B95.12-1977. (.775" to .787").
14
E. Assemble the washers and nuts onto the anchor bolts. Thread the nuts onto the anchor bolts where the
tops of the nuts are just above the top of the bolts, figure 7. Using a hammer, carefully tap the anchor
bolts into the concrete until the washer rests against the baseplate. Do not damage the nuts or threads.
Figure 7
F. Using a level, plumb the mainside leg both side to side and front to back. Shim the leg as necessary next
to and on both sides of the anchor bolts, figure 8. If more than 1/2" of shimming is required, do not use
the anchors and shims provided with the lift. Use longer anchors and fabricate larger shims from
steel flat, 1/4" or 1/2" thick by 2", or more, wide.
Nut
Anchor
Flat
Washer
Figure 8
G. Once the leg is plumb tighten the anchor bolts to 150 ft-lbs. Do not use an impact wrench on anchor
bolts.
* If after tightening the anchor supplied with the lift extends more than 2-1/4” above the floor the
anchor does not have enough embedment.
* If an anchor will not reach 150 ft-lbs or does not have enough embedment or adequate spacing
cannot be achieved, replace the concrete under the leg with a 4’ X 4’ X 6” thick pad of 3,000 psi
concrete keyed under the existing floor. Let the concrete cure before reinstalling the lift.
15
H. Recheck the leg’s plumbness after tightening the anchor bolts. Add shims if necessary.
I. Raise the offside leg and position it where it is to be located, figure 2. Do not drill holes for anchors.
8. Overhead assembly
1/2” x 1-3/4“HHCS
ut.
x Lo ck N
ang e He
20 Fl
1/4”-
cer
Bar Spa
Switch
1ø Overhead
1ø Overhead Switch Power Unit Column
Switch Bar
1/4”-20HHCS x 2” Lg.
Figure 9
* Slide the end of the padded switchbar without a mounting hole in it through the slot in the overhead
switch assembly. Connect the padded switchbar to the inside hole in the overhead beam using a
cylindrical spacer, ¼-20 X 1-3/4 HHCS, and Flange Nut, figure 9.
B. For three phase lifts: Remove Limit Switch cover, Fig. 9a. Insert Actuator end of Switch Bar into slot
located inside Limit Switch, Fig. 9a. A small amount of silicone sealant on the lower part of the actuator will help
hold it in place. Insert 1/4”-20NC x 2” HHCS through pivot hole in end of Switch Bar. Then secure HHCS and
Switch Bar to overhead as shown, using 3/4” spacer and 1/4”-20NC Locknut. Tighten Hex bolt leaving 1/16” gap
between the spacer and the overhead assembly, Fig. 9. Replace limit switch cover.
16
C. Attach the overhead beam to the uprights.
* Raise the overhead beam and secure it to the cylinder mount or upright using two 1/2 x 1-3/4
bolts, washers and nuts on each end, Figure 9.
Remove Screws
And Cover
Actuator
Figure 9a
17
9. Anchoring offside leg
A. Using a level check the alignment and plumbness of the entire structure. Plumb the offside leg both side
to side and front to back.
B. The base of the leg may vary from the preliminary layout, as it is more important that the leg be perpen-
dicular to the floor and parallel to the other leg.
C. Install the anchor bolts and shim the base as described in the earlier “Leg positioning and anchoring”
step.
10. Routing carriage equalization cables and offside hose, Figure 10.
Figure 10
A. The carriages should be resting on the same safety rack tooth. Measure the height above the baseplate
for each carriage. The measurements should be within 3/8" of each other. Make a note of the two
measurements.
18
B. One end of each cable should already be attached to each carriage. Feed the other end of the cable up
through the top of the leg as shown, Figure 10,
Figure 11
C. Secure the cable end to the carriage top with a nylon insert nut and washer. Do not tighten the cable at
this time.
D. Repeat the process for the other cable, taking care not to cross them.
E. Take out the slack, but do not tighten, in both cables by turning down the nuts on the top of each carriage
top. Use vise grips to hold the cable end, but be very careful not to damage the threads.
F. The carriages must remain at the same lock position while the cables are being tightened. Overtighten-
ing of one cable could raise the carriage in the opposite leg and cause the carriage safety latches to be
out of sync.
G. Alternately tighten the cable nuts at both carriages until the cables are tightened. Correct tension in
the cables is indicated by being able to pull the cables together with approximately 15 pounds of effort at
their midpoint in the leg.
H. Measure and compare the carriage heights to the earlier measurement, or check that the safety locks
will not disengage to verify that neither carriage has been raised. If a carriage has been raised
more than 1/8", loosen the cables and repeat the procedure.
19
I. If the cables are installed correctly, both carriages will raise together. If equipment capable of lifting
the carriages is readily available, lift one of them just enough to disengage the locks and carefully
lower to the ground. This will simplify the cylinder bleeding procedure.
A) Install latch cable sheave and retaining rings in upper slot of power unit column as shown, Fig. 13.
B) Slip loop end of cable over end of shoulder screw on right side latch control plate, Fig. 13.
C) Feed the other end of the cable through the latch cable sheave slot making sure that the cable is running
under the bottom side of the latch cable sheave and inside the right column, Fig. 13.
D) Attach latch cable conduit guide brackets to overhead as shown, Fig. 12 & Fig. 12a. Always use the holes on
the approach side of the lift. HHCS should be in hole nearest the center of the overhead, Fig. 12a.
E) Route cable up inside column and through the latch cable guide, Fig. 12a & Fig. 14.
IMPORTANT Using wire ties provided, tie off cable guide to column extension as shown, Fig. 12a. Guide must
be attached in hole closest to the outside edge of the column on the NON-APPROACH side.
F) Continue routing cable to the left column latch cable guide, Fig. 12 & Fig. 14, routing the cable through the left
column latch cable guide, Fig. 12.
IMPORTANT Using wire ties provided, tie off cable guide to column extension as shown, Fig. 12a. Guide must
be attached in hole closest to the outside edge of the column on the NON-APPROACH side.
G) Bring the cable down inside the left column and feed the end of the cable through the lower latch cable
sheave slot so that the cable is now back outside the column, Fig. 15.
H) Install latch cable sheave and retaining rings in lower slot of non-power unit column as shown, Fig. 15.
I) Route cable under the bottom side of the latch cable sheave, Fig. 15.
J) At this point you MUST install the latch handle, jam nut, and right column latch cover Fig. 13 & Fig. 16. Install
latch handle ball, Fig. 16.
K) Insert cable in cable clamp along one side, loop around shoulder screw and back down, inserting cable
along other side of cable clamp, Fig. 15. Place top back on clamp, barely tightening.
L) Next, pull the control plate down, Fig. 14 & Fig. 15, to eliminate any clearance between the control plate slot
and the latch dog pin, Fig. 14.
M) Using Pliers, pull cable tight and secure the clamp close to the shoulder screw. Tighten clamp.
12. Mounting the power unit. Attach four 5/16" x 1-1/4" bolts to the highest two and lowest two holes in the
mounting bracket with 5/16" plain nuts. Attach the power unit, to these bolts and secure with 5/16" nylon
insert nuts.
20
1/4-20×1 HHCS
1/4-20 Flange Hex Lock Nut
M10×1.5×20Lg.HHCS
M10×1.5 Esrrated Flanged Locknut
Hose Clamp
Cable End
Bracket
Figure 12
Figure 12a
21
Latch Cable Sheave Latch Cable Guide
See Note
Right Column
Shoulder Bolt
Cable Clamp
A. The right side of the power unit from the controls has one open port. Attach the o-ring
elbow to this port with the open end up.
B. Attach the hose hanging from the rubber grommet at the top of the leg to the elbow on the
power unit.
C. Attach the hose hanging from the offside upright to the elbow at the bottom of the offside
cylinder hand-tight.
D. To prevent the carriages from rubbing the hoses, pull the hoses upward taking out any
slack between the cylinder fitting port and the cylinder mount. Secure the hoses to the
mainside cylinder with wire tie around the tee and the cylinder, the tee should be
positioned to aim directly out through the grommet, Figure 17. Secure the hose to
the offside cylinder at approximately the same height with a wire tie.
Figure 17
E. Any excess hose should be taken up in the uprights, or at the corners between the up
rights and the overhead.
F. Add fluid. Remove the fill level screw near the top of the power unit tank. Remove the fill-
cap from the tank and fill with Dexron III ATF or hydraulic oil that meets ISO-32, until fluid
reaches the bottom of the screw hole. Replace the fill screw and tank breather.
14. Electrical.
A. Single Phase
* Have a certified electrician establish 208-230V, single phase, 60 Hz, 20 amp, Figure 18, power
supply to motor and overhead switch .
* Single phase motor cannot be run on 50 Hz line without modifications in the motor.
23
Three Phase
* Three phase 208-240V, use 20 amp fuse. For three phase 460V -480V and above, use 10 amp fuse,
Figure 18a.
Figure 18
Overhead Up
Limit Switch Switch
Black Black
Black
230V
50 & 60Hz Green M
1Ø
White
White
White
Green
Black 208-230V 60Hz
Single Phase
Overhead Switch
Max. Voltage: 277V
Max. Current: 25A
Figure 18a
24
NOTE: Two Different Drum Switches were used
please select one of the two options below.
NOTES:
1. Unit not suitable for use in unusual conditions. Contact
Rotary for moisture and dust environment duty unit.
2. Control Box must be field mounted to power unit.
3. Motor rotation is counter clockwise from top of motor. FOR 3 Ø POWER
UNITS: Attach Box using
L1 1 2 1 2 M5 x 10 PHMS, Plated
3 Phase L2 3 4 5 6
L3 5 6 7 8 MOTOR
Supply
PE Capacitor Box Attachment
OVERHEAD SWITCH DRUM Option One
(WHERE APPLICABLE) SWITCH
Re-seal Between
Gasket Box And Spacer
With Silicone Capacitor
Drum Switch Sealer Box
And Cover
L1 1 2 1 2
Capacitor Box Attachment
3 Phase L2 3 4 3 4
L3 5 6 5 6 MOTOR Option Two
Supply
PE
25
Single Phase Power Unit Three Phase Power Unit
MOTOR OPERATING DATA TABLE - SINGLE PHASE MOTOR OPERATING DATA TABLE - SINGLE PHASE
LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE
208-230V 50Hz. 197-253V 208-240V 50/60Hz. 197-253V
208-230V 60Hz. 197-253V 400V 50Hz. 360-440V
440-480V 50/60Hz. 396V-528V
575V 60Hz. 518V-632V
IMPORTANT: Use separate circuit for each power unit. Protect each circuit with time delay fuse or circuit
breaker. For single phase 208-230V, use 20 amp fuse. Three phase 208-240V, use 20 amp fuse. For three phase
460V and above, use 10 amp fuse. All wiring must comply with NEC and all local electrical codes.
26
15.
Bleeding the hydraulic system, Figure 17.
A. Loosen the connections between the hoses and fittings attached to the cylinders. Do not
loosen the connections between the fittings and the cylinders themselves.
B. Run the power unit until fluid appears at the mainside cylinder port. Tighten that hose
connection.
C. Run the power unit until fluid appears at the offside cylinder port and there is no more air.
Tighten that hose connection.
D. Lower the lift to the ground. If the lift is on the safety latches, raise the lift enough to dis
engage the latches and then lower.
E. If the carriages were on the ground when the bleeding process was begun, no further
bleeding is required. If not, repeat the previous steps for bleeding the hydraulic system.
F. Add fluid to the system as previously described.
Figure 19
27
16. Assembling the arms and arm restraints
B. Position the gears with word TOP against the bottom of the arms in the orientation shown
in Figure 20. Attach the gears to the arms with (2) 3/8-16NC X 1-1/2 long HHCS. Do not
tighten at this time.
C. Position the restraint pawls on the carriage to mate with the gears on the arms.
A. Install arm stop on Power Unit Column rear (long) arm. Long arm must be installed on power unit
side of column.
B. Raise arm pin out of carriage until you have enough room to slide the arm stop into place.
* Place the arm pin down through the arm stop and into lower part of clevis.
POWER UNIT
BRACKET
ARM STOP
Figure 20
28
* Install the swing arms and swing arm pins. If the arms are of different lengths, the longer arms go
to the rear or drive in side of the lift, and the short arms go to the front, Figure 20.
* Don’t force the gears, it may be necessary to pull up on the restraint actuator pin in order to
install the swing arm pin.
* Tighten the gear bolts to 30-34 ft-lbs.
* Install the swing arms and swing arm pins. If the arms are of different lengths, the longer arms go
to the rear or drive in side of the lift and the short arms go to the front, Figure 20.
* Don’t force the gears. It may be necessary to pull up on the restraint actuator pin in order to
install the swing arm pin.
18. Lubricate the four inside corners of both legs with heavy duty bearing grease.
E. When the carriages are lowered onto the locks, both locks should engage completely.
F. The first time a vehicle is placed on the lift, raise it no higher than three feet. Lower the
vehicle onto the safety latches. Raise the lift a few inches and release the lock then lower
the vehicle to the floor.
G. Raise the vehicle to full height and lower the carriages onto the safety latches. Lower the
vehicle to the floor.
H. After cycling the lift ten times with a vehicle on it, recheck the tightness of the anchors to
at least 90 ft-lbs.
29
49
9 52
53 2 68 52
52
17
1
38
39 40 53 22
36 21
4 53 20
19
42 61 12
58 43
13
59
23
22 73
21 69
19 62
63 66
67 70
93 15
14
16
92
95
81
90
94
72
82
80 97
83 79
34 96
33 65
28
28
29
29
35
60
26
64
8 57
56
7
6 5
51
3 18
11 85
10
84
30
105 104
115 103
114
111
92
112
107 108
110
102
101 109
95
100
99
98
94
91
101
100 108 93
99
98 103
111
112
110
31
1 Mainside Overhead Weld NDP10-3000A Three Phase Overhead Switch N432
2 Offside Overhead Weld NDP10-3000B 44 NA NA
3 Stackable Pad Weldment 106605 45 NA NA
4 Overhead Bracket NDP10-3004 46 NA NA
5 Arm Restraint Gear N2122 47 NA NA
6 Arm Restraint Pawl N2121 48 NA NA
7 Arm Restraint Actuator Pin 143536 49 Cable and Lock Nut
8 Arm Restraint Spring 143537 5/8-11 Nylon Insert Locknut 913303 or 40743
9 Hose Clamp G3T-8005 dia.16mm washer 913206 or 40970
10 1/4-20Nylon Insert Hex Nut 911401 dia.18mm washer
11 1/4 Washer 911405 Cable 1070911
12 1/4-20 HHCS ×1/2 Lg 911421 Cable Extended Height 1072901
13 1/4-20 HHCS ×2 Lg 911481 50 NA NA
14 5/16-18 Hex Nut 911701 51 1/4 Roll Pin ×1-1/2Lg 991060
15 5/16-18 Nylon Insert Lock Nut 911703 52 M10×1.5×20Lg.HHCS 41536
16 5/16-18×1-1/4HHCS Grade 5 911751 53 M10×1.5 Esrrated Flanged Locknut 41655
17 Cable Sheath N618 54 24" Wire Tie 991082
EH Cable Sheath NDP10-3005 55 Shim 991127
18 3/8-16NC HHCS 912061 56 Swivel Pad Rubber Insert 991234
19 1/2-13 Hex Nut 912601 57 1/4-20×1-1/4 Elev.Bolt 991243
20 1/2-13 Nylon Insert Lock Nut 912603 58 Switch Bar Spacer 991480
21 1/2 Washer 912605 59 Overhead Switch Bar, Single Phase 991481
22 1/2-13 ×1-3/4 HHCS 912671 Overhead Switch Bar, Three Phase N434
23 1/2-13 ×5 HHCS 912791 60 3/8NC×1/2Lg.Self-tapping screw 991487
24 3/4-16 Hex Nut 913602 61 1/4-20 Flange Hex Lock Nut 991490
25 3/4-16 Hex Jam Nut 913611 62 Rubber Grommet 991491
26 3/4×5-1/2 Anchor Bolt 913828 63 Hose Extension (Extended Rise 992167
27 NA NA Only)
28 Offside Leg Assembly 1070128 64 3/4 Klip Ring 991504
29 Offside Leg Weldment NDP10-1100a 65 Single Phase Power Unit P3397
30 Mainside Leg Assembly 1070127 Single Phase Power Unit 50Hz P3398
31 Mainside Leg Weldment NDP10-1000a Three Phase Power Unit P3414
32 NA NA 66 Mainside Hose 992156
33 Carriage Weld NDP10-2000 67 Power Unit Hose 992101
34 Left Arm Assembly (Asymmetrical) 1070669 68 Offside Hose NDP10-9801-1
35 Right Arm Assembly (Asymmetrical) 1070670 69 Cylinder 992317
36 Sheave Pin 0970802 Cylinder Extended Rise 992327
37 Cylinder Bushing 0970804 70 3/8 JIC to 3/8 NPT Elbow 992402
38 Cable End Bracket N619 71 NA NA
39 Cylinder Mount/Upright Assembly 1070800 72 9/16 O-Ring to 3/8 JIC Elbow 992410
Cylinder Mount/Upright Assembly 1072800
Extended Rise/Extended Height
40 Cylinder Mount/Upright Weldment 1070801
41 Small Parts Bag 1070907
42 Cable Sheave 1070900
43 Single Phase Overhead Switch N413
32
73 3/8 JIC Tee 992502
75 NA NA
76 NA NA
77 NA NA
78 NA NA
79 Rub Block 995120
80 Arm Pin 995430
81 6" Pad Extension 995550
82 3" Pad Extension 995560
83 1-1/2" Pad Extension 996220
84 Symmetric Arm Assembly 1080601
85 Rear Arm Assembly (Asymmetric) 1070639
86 NA NA
87 NA NA
88 NA NA
89 NA NA
90 Control Box (3 Phase) FA7366
91 Latch Release Cable FJ7600
92 Mainside Latch Cover PV-1001
93 Offside Latch Cover PV-1002
94 Handle Ball B84-35
95 Latch Handle PV-1007
96 Adapter Bracket NDP10-1010
97 Adapter Bracket Kit NDP10-D4
98 dia. 20mm Circlip B60-20
99 dia. 20mm Washer B41-20
100 Latch Pin PV-1006
101 Spring PV-1040
102 Spring PV-1009
103 Spacer PV-1015
104 Latch Block PV-1005
105 M6×40mm Spring Pin B51-6×40
106 Control Plate PV-1003
107 Hex Bolt PV-1008
108 M6×16mm Bolt B20-6×16
109 M10 Nut B30-10
110 M6×10mm Bolt B231-6×10
111 Sheave PV-1013
112 dia. 20mm Circlip B60-10
113 Spring PV-1009DC
114 Control Plate PV-1004
115 M6×16mm Bolt B21-6×16
116 1/4-20×1 HHCS 40108
33
NOTES
34
NOTES
35
May 2010 IN60010