0% found this document useful (0 votes)
10 views2 pages

DeviceNet - ABC-DEV - Instguide - Revb

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

DeviceNet - ABC-DEV - Instguide - Revb

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Table 2 Input area (drive to PLC) 3AFE 64679716 REV B (EN)

EFFECTIVE: 23.10.2003
1+2 3+4 5+6 7+8 9+10 11+12 13+14 15+16
ABC SW Drv1 SW Drv1 Act1 Drv1 Act2 Drv2 SW Drv2 Act1 Drv2 Act2 Drv3 SW
17+18 19+20 21+22 23+24 25+26 27+28 29+30 31+32 ABC-DEV DeviceNet Gateway Module
Drv3 Act1 Drv3 Act2 Drv4 SW Drv4 Act1 Drv4 Act2 Drv5 SW Drv5 Act1 Drv5 Act2
Installation Guide
33+34 35+36 37+38 39+40 41+42 43+44 45+46 47+48
Drv6 SW Drv6Act1 Drv6 Act2 Drv7 SW Drv7 Act1 Drv7 Act2 Drv8 SW Drv8 Act1
49+50 51+52 53+54 55+56 57+58 59+60 61+62
Drv8 Act2 Drv9 SW Drv9 Act1 Drv9 Act2 Drv10 SW Drv10 Act1 Drv10 Act2 Introduction This guide is intended for people who are responsible for
commissioning and using an ABC-DEV DeviceNet gateway module.
Quick Start-up After switching on the external power supply to the AnyBus It is assumed that the drive is installed and ready to operate before
Communicator the amount of physically connected drives to the subnet starting the installation of the adapter module. In addition to
has to be set and the subnet communication has to be started by conventional tools, the drive manuals should be available during the
means of the ABC CW register. To start the subnet communication with installation as they contain important information not included in this
10 drives write the value 60 hex to the ABC CW register in the PLC guide. If an RS 232/485 adapter is used with the drive, have also its
(see Table 1). To start the communication with less than 10 drives write manual available. Additionally the User Manual AnyBus
the value x72 hex to the ABC CW register, where x is the amount of Communicator, included in the package, contains useful information on
drives (1 to 9) physically connected to the subnet. Note that the the mechanical installation, electrical connections, diagnostics and
required memory space in the PLC is always 62 byte for input and supported features. Refer to AnyBus Communicator manual if any of
output regardless of the amount of drives connected to the subnet. The the module configurations needs changing. Follow the safety
configuration procedure has to be repeated each time the power supply instructions mentioned in these manuals. All related documents to the
to the AnyBus Communicator is turned on. AnyBus Communicator and its configuration files can be found on the
When the subnet communication is running the value of the Drv x SW website www.anybus.com.
registers of the connected drives will differ from zero. The subnet status
Content of the Delivery Check that you have received in the product package the AnyBus
LED is lit red if any of the drives does not communicate on the subnet.
Communicator module, User Manual AnyBus Communicator and this
The response time of the communication is app. 200 ms/drive guide.
This guide contains information on the drive topology, pre-set
configuration of the ABC-DEV and some basic information for quick
start-up.

Warranty The warranty for your ABB drive and options covers manufacturing
defects. The manufacturer carries no responsibility for damage due to
transportation or unpacking. In no event and under no circumstances
shall the manufacturer be liable for damages and failures due to
misuse, abuse, improper installation, or abnormal conditions of
temperature, dust, or corrosives, or failures due to operation above
rated capacities. Nor shall the manufacturer ever be liable for
consequential and incidental damages.
The period of manufacturer’s warranty is 12 months, and not more than
18 months, from the date of delivery. Extended warranty may be
available with certified start-up. Contact your local distributor for details.

ABC-DEV / EN
3AFE 64679716 REV B
EFFECTIVE: 23.10.2003
SUPERSEDES: 20.9.2002

Your local ABB Drives company or distributor may have a different


warranty period, which is specified in their sales terms, conditions, and
ABB Oy warranty terms.
Drives
P.O. Box 184
FIN-00381 Helsinki
FINLAND 1 ABC-DEV Installation Guide
Telephone: +358 10 22 11
Telefax: +358 10 222 2681
If you have any questions concerning your ABB drive, contact your Communication Set-up After the ABC-DEV has been mechanically and electrically installed,
local distributor or ABB Drives office. the master station and the drive must be prepared for communication
with the module. Program the drive parameters to use Modbus fieldbus
The technical data and specifications are valid at the time of printing.
as drive control location according to the drive User’s Manual. The pre-
ABB reserves the right to subsequent alterations.
set configuration of the ABC-DEV module enables the use of maximum
ABC-DEV and Drive The topology of the ABC-DEV is shown in the figure below. ten ACS 140/160/400 drives connected to one ABC-DEV module.
Topology Select the node number of the drive in the range of 1 to 10 in following
Fieldbus link DeviceNet order (no blanks allowed) starting from 1. The ABC-DEV
communicates by default at a speed of 19200 bits/s with the drive with
parity ‘None’. Set the communication speed of the drive interface
accordingly. Set the drive communication fault time to at least 5 sec to
AnyBus-S Communicator avoid nuisance communication time out trippings of the drive. Note that
even though the ABC-DEV is used, it is also possible to use other
RS485 Modbus link subnet available control locations to control the drive, e.g. digital/analogue
inputs and the drive control panel.

Data Mapping The ABC-DEV has been pre-configured to support the following
functionality:
• send output data to the drive, maximum of 3 words:
ACS 140/160/400 with RS485 interface -Drv X CW = Control Word for drive X
-Drv X Ref1 = Reference value 1 for drive X
The ABC-DEV module is directly linked to the DeviceNet fieldbus
network. The standard Modbus protocol is used on the subnet for -Drv X Ref2 = Reference value 2 for drive X
communication between the ABC-DEV module and the drives. The • receive input data from the drive, maximum of 3 words:
physical transmission medium of the bus between module and drives is -Drv X SW = Status Word of drive X
a twisted pair cable according to the RS485 standard.
-Drv X Act1 = Actual value 1 of drive X
A maximum of 10 drives can be connected to one ABC-DEV. -Drv X Act2 = Actual value 2 of drive X
Information on the electrical connections can be found in the AnyBus
Refer to the drive related manuals for the meaning of its data words.
Communicator manual (wiring to the module) and the RS 232/485
manual (wiring to ACS140/160) or ACS 400 User’s Manual (wiring to Additionally, the AnyBus Communicator has its own Control Word
ACS 400 series). (ABC CW) and Status Word (ABC SW). Refer to the AnyBus
Communicator manual for the meaning of these words.
When connecting several drives to the ABC-DEV arrange the bus
cables as far away from the motor as possible. Avoid parallel runs and The data mapping is presented in the tables 1 and 2 below.
use screened cable only.
Table 1 Output area (PLC to drive)
The subnet should not be directly earthed at any point. All the devices
on the subnet should be well earthed using their corresponding 1+2 3+4 5+6 7+8 9+10 11+12 13+14 15+16
earthing terminals. ABC CW Drv1 CW Drv1 Ref1 Drv1 Ref2 Drv2 CW Drv2 Ref1 Drv2 Ref2 Drv3 CW

As always, the earthing wires should not form any closed loops, and all 17+18 19+20 21+22 23+24 25+26 27+28 29+30 31+32
the devices should be earthed to a common earth. Drv3 Ref1 Drv3 Ref2 Drv4 CW Drv4 Ref1 Drv4 Ref2 Drv5 CW Drv5 Ref1 Drv5 Ref2
The subnet must be terminated using 120 Ω resistors at both ends of 33+34 35+36 37+38 39+40 41+42 43+44 45+46 47+48
the network. Use a switch or a jumper according to the wire instructions Drv6 CW Drv6 Ref1 Drv6 Ref2 Drv7 CW Drv7 Ref1 Drv7 Ref2 Drv8 CW Drv8 Ref1
to connect or disconnect the termination resistors.
49+50 51+52 53+54 55+56 57+58 59+60 61+62
The termination should only be done on the first and last node on the
Drv8 Ref2 Drv9 CW Drv9 Ref1 Drv9 Ref2 Drv10 CW Drv10 Ref1 Drv10 Ref2
stations on the network. Do not select the termination for the
intermediate nodes.

2 ABC-DEV Installation Guide ABC-DEV Installation Guide 3

You might also like