F15 EMS Stage 1
F15 EMS Stage 1
F15 EMS Stage 1
Site Address (If The 3rd ring road El-Hadaeq Bridge El-Hadaeq Benghazi-Libya
any)
No. of Employees 172
E mail id [email protected]
Telephone/Fax +218(061)4764443
Scope The provision of drilling and petroleum services (off-shore and on-shore)
Technical Area
CHANGE DETAIL
ATTENDENCE SHEET:
SUMMARY OF AUDIT
AREA OF IMPROVEMNET
(Areas Of Improvement Which May Be Identified As Non Conformities During Stage 2 Audit)
F15 Issue 01
AQC MIDDLE EAST FZE Rev 00
ISO 14001:2015 (05.10.2017)
Stage 1 Audit Report
Please respond by using your own corrective action form and include the root cause analysis
with systemic corrective action. Failure to include root cause analysis with systemic corrective
action will result in your responses being rejected by Lead Auditor
Sign
AUDIT CHECKLIST
Has the discussion held with yes, discussion with Eng. Mansour Abdulaziz C
personnel of the Client company Hussein
for readiness for stage-2?
Are Process and support processes Infrastructure procedure code EHS –P-11 C
identified and determined ? and human resources procedure code ESH-
P-07 are established and implemented
Has the Client site specific yes, client maintain safe and secure C
conditions are evaluated? conditions in all sites
Has the company identified key Process analysis for all company processes C
performance, Process, in place and the company use SIPO tool for
Objectives, Impact and Aspect this and documented on Process Analysis
analysis and operation of
form (SIPOC) EHS- F0104.
Management System ?
Has the client having Yes, discussion with General manager and C
understanding with the ISO QHSE manager, give me good feedback on
14001:2015 Standard requirement? the company commitment and understanding
toward environment management system –
ISO 14001-2015, specially, them working in
Oil field and equipment trading.
Is client having Multisite then level Client have one site only located in Benghazi- C
of control is established. Libya .
Has client identified Legal and YES, major legal requirements as stated in C
Statutory Requirements applicable environment law , and the client comply with all
requirements
to Product and Organization?
Is Internal Audit planned and Yes, last internal audit cycle conducting at C
performed and effective? period 24-08-2021 to 28-08-2021
Is MRM planned and performed Yes, MRM reviewed and conducting at 15- C
and Effective? 09-2021, with sharing all key personnel
END OF REPORT