2 PD R8 Price-Escalation August-16-2023
2 PD R8 Price-Escalation August-16-2023
2 PD R8 Price-Escalation August-16-2023
BUREAU OF CONSTRUCTION
PROJECT
DOCUMENTATION
SEMINAR
PRICE ESCALATION
August 16, 2023 Presented by: JANINE C. DE PABLO
10:30 AM – 12:00 PM Engineer II, Price Escalation Review Section
Claims Review Division, Bureau of Construction
OUTLINE OF PRESENTATION
Updates
Procedures
SHORT QUIZ
Question 1
TRUE OR FALSE?
TRUE OR FALSE?
TRUE OR FALSE?
Updates
Procedures
Price Adjustment
Price Escalation
Price Adjustment
Updates
Procedures
PRICE ADJUSTMENT
➢ Adjustment of the original unit cost.
Item 200
–
1,000 200.00 / 25.00 /
Aggregate 225.00 225,000.00
cu.m. cu.m. cu.m.
Subbase
Course
Item 311 - 1000 2,000.00 / 100.00 /
2,100.00 2,100,000.00
PCCP sq.m. sq.m. sq.m.
DPWH
For PEECRC
GPPB NEDA Secretary /
Undersecretary
Deliberation
Implementing
DPWH
Office
K K K Adjusted
Threshold Average Factor Unit Costs
LEGAL PARAMETERS
K K
Threshold Average
LEGAL PARAMETERS
Inflation Pestilence,
Thunderstorms
Locusts
Flooding in lowly
Unusual floods
areas Deflation
Vehicular Earthquake
accidents
LEGAL PARAMETERS
A method used to
prove the existence of
2 STANDARD extraordinary
DEVIATION circumstances based
on the legal
parameters.
LEGAL PARAMETERS
SAMPLE PROJECT
Project: 21D00090 Construction/Repair/Rehabilitation/ Improvement Of Various
Infrastructure Including Local Projects Road Widening of Magallanes Drive (By-
Pass Road to Decongest Traffic) Brgy. Silang Crossing West-Brgy. Maharlika West,
Tagaytay City, Cavite Province
Contract Amount: ₱ 168,659,902.81
Date of Bidding: May 26, 2021
Contract Effectivity: August 31, 2021
Contract Expiry: June 27, 2022
K16average = 0.15 + 0.03 (Laverage) + 0.41 (Caverage) + 0.19 (Baverage) + 0.09 (Daverage) + 0.04 (Faverage) + 0.09 (Eaverage)
K16average = 121.49
Condition:
IF Kaverage > Kthreshold, Price Escalation may be GRANTED
IF Kaverage < Kthreshold, Price Escalation is NOT GRANTED
Since
Kaverage > Kthreshold
121.49 > 120.22 ,
TECHNICAL PARAMETERS
K Adjusted
Factor Unit Costs
TECHNICAL PARAMETERS: K Factor
K16 = 0.15 + 0.03 (Li/Lo) + 0.41 (Ci/Co) + 0.19 (Bi/Bo) + 0.09 (Di/Do) + 0.04 (Fi/Fo) + 0.09 (Ei/Eo)
K16September = 1.0053
K16October = 1.0094
K16November = 1.0189
K16December = 1.0163
K16January = 1.0231
K16February = 1.0261
The Price Escalation shall be based on the applicable price index for the period in which it should have been accomplished.
Item No. Description Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Bidding Date Structural Concrete
VO Approved 405(1)a3 (20.68 Mpa, Class
Date Billed A, 28 days)
The based cost indices shall be based on the applicable price index prevailing on the date the variation order was approved
Checklist of Requirements (DO 60, s. 2017)
Approved Revised PDM or PERT CPM, Bar Chart with S-Curve, if any