QSP MS El-004.00
QSP MS El-004.00
QSP MS El-004.00
_________________________________________________
0 Revision
Issued for Implementation No.: 00
November Shafat Ullah Khan Rami Wadi
2020
Total No. of pages: 5
Table of Contents
QA/QC Engineer Quality Manager
Section # Section Content Page
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
i Title Page 1
ii Table of Content 2
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
1 Scope & Purpose 2020 3
2 Reference 3
3 Responsibilities 4
QA/QC Engineer Quality Manager
4 HSE Requirement 4
5 Equipment to be Used 5
8 Work Procedure 6
The purpose of this document is to outline the sequences and methods of works intended to
be used for Installation
0 of NER.
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
The Contractor reserves the right to adapt the methods of work as contained in this
document, modification to this document if required from time to time according to specific
site conditions
QA/QC Engineer Quality Manager
2. References.
06 52-TMSS-01 ANSI/NFPA70 Test on Indoor & Outdoor Post Insulators of Ceramic Material or
Glass for Systems with Nominal Voltages greater than 1000 V
07 52-TMSS-01 ANSI/IEEE32 Requirements, Terminology and Test Procedure for Neutral
Grounding Devices
08 52-TMSS-01IEC 62271-200 Rated Voltage up 33kV
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
09 52-TMSS-01 NAFA70 National Electrical Code
2020
3. Responsibilities.
QA/QC Engineer Quality Manager
Project Manager / Construction manager
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
Has the responsibility to ensuring that all the activity is done without endangering health and
safety in accordance with the local legislation, client’s requirements and stipulations laid
down in the HSE management system document. Ensure that all under groundwork related
accidents are reported,
0 investigated and that corrective
Issued for Implementation and preventive
November measures
Shafat Ullah Khan are taken;
Rami Wadi
the accident investigation team has the power to stop2020 any work or operation under his
authority on health, safety or environmental grounds until effective measures have been
taken.
To ensure that all personnel are adequately trained for the relevant task; that they are
using the correct equipment and personal protective equipment; that all relevant hazards
have been identified;
0 and that for
Issued theImplementation
respective permits to work formalities
November have
Shafat Ullah been correctly
Khan Rami Wadi
addressed, where required. 2020
Responsible for providing the required PPE to his crew for the job as mentioned herein
this procedure.
QA/QC Engineer Quality Manager
He shall be responsible for ensuring that all involved personnel are attended company HSE
induction and following HSE regulations, safe work practices, safe working environment and
HIRA control measures.
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
He shall responsible to conduct work site inspection to ensure that the activities are
performing as per company procedures, standards and regulations. He shall maintain all
relevant valid documents related to the activity and involved equipment.
QA/QC Engineer Quality Manager
4. HSE Requirements.
Permit to Work
0 (PTW) Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
Permit to work (PTW) system shall be implemented to control the activities in
safe manner for the protection of all personnel, assets and environment.
QA/QC Engineer Quality Manager
Describe the nature of work, involved tools and equipment, work location details, start
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
date and time in the work permit. Person in charge of work site & Job performers shall be
fully aware of activities, regulations and the Permits shall be kept available at all times nearby
the work area.
Personal Protective
0 Equipment
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
The contractor shall provide personal protective equipment as required for different
operations. All PPEs to be used by construction personnel shall be in good quality and
condition.
QA/QC Engineer Quality Manager
Prior to start, the task Engineer along with the Foreman and the Safety officer shall conduct
toolbox. They have to present in detail the task, potential risk, safe activity implementation
and the preventive
0 control measures,
Issued PPE requirements,
for Implementation safe work
November Shafatprocedures,
Ullah Khan HSE Rami Wadi
regulations and conditions to prevent incident. All concerned
2020 workers shall attend toolbox talk
and the related records shall be maintained.
5. Equipment to be used
Megger for Resistance
Omicron
0 Kit
Issued for Implementation November Shafat Ullah Khan Rami Wadi
TAN DELTA Tester 2020
Measuring Meter
Hand tools for Electrician QA/QC Engineer Quality Manager
7. General
0 Aspect
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
Prior to start installation activities of the NER, the following shall be checked:
Installation materials checked By QC Officer, submitting the MIR to LINXON
QA/QC Engineer Quality Manager
for the materials inspection at the site.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
Check the availability of IFC drawings for the installation and inspection.
Check the positions and dimensions of the structures and civil works and
0 the surrounding equipment, pipeNovember
Issued for Implementation works, etc.Shafat
so asUllah
to modify
Khan the erection
Rami Wadi
drawings and documents accordingly. 2020
Getting work permit from LINXON on time before starting the work activities.
QA/QC Engineer Quality Manager
Follow the activities and the inspection according the approved ITP.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
Check that the working area is clean and free from any safety hazard.
Uncrate the resistor using care not to damage the enclosure finish and/or
external bushings. Next, remove the bolts which fasten the resistor
enclosure to the skid.
It is recommended that a hoisting device be used to lift the unit with the aid
0 of the Issued
eyebolts on the top of November
for Implementation the enclosure. When
Shafat Ullah using
Khan the eyebolts
Rami Wadi
provided with power-ohm resistor Inc.
2020
Neutral grounding resistor located at the top of the enclosure, lifting must
incorporate use of a spreading device to ensure a safe lift. Not utilizing a
spreader while lifting the unit causes the eyebolts to be pulled at various
QA/QC Engineer Quality Manager
angles resulting in roof damage.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
If a hoisting device is not available, a forklift can be used, provided the forks
rest against the top of the mounting channels located on the bottom of the
enclosure. Avoid resting the forks against the screened center.
Power-ohm Neutral Earth Resistor (NER) can be mounted on a concrete
0 pad, support stand
Issued for or directly on top
Implementation of the transformer
November Shafat Ullah Khan Rami Wadi
Always mount the unit in the upright2020 position.
The unit should be bolted to the mounting surface using the 5/8” dia. Holes
provided at each corner of the mounting channels. Expansion type anchors
are recommended for concrete pad mounting.
QA/QC Engineer Quality Manager
If the enclosure has as elevating stand, secure the stand to its mounting
surface before mounting the enclosure. Never lift the enclosures with the
elevating stand attached.
The factory supplied drawing identifies the neutral and ground connection.
0 In all Issued
cases,forthe neutral terminal
Implementation is tagged for
November easy
Shafat identification
Ullah Khan andRami
the Wadi
proper connection is shown schematically
2020 on the drawing.
Check all electrical connections to ensure tightness.
After the resistor has been securely mounted, remove the front cover
Do not exceed 20 IN-LBS when tighteningQA/QC the ¼-20 cover hardware,
Engineer Quality Manager
(exceeding this torque will damage the threaded inserts)
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________
After removing the cover, remove all packing material and banding, if any,
used to support the insulators and resistor banks during shipments.
Failure to remove packing material from the inside of the enclosure may
result in fire hazard and/or resistor failure.
0 If any damaged parts are found, contact
Issued for Implementation Novemberthe factory immediately,
Shafat Ullah Khan Energizing
Rami Wadi
the unit may damage the resistor and create a shock hazard to personnel.
2020
Finally, check all electrical connections to ensure tightness.
Check all dimension, distance and integrity of terminals in relation to final
drawings. Quality Manager
QA/QC Engineer