QSP MS El-004.00

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 28

METHOD OF STATEMENTS – ELECTRICAL WORKS

_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

Project Title: EXPANSION OF SAFANIYAH BSP 380/230kV

Contract No.: 400018901

0 Revision
Issued for Implementation No.: 00
November Shafat Ullah Khan Rami Wadi
2020
Total No. of pages: 5

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


NEUTRAL EARTH RESISTOR (NER) 2020

INSTALLATION Quality Manager


QA/QC Engineer

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


2020

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

Rami Wadi Rami Wadi Basheer Alzrigat


0 First Issue 27-Jul-2023
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
Rev. Description Date Prepared Checked Approved

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


2020

Table of Contents
QA/QC Engineer Quality Manager
Section # Section Content Page
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

i Title Page 1

ii Table of Content 2
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
1 Scope & Purpose 2020 3

2 Reference 3

3 Responsibilities 4
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

4 HSE Requirement 4

5 Equipment to be Used 5

6 Safe Work Practice 6


0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
7 General Aspect 2020
6

8 Work Procedure 6

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


2020

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


2020

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

1. Scope & Purpose.

The purpose of this document is to outline the sequences and methods of works intended to
be used for Installation
0 of NER.
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
The Contractor reserves the right to adapt the methods of work as contained in this
document, modification to this document if required from time to time according to specific
site conditions
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

2. References.

SN Reference Document Document Title


01 52-TMSS-01
0 IEC 60071-1 Insulation Coordination
Issued for Implementation November Part-1: Definition,
Shafat UllahPrinciples
Khan and Rules
Rami Wadi
02 52-TMSS-01 IEC 60071-2 Insulation Coordination
2020 Part-2: Application Guide
03 52-TMSS-01 IEC 60529 Degrees of Protection Provided by Enclosures (IP Code)
04 52-TMSS-01 IEC 60137 Insulated Bushings for Alternating Voltages above 1000 Volts
05 52-TMSS-01 IEC 60273 Characteristics of Indoor & Outdoor Post Insulators for Systems
QA/QC Engineer Quality Manager
with Nominal Voltages greater than 1000 Volts
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

06 52-TMSS-01 ANSI/NFPA70 Test on Indoor & Outdoor Post Insulators of Ceramic Material or
Glass for Systems with Nominal Voltages greater than 1000 V
07 52-TMSS-01 ANSI/IEEE32 Requirements, Terminology and Test Procedure for Neutral
Grounding Devices
08 52-TMSS-01IEC 62271-200 Rated Voltage up 33kV
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
09 52-TMSS-01 NAFA70 National Electrical Code
2020

3. Responsibilities.
QA/QC Engineer Quality Manager
Project Manager / Construction manager
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

Has the responsibility to ensuring that all the activity is done without endangering health and
safety in accordance with the local legislation, client’s requirements and stipulations laid
down in the HSE management system document. Ensure that all under groundwork related
accidents are reported,
0 investigated and that corrective
Issued for Implementation and preventive
November measures
Shafat Ullah Khan are taken;
Rami Wadi
the accident investigation team has the power to stop2020 any work or operation under his
authority on health, safety or environmental grounds until effective measures have been
taken.

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

Site Engineer / Supervisor

To ensure that all personnel are adequately trained for the relevant task; that they are
using the correct equipment and personal protective equipment; that all relevant hazards
have been identified;
0 and that for
Issued theImplementation
respective permits to work formalities
November have
Shafat Ullah been correctly
Khan Rami Wadi
addressed, where required. 2020

Responsible for providing the required PPE to his crew for the job as mentioned herein
this procedure.
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

HSE Supervisor / HSE Officer

He shall be responsible for ensuring that all involved personnel are attended company HSE
induction and following HSE regulations, safe work practices, safe working environment and
HIRA control measures.
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
He shall responsible to conduct work site inspection to ensure that the activities are
performing as per company procedures, standards and regulations. He shall maintain all
relevant valid documents related to the activity and involved equipment.
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

He shall lead HSE communication with workforce to encourage reporting of incidents


including near-miss incident, hazard identification, risk management and emergency
preparedness.
0 Issued for Implementation November Shafat Ullah Khan Rami Wadi
He shall investigate and report all reportable accidents/incidents
2020 to company authority and
contractor management with recommendation to improve control measures for prevention of
the recurrence. He shall be the authority to stop the site activities due to an existence of
unsafe condition. He shall ensure that all personnel are attended HSE induction prior to the
site assignment and strictly following HSE regulations. QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

4. HSE Requirements.
Permit to Work
0 (PTW) Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
Permit to work (PTW) system shall be implemented to control the activities in
safe manner for the protection of all personnel, assets and environment.
QA/QC Engineer Quality Manager
Describe the nature of work, involved tools and equipment, work location details, start
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

date and time in the work permit. Person in charge of work site & Job performers shall be
fully aware of activities, regulations and the Permits shall be kept available at all times nearby
the work area.

Personal Protective
0 Equipment
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020
The contractor shall provide personal protective equipment as required for different
operations. All PPEs to be used by construction personnel shall be in good quality and
condition.
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

Tool Box Talk (TBT)

Prior to start, the task Engineer along with the Foreman and the Safety officer shall conduct
toolbox. They have to present in detail the task, potential risk, safe activity implementation
and the preventive
0 control measures,
Issued PPE requirements,
for Implementation safe work
November Shafatprocedures,
Ullah Khan HSE Rami Wadi
regulations and conditions to prevent incident. All concerned
2020 workers shall attend toolbox talk
and the related records shall be maintained.

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

5. Equipment to be used
 Megger for Resistance
 Omicron
0 Kit
Issued for Implementation November Shafat Ullah Khan Rami Wadi
 TAN DELTA Tester 2020

 Measuring Meter
 Hand tools for Electrician QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 Hand tools for Mechanical


 Exo-Thermic Welding Tool Kit
 Step-up Transformer
0
 Megger forIssued for Implementation
Insulation Resistance November Shafat Ullah Khan Rami Wadi
2020
 Barrier Tapes & Warning Signs

QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

6. Safe Work practices


According Risk Assessment Health & Safety Plan

7. General
0 Aspect
Issued for Implementation November Shafat Ullah Khan Rami Wadi
2020

Prior to start installation activities of the NER, the following shall be checked:
 Installation materials checked By QC Officer, submitting the MIR to LINXON
QA/QC Engineer Quality Manager
for the materials inspection at the site.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 Check the availability of IFC drawings for the installation and inspection.

 Check the positions and dimensions of the structures and civil works and
0 the surrounding equipment, pipeNovember
Issued for Implementation works, etc.Shafat
so asUllah
to modify
Khan the erection
Rami Wadi
drawings and documents accordingly. 2020

 Getting work permit from LINXON on time before starting the work activities.
QA/QC Engineer Quality Manager
 Follow the activities and the inspection according the approved ITP.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 Check that the working area is clean and free from any safety hazard.

0 Issued for Implementation November Shafat Ullah Khan Rami Wadi


2020
8. Work Procedure
8.1 Installation of NER:
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 Uncrate the resistor using care not to damage the enclosure finish and/or
external bushings. Next, remove the bolts which fasten the resistor
enclosure to the skid.
 It is recommended that a hoisting device be used to lift the unit with the aid
0 of the Issued
eyebolts on the top of November
for Implementation the enclosure. When
Shafat Ullah using
Khan the eyebolts
Rami Wadi
provided with power-ohm resistor Inc.
2020
 Neutral grounding resistor located at the top of the enclosure, lifting must
incorporate use of a spreading device to ensure a safe lift. Not utilizing a
spreader while lifting the unit causes the eyebolts to be pulled at various
QA/QC Engineer Quality Manager
angles resulting in roof damage.
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 If a hoisting device is not available, a forklift can be used, provided the forks
rest against the top of the mounting channels located on the bottom of the
enclosure. Avoid resting the forks against the screened center.
 Power-ohm Neutral Earth Resistor (NER) can be mounted on a concrete
0 pad, support stand
Issued for or directly on top
Implementation of the transformer
November Shafat Ullah Khan Rami Wadi
 Always mount the unit in the upright2020 position.
 The unit should be bolted to the mounting surface using the 5/8” dia. Holes
provided at each corner of the mounting channels. Expansion type anchors
are recommended for concrete pad mounting.
QA/QC Engineer Quality Manager

(KADI Contracting) (KADI Contracting)


METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 If the enclosure has as elevating stand, secure the stand to its mounting
surface before mounting the enclosure. Never lift the enclosures with the
elevating stand attached.
 The factory supplied drawing identifies the neutral and ground connection.
0 In all Issued
cases,forthe neutral terminal
Implementation is tagged for
November easy
Shafat identification
Ullah Khan andRami
the Wadi
proper connection is shown schematically
2020 on the drawing.
 Check all electrical connections to ensure tightness.
 After the resistor has been securely mounted, remove the front cover
 Do not exceed 20 IN-LBS when tighteningQA/QC the ¼-20 cover hardware,
Engineer Quality Manager
(exceeding this torque will damage the threaded inserts)
(KADI Contracting) (KADI Contracting)
METHOD OF STATEMENTS – ELECTRICAL WORKS
_________________________________________________

METHOD OF STATEMENTS – MECHANICAL WORKS


__________________________________________________

INSTALLATION OF FIRE ALARM SYSTEMS

Revision Description Date Prepared by Reviewed & Approved


by

 After removing the cover, remove all packing material and banding, if any,
used to support the insulators and resistor banks during shipments.
 Failure to remove packing material from the inside of the enclosure may
result in fire hazard and/or resistor failure.
0 If any damaged parts are found, contact
Issued for Implementation Novemberthe factory immediately,
Shafat Ullah Khan Energizing
Rami Wadi
the unit may damage the resistor and create a shock hazard to personnel.
2020
 Finally, check all electrical connections to ensure tightness.
 Check all dimension, distance and integrity of terminals in relation to final
drawings. Quality Manager
QA/QC Engineer

(KADI Contracting) (KADI Contracting)