GERMANISCHER LLOYD INDUSTRIAL SERVICES GMBH

Local Certificate No:


CERTIFICATE OF TEST AND THOROUGH EXAMINATION PP334170-23-101
OF MOBILE CRANE Date of Inspection:
30-November-2023
Name and Address of the Owner: Place of Inspection: Ref. Standard:
M/S GOLDEN EQUIPMENT Co. - KUWAIT kuwait BS 7121-2-1 of 2012
Maker & Date of Manufacture:
DNV NPS No.: N/A SANY , 2016
DNV Order No.: N/A
Reg. No.: Owner No.: Model No.: Serial No.:
29553 B-07 STC500 LFCNNF5P7F2001273

Crane Details:
DIESEL POWERED TRUCK MOUNTED CRANE , HYDRAULIC OPERATION, TELESCOPIC
BOOM
Maximum Capacity: Boom Length: 50 ton /3.0 m /11.5 m With Fully reeved, and out riggers fully extended.

Description of Test: Test Load


Boom Length Radius SWL
Applied
GL Inspector Attended To Carry Out Visual Inspection, (Metre) (Metre) (Tonne) (Tonne)
Witness The Performance test & Load Test of:- Mobile
Crane
27.25 16 6.25 5.0
Present Configuration:
18 ton/3.0 m/11.5 m with 4 falls and outriggers fully
extended.

43 22 3.25 2.6

Date of Next Proof Load


Date of Last Examination Date of Next Examination Date of Last Proof Load Test
Test

N/A 29 November 2024 N/A 29 November 2024

Authorized Name: Eng. Mohamed Fadel Surveyor’s Name: Eng. Abdulrahman


Gad
Surveyor’s Signature:
Authorized Signature:
LEGAL DISCLAIMER: THIS IS TO CERTIFY THAT the above competent surveyor tested and thoroughly examined the lifting equipment in the above-mentioned
place as per relevant International Standard. Unless otherwise stated in the applicable contract with the holder of this document, or following from mandatory
law, the liability of DNV AS, its parent companies and subsidiaries as well as their officers, directors and employees (“DNV”) arising from or in connection with
the services rendered for the purpose of the issuance of this document or reliance thereon, whether in contract or in tort (including negligence), shall be limited
to direct losses and under any circumstance be limited to the lesser of a sum equal to ten times the remuneration paid to Contractor under this Contract up to a
maximum of 300,000 USD.

Page 1 of 2Page 1 of 2Country Office - KUWAIT, Ahmed Al Jabar Street, Al Sarraf Tower, 3rd Floor 13069 Kuwait City - Kuwait - Tel. +96522251338
The present is based upon the standard international form of certificate approved by the International Labour Organisation for the test and examination of lifting
machinery and complies with LOLER 1998. This Report meets the minimum requirements for LEEA Technical Rules.

Form code: ISI-INSP-5-7-A1-KW Revision: 2021-03 www.dnv.com Page 1 of 2


Copyright © DNV 2021. All rights reserved.
GERMANISCHER LLOYD INDUSTRIAL SERVICES GMBH

Local Certificate No:


PP334170-23-101
Annex to Certificate of Test and Thorough Examination of Mobile Crane
NO. DESCRIPTION CONDITION REMARKS
1 Rated Capacity Indicator / Limiter Satisfactory
2 Radius Indicator Satisfactory
3 Angle Indicator Satisfactory
4 Main Boom Length Indicator Satisfactory
5 Boom Hoist Cut Out Satisfactory
6 Hoisting Limiter / Anti-Two Block Satisfactory
7 Overload Protection / Limiter Satisfactory
8 Duty Chart in Cab Satisfactory
9 Crane Controls, Markings and Gauges Satisfactory
10 Level Indicator Satisfactory
11 Boom Structure Satisfactory
12 Fly Jib Structure N/A
13 Sheaves, Rope Guides and Rollers Satisfactory
14 Main Hoist Winch and Brake Satisfactory
15 Auxiliary Hoist Winch and Brake Satisfactory
16 Main Hook Block Satisfactory
17 Auxiliary Hook Block Satisfactory
18 Wire Rope – Main Hoist Satisfactory
19 Wire Rope – Aux Hoist Satisfactory
20 Main Hoist Wire Rope Certificate & Installation Date N/A
21 Aux Hoist Wire Rope Certificate & Installation Date Satisfactory
22 Swing Machinery / Turntable Bearing Satisfactory
23 Power Unit / P.T.O. Satisfactory
24 Hydraulic System Satisfactory
25 Electrical System / Battery Satisfactory
26 Warning Lights, Horn & Reverse Alarm Satisfactory
27 Operator Cabin Structure, Windshield & Seat Belt Satisfactory
28 Carrier Condition Including Engine Satisfactory
29 Emergency Stop Push-Button Switch N/A
30 Air Intake Shut-Off Valve N/A
31 Spark Arrestor N/A
32 Counterweight Satisfactory
33 Outriggers Satisfactory
34 Tyres / Wheels Satisfactory
35 Fire Extinguisher N/A
36 Anemometer Satisfactory
37 Maintenance Records N/A
38 Record of Major Repairs / Alterations / Replacements N/A