Curriculum Vitae - Lalit Chandiramani: Career Objectives

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

CURRICULUM VITAE - LALIT CHANDIRAMANI

CAREER OBJECTIVES

Dedicated, Hard-working and Result oriented Project


Implementation Professional with over 14 years of
experience in project planning, execution & delivering of
engineering solutions for major Security Systems / Building
Automation and Networking/Fire Alarm Systems/Fire
Suppression System/ other ELV systems engineering
projects for a reputed companies in Qatar / India.

 Vast exposure in managing fast track engineering projects


related to Industrial, Commercial and Hotel Buildings for
reputed clients in Qatar / India.
ADDRESS  Excellent knowledge of Contract Conditions, Health and
Villa No. 25, Siraj Street Safety Regulations, Local Authorities Requirements for the
AL – Hilal, Doha - Qatar Projects.
 Ability to handle all site/project related work from initiating to
Telephone
closing phase. Managed all technical aspects of highly
+974-77226001
+974-66984024 complex engineering projects including installation, testing
and commissioning.
E-MAIL  Effective leadership skills include Decision making / Team
[email protected] building/Motivation required to analyze the Projects.
[email protected]  Expert Judgment/Analytical techniques effectively required
managing the Project.
DATE OF BIRTH  Exposure in Forecast Validation/Scope validations, Cost
November 11, 1981
control & Quality assurance.
NATIONALITY  Project scope and respective team Management to meet
Indian project goals with technical expertise skills.

LANGUAGES
English CORE COMPETENCIES
Hindi
Sindhi:
ORGANIZATIONAL: MEP services, centralized monitoring
IT SKILLS system for Lift, Escalator & Travelator machineries.
MS Office
IT Solutions NETWORKING: Designing & implementation customer network
infrastructure, Remote Access solution, highlight and document
TRAININGS all network risks of Projects.
PMP Training Course (40 Hrs)
TECHNICAL: Troubleshooting configuration issues in regards to
INTEREST networking congestion over router & switches, OLT and ONU
Project Management
networks.

Server Architecture, Intranet Infrastructure, Configuration


Management.

Project Leadership , Business Planning & Cost control.


WORK EXPERIENCE

Consolidated Gulf Company WLL, Doha – Qatar June 2012 – Present


Position: Assistant Manager – Projects
Business Unit: Security & Safety Solutions

Projects handled:

QATAR PETROLEUM – EPIC (GC12100900) for PAGA, CCTV, Talkback for various
onshore Gas Distribution Stations and Offshore Platform. (Current Assignment)
Project for CCTV and PAGA systems which has been diversified into 42 different GDS and
NGL gas distribution plants/sites located all over in Qatar. (Current Assignment)

Role - Construction Manager

HAMAD INTERNATIONAL AIRPORT – Design, Supply, Installation, Testing &


Commissioning of ELV Systems for NDIA (New Doha International Airport) Passenger
Terminal Complex Lounges.

Role – Construction Manager

Key Responsibilities

 Developed and implemented project execution strategy, ensure the implementation of


quality control standards and cost control on project for on time completion.
 Executed daily operations of monitoring the work executed by the engineering team/
subcontractors at site and prepared interim and completion project reports.
 Coordination with AHJ and client representatives for obtaining approval on Fire Alarm
System.
 Supervised monitored and reported Project progress throughout the project cycle to
ensure on time completion. Attended Project Progress Meetings and coordinated with
other departments.
 Managed Cash Flow Requirements for the Projects. Control expenditures within
limitations of project budget.
 Monitored, verified and enforced specification compliance of materials at various
stages of project. Managed and control Project Budget.
 Managed material and manpower requirements. Performed preparation of invoices,
variance and claims and client follow up.
 Coordinated with clients, consultants, project managers, local authorities and sub-
contractors.
 Establish and maintain effective Health and Safety system in place for the Projects
strictly adhering to standards and specifications. Assured the company procedures
and company policies are being complied with Corporate Business Conduct and Ethics
Policies at all times.
 Training and development of subordinate employees to improve project performance
and enhance individual career development.
 Directed installation, commissioning activities to enable segmented project handovers.
Controlled record documentation.
 Compiled Project O & M Manuals and provide the facility Manager with appropriate
training.
 Prepared method statements, ITP, material submittals and established implementation
on site.
 Prepares procedures for planned activities for all CCTV, PAGA systems.
 Implement project execution strategy, ensuring the accomplishment of cost control on
project for on time completion.
 Weekly graced my presence for Project Progress Meetings and coordinated with
client.
 Managed Cash Flow Requirements for the Projects. Control expenditures within
limitations of project budget.
 Managed material and manpower requirements according to necessitate for project.
 Coordinated with End users, clients, consultants, project managers, sub-contractors &
vendors.
 Training and development of assistant employees to improve project performance and
enhance individual career development growth.
 Installation, testing & commissioning activities to enable project handovers.
 Prepared Method statements, ITP, material submittals to initiate the execution
activities at site.
 Planning for execution of CCTV and PAGA system for the QP project
 Control scope, cost and schedule.
 Follow the change management plan and the process.
 Identification of risks and assumptions for the pre-defined work activities.
 Evaluate the effectiveness of implemented risk response plan and risk process.
 Prioritizing project related issues to ensure consistency of strategies and proper
alignment with corporate long term objectives.
 Installation of Airport communication systems and airport surveillance radar (ASR).

THYSSEN KRUPP ELEVATORS INDIA PVT.LIMITED July 2009 –June 2012


Position: Senior Project Engineer
Business Unit: Project Division

Projects handled:

DELHI INTERNATIONAL AIRPORT LTD - DIAL –DELHI INDIA


Headed the BMS execution team (Building Management System) at DIAL project for T-3
Terminal. Responsible for design approval, managing material procurement, execution &
Installation, testing & commissioning of BMS for VHT system.

Key Responsibility

 Preparation of Design detail documents for VHT system.


 Installation of EMS, EsMS, TMS and Seismic devices for the VHT units on the CAN
BUS communication.
 Installation, testing and configuration of servers & workstations.
 Integration of the system with the other sub-systems like FDP (Fire Detection &
Protection), CCTV, IT networking etc.
 Integration of CMS system with BMS system with the help of OPC protocol.
 Gather and collate network requirements by working with clients and colleagues.
 Design secure and scalable networks.
 Configuring inter-vlan routing on Layer-3 switches
 Liaise with support teams, working together to resolve customer issues.
 Work with OS and application teams to ensure client service success.
 Work as part of a team with excellent communication skills.
 Work with clients during all stages of projects.
 Troubleshooting and solving networking issues - TCP/IP, DNS, DHCP, Layer 2/3
network devices.

OPC is a software interface standard that allows Windows program to communicate with
industrial hardware devices.

OPC is implemented in server/client pairs. The OPC server is a software program that
converts the hardware communication protocol used by a PLC into the OPC protocol. The
OPC client software is any program that needs to connect to the hardware, such as an HMI.
The OPC client uses the OPC server to get data from or send commands to the hardware.

LARSEN & TOUBRO LIMITED – ECC DIVISION LIMITED June 2008 –Feb 2009
Position: Senior Engineer
Business Unit: Project Division

Projects handled:

DELHI INTERNATIONAL AIRPORT LTD - DIAL – DELHI, INDIA

Key Responsibility

 Integration of all the sub-contractor packages like VHT, FDP & HVAC with the BMS
(Building Management System).
 Hydrant and Sprinkler systems (Upright, Pendent, Sidewall, Concealed, Recessed,
Water Curtain sprinklers)
 MV(Medium Velocity) spray system & Fire Suppression System
 Analog Addressable Fire Alarm system (Smoke Detector, Heat Detector, Mimic panel,
NRP panel, FACP)
 VESDA System (Very Early Smoke Detection Apparatus)
 Clean Agent Gas Suppression System & PUMP HOUSE system
 Portable Fire Extinguisher System ( ABC Dry Chemical Type, CO2, Wet Chemical
Stored pressure Type, Clean Agent Type etc)
 Coordinate with the sub-contractor to ensure that the project will complete within the
scheduled time frame.
 To coordinate with sub-contractor & client to achieve the daily, weekly progress
targets.
TURBO CONSULTANCY SERVICES PVT. LTD DELHI June 2005 –May 2008
Position: Project Engineer
Business Unit: Project Division

Projects handled:

DELHI DOMESTIC AIRPORT- T1 Terminal – DELHI, INDIA

Key Responsibility

 Installation of the CCTV systems based on Fiber Optic Cables & Layer Three
Switches.
 Configuring and implementing Remote Access Solution: IPSec VPN, EasyVPN, SSL
VPN, Citrix Access Gateway, Citrix Secure Gateway
 Configuring VLANs, VTP, Ether-channels
 Configuring routing using OSPF and policy routing using route maps
 Installation supervision of various surveillance cameras & switch configuration.
 Vendor interfacing for testing & commissioning of fiber optic cables, switches and other
components
 Order requisition and follow ups for the material deliverables.
 Material management at site.
 Switches and CCTV cameras commissioning, which includes activities such as
configuration of the switches as per client specs and requirement, allocation and
definition of bandwidth for various ports and connectivity of the CCTV camera.

SECURICO ELECTRONIC INDIA (P) LTD, FARIDABAD June 2004 –May 2005
Position: Project Engineer
Business Unit: Customer Handling & Project Division

Projects handled:

ATS Infrastructure Ltd. for Electronic Surveillance and Access Control System for 750
Apartments Project at Noida
Neesu Constructions Pvt. Ltd. for Electronic Surveillance and Intruder Alarm System for 56
Apartments Project at Dehradoon.
Samiah International Builders Pvt. Ltd. for Electronic Surveillance System for 356
Apartments Project at Greater Noida.
Pearls Infrastructure Projects Ltd. for Electronic Surveillance, Multi Apartment Video Door
Phone System, Access Control System, Intruder Alarm System and Boom Barriers for 196
Apartments Project at Noida.
Key Responsibility

 Provide Training to the Dealers, Project Handling, Installation of HIK VISION DVR
Cards for both Software & Hardware, Access Control systems, Intruder Alarms
Systems.

ACADEMIC QUALIFICATIONS

 MBA from IGNOU University. (YEAR 2011)


 B.TECH in Electronics and Communication from Galgotia’s College of
Engineering and Technology affiliated to U.P Technical University Lucknow.
(YEAR 2004)
 Diploma in Electronics and Communication from Marathwada Institute of
Technology (MIT), Board of Technical Education, New Delhi. (YEAR 2001)

AVAILABILITY
Availability to join: (Minimum 2 months)

REFERENCES
Available upon request

You might also like