0% found this document useful (0 votes)
49 views2 pages

Problem Solving Reporting Format

ProblemSolvingReportingFormat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views2 pages

Problem Solving Reporting Format

ProblemSolvingReportingFormat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EFFECTIVE PROBLEM SOLVING

Summary Worksheet
Date Initiated: Concern/Issue #:
Problem Owner Information Product Information Problem Initiator Information / Customer
Company Name: Part Number: Company Name:
Co. Location/Identifier: Co. Location/Identifier:
Team Lead Name: Part Description: Initiator Name:
Team Lead Title: Initiator Title:
Phone/email: Program Name: Phone:
Executive Champion Name/Title: Email:
Sketch or Photo (Below)
Problem Solving Team - Name/Role *Must Identify Problem owner

Problem Identification
Customer effect/Customer Complaint:

Customer Requirement:

Deviation from Customer Requirement:

Where/When is the problem occurring?

Frequency of the problem? Problem Solving Goal Statement & Target Timing:

Describe the measurement method to evaluate problem (include capability):

Containment
List all locations and quantities of suspect product. Location Contact Potential Qty Actual Qty Containment Details
1) Containment Start Date:
2)
3) Containment Method:
4)
5) Nonconformance Rate:
6) Projected:
Totals ==> 0 0 Actual:
Failure Mode Analysis
Product feature(s) not in compliance: Failure mode resulting in product nonconformance:

Product Specification:

Deviation from Specification: Containment Verified? Yes No

Root Cause Analysis


Failure Mode:
Man Machine Measurement

Why did the Why? Why? Why? Why? Why?


problem
escape
Problem

Why? Why? Why? Why? Why?


Why did the
problem occur

Why? Why? Why? Why? Why?


Why a systemic
issue Method Material Environment

3 x 5 Why Analysis Results


Failure Mode Cause:

Systemic Root Cause - What in


Escape Root Cause - Why was ERC SRC
the planning process failed to
NC product shipped? Confirmed? Y Confirmed? Y
predict this problem?

Key Findings - Findings that


Occurrence Root Cause - ORC
could drive improvement in
Why was NC product made? Confirmed? Y
higher-level processes?

AIAG CQI-20v2, Issued 8/2018


EFFECTIVE PROBLEM SOLVING
Summary Worksheet
Date Initiated: Concern/Issue #:
Corrective Actions (CA)
Escape Corrective Actions: Responsible Due Date Status
1)

2)

3)

Occurrence Corrective Actions:


1)

2)

3)

Systemic Corrective Actions:


1)

2)

3)

Key Findings Actions:


1)

2)

3)

Status Codes Implement


Defined: 0 Identify Action 0.25 Confirm Action 0.5 Action 0.75 Closed 1
Verify Effectiveness & Implement Preventive Actions (PA)
Corrective Actions Ongoing Performance Enter Number Resolved* Not Resolved**
Escape Verification: Measurements over past days have shown problem to be:
Occurrence Verification: Measurements over past days have shown problem to be:
Systemic Verification: Measurements over past days have shown problem to be:
Resolved* Not Resolved**
Further EPS Activity Required:
Replicate ALL actions for similar
products & processes. Date Unsuccessful CA EPS Re-Start Phase
Complete for each corrective action

Containment Removed?
Yes No Date:
Replicate Corrective Actions across processes, parts and locations as Preventive Action Responsible Date

Capture Lessons Learned


Close Problem
Approve Closure
Name Role Company (Y or N)? Date

AIAG CQI-20v2, Issued 8/2018

You might also like