University of Gondar: CART, Department of Agricultural Economics, Natural Resource &
University of Gondar: CART, Department of Agricultural Economics, Natural Resource &
Part 1: Write true if the statement is correct or false if the statement is wrong (1 pt
each) Tu Watershed boundary is defined by all points that will shed water to the
outlet.
2:1 Watershed approach is a means to restore impaired water bodies, because it
address the problems in a holistic manner.
3.1215 Water harvesting can be defined as the collection of runoff for
productive use. F 4& Protecting the core zone from invasion by exotic plant
and animal species is the biological benefit of buffer zone.
5. TU One of the main purposes of national level watershed management planning
i identifying nature of watersheds such as agricultural and forest watersheds.
6.1
Recognition of upstream-downstream linkage in watershed management is a very
crucial issue to achieve the sustainable resource management
Part II: Choose the best answer from the given alternatives and write the
letter of your choice on the space provided (2 points each)
7. Which of the following is not true about watershed management concept?
A) Hydrologically defined
B) Geographically focused
C) Includes all stressors D) None
8. A Watershed management plan identifies one of the following except
A) who, when, and how for implementation and evaluation activities
B) Operation & Maintenance requirements
C) Disregard the involvement of stockholders
D) None
9 D The principles of mechanical measures to restore and protect water resource is:
Aythicrease time of concentration of runoff water
B) Decrease runoff volume and velocity
C) Safe disposal of excess water
D) All
10. D. The major purpose of water harvesting is
A) To secure water resources in dry areas
B) To provide water for irrigation, domestic water and water for livestock
C) To replenish ground water D) all
11.D One of the following is the social benefit of buffer zone
A)Resolving conflicts
Improving the quality of environment
tional land rights and cultures Dyall
11 Which of the following is the role of partnership in votershed momingsmon
A) Leadership role
1) Technical role
Education
12. The practices of coccal code of writes To
following except
A
Increase infiltration to the soil profile
BY
Decrease the effect of land dogs on Auto veiseity
3
DY
13
Decrease the time of concentration so as as per volume and every None
Which of the following price is used as restored prewin the Watershed?
A
Micro Sains
154
AW
13)
Dean
14
The purpose of water using the flowing excep
A)
Flood control
Some o
B)
Envigation
15 93me of the following nor the cotton benefic
Ay
B
Income from courses
Resolving conflict
16 Which of the following is the characteristic of a m
As
Deep soil profile.
8)
Pivate owned
Ain which of the following fotutionstop die o
management oppose
Rone
of y
Ay Protected apps Poted Ave and softer de
Part V: Essay
1. Disous why party as required in watershed management (3pts)
as Penner shit is the essered way to severus & impasse. And wars hind monkment
plan is
3
-move (reative 2 actor for to Rafels Maun
foCUT GRUP
- Clear 4?? severe day
are basist Education
2. Discuss at least three water protection and restoration mechanisms in a
watershed (3
-teraces = Mellons & waser Suase presels is earn enbookment of the load
Dam is the meluase of leases proselt and we
gwaser
to hotels & to contol water to the for to drick of water
444
BasinPart VI: Work out (show all the necessary steps)
2000000
57600
24. A small catchment of area 200ha received a rainfall of 10.5cm in 90minutes
due to the storage at the outlet of the catchment; the stream draining the catchment
was dry before the storm and experienced a runoff lasting for 8 hours with an
average discharge value 2.0 m/sec. The stream was again dry after the runoff
event.
Assume there was no contribution by ground water storage to the runoff to the
stream.
a. What is the amount of water which was not available to runoff due to the
combined effect of infiltration, evaporation and transpiration? (3pts)
b. What is the ratio of runoff to precipitation? (2pts)
200 ho x1A X 10.5cm - 710000,
200
Run Off = 8ux 60m x 60 x 20m3/500 = 57600 m2/SEC 210,000-57600 = 152400
= 57600
210.000 0.274
37. your company is considering two projects,PA &PB each of which requires an
initial outlay of 50,000,000br,the expected cash inflows from the project are:(3 pts)
Year
PA
1
11,000,000
2
3
234
19,000,000
31,000,000/
37,000,000
FC
38,000,000
22,000,000
18,000,000
10,000,000
What is the payback period for each of the project?
Pay book penat for lett A 30
pay back pewed for project B = 2year
Or
PbP = Envart
Cashflor
80,000,000
11,000,000+3800 49000000
2102
* pay back period for project A = 3 years, ble 11+ 19 +31 * pay back period for
project 8 = 2 years
6/238722
* $1,000,000
36
22
7
www.ll the best!!!!
Scanned by CamScanner
60,000,000 n2500-20000
3