Preparation of Mining Plan

Uploaded by

bibek.c
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

Format for prepration of Mining Plan/Modified Mining Plan/Review of Mining Plan

Index
PART A: CHAPTER 1 GENERAL INFORMATION
CHAPTER 2 GEOLOGY & EXPLORATION
CHAPTER 3 MINERAL PROCESSING
CHAPTER 4 MINING OPERATIONS
CHAPTER 5 SUISTAINABLE MINING
CHAPTER 6 PROGRESSIVE MINE CLOUSER PLAN
CHAPTER 7 FINANCIAL ASSURANCE
CHAPTER 8 REVIEW OF PREVIOUS PROPOSALS / IMPACT ASSESSMENT

PART B: ANNEXXURES

PART C: PLANS & SECTIONS


Chapter 1: GENERAL INFORMATION Next

1.1 : Lease Details


Registration Number:
Lease Code:
Mine Code:
Name of Lessee:
Type of Lessee :
Name of Mining Lease:
State: Jharkhand
District:
Tehsil/ Taluk/ Mandal:
Village:
Lease Area (Ha):
Forest Area (Ha):
Name of Minerals:
Name of associated minerals:
Five Year Block (Financial Year) TO
Type of working: Underground
Nature of Use:
Category of Mine:

1.1.1: Initial/subsequent Lease grant details


Grant From To

Add Row

1.1.2: Mining Plan Submission Criteria Details


Type of Document (Under Rule 16 of MCR 2016)
LOI Number:
Date:

1.2: Land Ownership Details


S. No. Village Taluka Area (Ha) Khasra No Type of Land Nature of Land
1.3: EXISTING LEASE
Date of Execution

1.3.1: Approval of earlier Mining Plan & Its Subsequent Review in Chronological Order
Period

Sl. No. Letter Number Date From To Type Of Approved Document

Add Row

1.3.2: Partial Surrenderd Area During Stages of Operations in Chronological Order


Final Retained Area over which
current Mining Plan is
Sl. No. Letter Number Date Supplementary Surrender Letter Supplementary Lease Deed Prepared ( ha)

Add Row

1.3.3: Transfer of Lease Area Subsequent to Grant

Sl. No. Letter Number Date Supplementary Surrender Letter Supplementary Lease Deed Name of Transferor

Add Row

1.3.4: Statutory Compliances


1.3.4.1: Environment Clearance
Applicable Yes
Letter No No
Date
Validity
Quantity Approved

1.3.4.2: SPCB Approvals


Letter No
Date
Validity
Quantity Approved

1.3.4.3: Forest Clearance


Applicable
Letter No
Date
Validity
Area (Ha)
1.3.4.4: Land Acquisition Details
Total Area acquired/purchased so far
Total Amount Paid (INR) Implemented
Not Implemented
Compliance of Vishakha Committee
Guidelines for prevention of women
harassment at workplace. Not Applicable

1.3.5: Mine Location Details

Toposheet Number:

1.3.5.1: Location of Boundary Pillars


Pillar Latitude Pillar Longitude
Pillar No. (dd:mm:ss.ss) (dd:mm:ss.ss)

Add Row

1.3.6: Nominated Owner Details


Name Address PAN of Nominated Owner Address of Nominated Owner Mobile Number Email

Add Row

1.3.7: Qualified Person Details


Sr No Prefix Name PAN of QP Address Mobile no. Qualification Email

Add Row
Chapter 2: GEOLOGY & EXPLORATION Next Previous

2.1: GEOLOGY
2.1.1: Topography
Terrain *

RELIEF
Highest Level (m) from MSL * Lowest Level (m) from MSL *

Drainage Pattern * Order of Stream * Minimum Distance of Stream from Lease Area (m) *

Major River/ Stream/ Nala if any 5 Kms from Mining Lease

2.1.2: Regional Geography


Regional Geography *

2.1.3: Local Geography & Structure


2.1.3.1: Local Geological Set-up *

2.1.3.2: Structure *

2.1.3.3: Lithology, Petrographic & Mineralogical Description for Major, Associated & Indicator Minerals *

2.1.3.4: Mode of Occurance & Controls of Mineralization *


2.1.3.5: Extent of Weathering/ Alteration *

2.1.3.6: Nature/Form of Mineral: Lump


Specify If any other Fines
Friable
Platy
2.1.3.7: Extent of Mineralization: Fibrous
Powdery

2.1.3.8: Deposit Type (as per MEMC Rule) Bedded Stratiform & tabular deposits of regular habit
Bedded Stratiform
N & tabular deposits of irregular habit
Strike / Trend of the Ore Body: * Amount of Dip of the Mineral Body (degree) * Float or Placer
NE deposits
TO E
SE
Undulating
Plateaux
RELIEF Hilly
Highest Level (m) from MSL * Lowest Level (m) from MSL *

Drainage Pattern * Order of Stream * Minimum Distance of Stream from Lease Area (m) *
Dendritic Order 1
Parallel Order 2
Trellis Order 3
RectangularOrder 4 & above
2.2: Exploration Radial
Annular

2.2.1: Summary of The Previous Exploration During Last Plan Period Others

Name of The Agency *

Geological Mapping Ground Geophysical Survey Geochemical Survey Beneficiation Test

Pitting Trenching Drilling Airborne Geophysical Survey

Sampling Chemical Analysis Petrographic & Mineragraphic Studies

Bulk Density (t/m3) Area Covered under Exploration Exploratory Mining

2.2.1.1: Geological Mapping


Sl. No. Year Scale Area Covered (ha)
Year 1 1:1000
Year 2 1:2000
Year 3 1:5000
Year 4
Year 5
Add Row

2.2.1.2: Airborne Geophysical Survey


Sl. No. Type of Survey Spacing (m) Total line (km) Area Covered (ha) Latitude Longitude
Magnetic

Radiometric
Add Row
2.2.1.3: Ground Geophysical Survey Magnetic
Induced Polarization (IP)
Sl. No. Type of Survey Spacing (m) Total line (km) Area Covered (ha) Latitude Longitude Self-Potential (SP)
Gravity
Resistivity
Electromagnetic

Add Row

2.2.1.4: Geochemical Survey


Sl. No. Type of Sample No of Samples
Stream Sediments

Rock-chip
Add Row

2.2.1.5: Pitting
Sl. No. Pit ID Length of Pit (m) Width of Pit (m) Depth of Pit (m) Litho Unit Exposed
Litho Unit From (m)
Litho Unit To (m)
Average Grade
Running
(%) Meters (m) Latitude Longitude

Add Row

2.2.1.6: TRENCHING

Number of Trenches * Number of Trenches *

2.2.1.6.1: SPACING
Min (m) * Max (m) * Avg (m) *
0

2.2.1.6.2: Area Covered Under Trenching


Co-ordinates
Lattitude * Longitude *
North East
North East
North East
North East

Length of Trench Litho Unit Average Grade Running From


Sl. No. Trench ID Width of Trench (m) Depth of Trench (m) From Latitude To Latitude To Longitude
(m) Exposed (%) Meters (m) Longitude

Add Row

2.2.1.7: Drilling

2.2.1.7.1: Core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0

Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.1.7.2: Non-core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0

Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.1.8: Exploratory Mining


Sl. No. Pit ID Volume (m³)

Add Row

2.2.1.9: Exploratory Drilling

Surface Drilling

2.2.1.9.1: Core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
0
Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.1.9.2: Non-core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
0
Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

Underground Drilling

2.2.1.9.3: Core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
0
Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.1.9.4: Non-core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
0

Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

Drive

Location Of
Sl. No. Type Drive id Size Of Drive (m x m) Length of Drive (m)
Drive Drives
X-Cuts
Raises
Winzes
Add Row
Decline
Incline
Adits
Shafts

2.2.1.10: SAMPLING Soil


Rock-chip
Sl. No. Type of Sample Number of Samples Area Covered (ha) Latitude Longitude
Drill Core

Add Row

2.2.1.11: Chemical Analysis SILVER LEAD & ZINCOthers


ORE
Ag Pb Others
S.No. Sample ID Minerals Radical Analysis Others ZnCO3
LEAD & ZINC ORE Others

Add Row

2.2.1.12: Petrographic & Mineragraphic Studies


Mineral
Number of Sample Number of Sample
Sl. No. Type of Sample Drawn Analyzed Petrographic Study Report Waste

Add Row

2.2.1.13: Beneficiation Test Process Mineralogical Study


Amenability Study

Sl. No. Type of Beneficiation Number of Samples Lab Scale


Pilot Scale
Others
Add Row
2.2.1.14: Bulk Density

Sl. No. Rock Types Number of Samples Minerals Bulk Density Established (t/m³)

Add Row

2.2.1.15: Area Covered under Exploration


G1 (Ha)
G 2 (Ha)
G3 (Ha)
G4 (Ha)
G1+G2+G3+G4 (Ha) 0

2.2.2: ORE BODY GEOMETRY & GRADE


Chemical Properties Physical Prperties N-S N

Dip Of Mineral Average Strike Length Average Depth Max Grade Cut-off Provide Justification for
Sl. No. General Strike / Trend Body (m) Average Width (m) (m) Min Grade (%) (%) Avg Grade (%) Grade Defining Cut-off Grade Min Size (mm) Max Size (mm) E-W E
NE-SW W
NW-SE S
NE
SW
NW
SE

Add Row

Sectional Area method


2.2.3: Reserve / Resource Estimation Method Plan Area method
Software Used

2.2.3.1: Methodology
Resource / Reserve Estimation Method *

Methodology

2.2.3.2: RESERVE CALCULATION (PLAN AREA METHOD) 111 121 122 211

Bulk Density Reserve Quantity


Sl. No. Pit No/ Bore Hole Influence Area (m²) Depth (m) Volume (m³) (t/m³) (t) UNFC Type of Land Grade (%)

Add Row

2.2.4: Reserve / Resource Estimation Method

2.2.4.1: Mineral Resource Estimate for Conservation to Mineral Reserve

2.2.4.2: Cut off Parameters

2.2.4.3: Mining Factors or Assumptions


2.2.4.4: Metallurgical Factors or Assumptions

2.2.4.5: Cost & Revenue Factors

2.2.4.6: Market Assessment

2.2.4.7: Other Modifying Factors

2.2.4.8: Classification

2.2.5: RESOURCES BLOCKED UNDER STATUTORY BARRIERS


Particulars G-1 (t) G-2 (t)
7.5 m Barrier Zone 0 0
Blocked in Bench
Slope 0 0
Blocked due to Public
Structures 0 0
G-1 (t)
0 0
G-2 (t) 0 0

Total 0 0

2.2.5.1: Mineral Add subsequent tables for other associated minerals


Reserves Already estimated on 01-04-
Classification Code Quantity Grade
Forest Non-Forest Total Forest Non-Forest
A. Mineral Reserve
1. Proved Mineral Reserve (A) 111 0
2. Probable Mineral Reserve (A) 121 & 122 0

B. Remaining Resources
1. Feasibility Mineral Resource (B) 211 0
2. Prefeasibility Mineral Resource (B) 221 & 222 0
3. Measured Mineral Resource (B) 331 0
4. Indicated Mineral Resource (B) 332 0
5. Inferred Mineral Resource (B) 333 0
6. Reconnaissance Mineral Resource (B) 334 0

Total Mineral Resources (A+B) 0

2.2.6: Future Exploration Proposal Others

Name of The Agency *

Geological Mapping Ground Geophysical Survey Pitting

Trenching Drilling Exploratory Mining

Sampling Chemical Analysis Petrographic & Mineragraphic Studies

Beneficiation Test Bulk Density (t/m3) Exploratory Drilling


2.2.6.1: Geological Mapping
Sl. No. Year Scale Area Covered (ha)
Year 1 1:1000
Year 2 1:2000
Year 3 1:5000
Year 4
Year 5

Add Row

2.2.6.2: Ground Geophysical Survey Magnetic


Induced Polarization (IP)
Sl. No. Type of Survey Spacing (m) Total line (km) Area Covered (ha) Latitude Longitude Self-Potential (SP)
Gravity
Resistivity
Electromagnetic

Add Row

2.2.6.3: Pitting
Sl. No. Pit ID Length of Pit (m) Width of Pit (m) Depth of Pit (m) Litho Unit Exposed
Litho Unit From (m)
Litho Unit To (m)
Average Grade
Running
(%) Meters (m) Latitude Longitude

Add Row

2.2.6.4: TRENCHING

Number of Trenches * Number of Trenches *

2.2.6.4.1: SPACING
Min (m) * Max (m) * Avg (m) *
0

2.2.6.4..2: Area Covered Under Trenching


Co-ordinates
Lattitude * Longitude *
North East
North East
North East
North East

Length of Trench Litho Unit Average Grade Running From


Sl. No. Trench ID Width of Trench (m) Depth of Trench (m) From Latitude To Latitude To Longitude
(m) Exposed (%) Meters (m) Longitude

Add Row

2.2.6.5: Drilling
2.2.6.5.1: Core Drilling
Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0

Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.6.5.2: Non-core Drilling


Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
Add Row

Litho Unit Average Grade Running Bore Hole Collar R.L


Sl. No. Drill Hole ID Type of Drilling Depth From (m) Depth To (m) Bottom R.L (m) Latitude Longitude
Exposed (%) Meters (m) Inclination (°) (m)

Add Row

2.2.6.6: Exploratory Mining


Sl. No. Pit ID Volume (m³)

Add Row

2.2.6.7: SAMPLING Soil


Rock-chip
Sl. No. Type of Sample Number of Samples Area Covered (ha) Latitude Longitude
Drill Core

Add Row

2.2.6.8: Chemical Analysis SILVER LEAD & ZINCOthers


ORE
Ag Pb Others
S.No. Sample ID Minerals Radical Analysis Others ZnCO3
LEAD & ZINC ORE Others

Add Row

2.2.6.9: Petrographic & Mineragraphic Studies


Mineral
Number of Sample Number of Sample
Sl. No. Type of Sample Drawn Analyzed Petrographic Study Report Waste

Add Row

2.2.6.10: Beneficiation Test Process Mineralogical Study


Amenability Study

Sl. No. Type of Beneficiation Number of Samples Lab Scale


Pilot Scale
Others

Add Row

2.2.6.11: Bulk Density

Sl. No. Rock Types Number of Samples Minerals Bulk Density Established (t/m³)

Add Row
Chapter 3: MINERAL BENEFICIATION / PROCESSING Next Previous

Name of The Mineral

3.1: Mineralogy of the Mineral:


S. No. Valuable Mineral Mineral Name Mineral Percentage (%) Gangue Minerals Mineral Name Gangue Mineral Percentage (%)

Add Row

3.2: Chemical Analysis of the Run of Mine:


S.No. Minerals Radicals Weighted Percentage (%)

Add Row

3.3: Communition -Crushing Circuit: Jaw Crusher Gyratory Crusher


S. No. Type of Crusher Make Capacity (tph) Feed Size (mm) Product Size (mm)

Add Row

3.4: Primary Crushing Jaw Crusher Gyratory Crusher Others


Sl. No. Type of Crusher Make Capacity of Crusher (tph) Feed Size (mm) Product Size (mm)

Add Row

3.5: Secondary Crushing Cone HPGR Others


Sl. No. Type of Crusher Make Capacity of Crusher (tph) Feed Size (mm) Product Size (mm)

Add Row

3.6: Tertiary Crushing Cone Crusher Roll Crusher Impact Crusher Hammer Mill
Sl. No. Type of Crusher Make Capacity of Crusher (tph) Feed Size (mm) Product Size (mm)

Add Row

3.7: Grinding Circuit


Sl. No. Type of Mill Make Capacity of Grinding Circuit (tph) Feed Size (mm) Product Size (mm) Feed Water (l) Discharge Water (l) Type of Classifier Make2 Capacity (tph) Overflow size (mm)

3.8: Wet Processing

3.8.1: Washing
Sl. No. Type of Washer Make Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l)

Add Row

3.8.2: Scrubbing
Sl. No. Type of Scrubber Make Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l) Sand (t) Slimes (t) Volumetric Flow rate of Slimes (t)

Add Row

3.8.3: Chemical Analysis of Washed/Scrubbed Products :


Sand (t)
Radical
Percentage (%)
Slimes (t)
Radical
Percentage (%)
3.9: Dry Processing

3.9.1: Screening
Sr No. Type of Screen Number of Decks Aperture Size of Screen (mm) Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l) Oversize (mm) Undersize (mm)

Add Row

3.9.2: Chemical Analysis


Sand (t)
Radical
Percentage (%)
Slimes (t)
Radical
Percentage (%)
Chapter 4: MINING OPERATIONS Next Previous

4.1: MINING METHOD (Opencast) Title


Index
4.1.1: Existing Method of Mining
Manual Mechanized General information
Geology & Exploration
Surface Miner Combination of Loaders & HEMM without deep hole HEMM without deep hole Mineral Processing
Tipper Drilling Drilling Mining Operations
Sustainable Mining
PMCP
4.1.2: Proposed Method of Mining
Manual Mechanized Financial Assurance
Surface Miner Combination of Loaders & HEMM without deep hole HEMM without deep hole Review of Previous proposals
Impact Assessment(fresh grant)
Tipper Drilling Drilling Annexures
Reasons for Proposed Changes
Plates

4.2: Operational Parameters


4.2.1: Inventory of Existing Pits & Dumps
4.2.1.1: PITS
S.No. Pit ID Pit Status Area Covered by Pit (Ha) Pit Dimension

Add Row

4.2.1.2: DUMPS & STACK


4.2.1.2.1: DUMP DETAILS
S.No. Dump ID Dump Status Type of Dump Total Dump Quantity (t) Area covered by Dump Height (m) Location

Add Row

4.2.1.2.2: STACK DETAILS


S.No. Stack ID Type of Stack Total Stack Quantity (t) Area covered by Stack (Ha) Height (m)

Add Row

4.2.1.3: DETAILS OF STABILIZED DUMPS


Sl. No. Dump ID Number of Terraces Average Height of Terraces Length of Toe Wall (m) Length of Garland Drain Area Stabilized (ha) Method of Stabilization

Add Row

4.2.2: Opencast Mining


4.2.2.1: Bench Parameters Year 1
Pit Id Year Max Height of the Benches in Over Burden (m) Min Width of the Benches in Slope of the Bench in Over Max Height of the Benches Max Width of the Benches in Mineral (m) Slope of the Bench in Mineral (degree) Overall Slope of Pit (degree) Number of Benches in Top Soil Number of Benches in Over Number of Benches in Mineral Max Depth of Workings (m) Depth of Water Table (m) Max Slope Angle of Haul Roads (1 in) Year-Wise Development & Production Year-Wise Development &
Over Burden (m) Burden (degree) in Mineral (m) Burden Plan Production Sectio

Add Row

4.2.2.2: Yearwise Opencast Development


Bulk Density of ROM Volume
Overburden (BD1) Top Soil Volume (Length x Width x (Length x Width x Height)
Sr No Year Pit ID Bench Direction (Kg/m3) Bulk Density of Mineral (BD2) (Kg/m3) Height) (m3) Over Burden Volume (Length x Width x Height) (m3) Over Burden Quantity (t) (m3) ROM Quantity (t) Recovery Mineral Reject (t) Production Main (t) Production Associated (t) Location of Advancement OB to Ore Ratio Bench 1 Bench 2 Bench 3 Bench 4
Year 1 North East South West
Add Row

Total Over Burden Volume Total Over Burden Quantity


3 3 3
S.No. Pit ID Total Topsoil Volume (m ) (m ) (t) Total ROM Volume (m ) Total ROM Quantity (t)

Add Row

4.2.2.3: Transportation & Hauling Equipment


3
S.No. Type Make Capacity (m ) No. of Equipments Dumper Tipper Truck Tractors

Add Row
4.3: Material Handling Summary

4.3.1: Studies Undertaken


Blast Vibration Study Report Yes
Slope Stability Study Report No
Recovery Study Report
Hydrological Study Report
Mineral Beneficiation Study Report
Underground Rock Displacement Study Report
Subsidence Study Report
Underground Geotechnical Study Report
Any Other Study Report
Bulk Density Study Report

4.3.2: INSITU MINING


ROM Quantity Saleable OB to Ore Ratio (Waste Quantity /
Sl. No. Year Total Handling (t) Waste Quantity (t) ROM Quantity (t) Mineral (t) ROM Quantity Mineral Reject (t) ROM Quantity) Grade Range (%
Year 1
Add Row

4.3.3: Dump Re-handling


Proposed Recovery of
2
Sl. No. Year Dump Id Location Latitude Location Longitude Area (m ) Avg Height of Dump (m) Volume (m³) Total Dump Quantity (t) Proposed Dump Handling Quantity (t) (A) Saleable Mineral (t)(B) Proposed Waste Quantity (t) (A-B) Grade Range (%) Justification

Add Row

4.3.4: Calculation Summary


Year Year 1 Year 2 Year 3 Year 4 Year 5 Total
Saleable Ore (t) (A) 0
Handling Quantity (t) (B) 0
Proposed Dump Handling
Quantity (t) (C) 0
Recovery of Saleable Mineral
(t) (D) 0

Total Production Quantity (t)


(A+C) 0
Total Handling Quantity (t)
(B+D) 0

4.4: Machine Calculation


4.4.1: Machine Requirement Summary
Number of Average Working Days in One Year (A)
Number of Shifts per Day (B)
Material Handling Required per Day (t) ((D)=Largest of (Q1,Q5)/(A))
Material to be Handled per Shift (t) ((E)=(D)/(B))
Handling Required per Hour (t) ((F)=(E)/8 hours)
Effective Shift Time

4.4.2: Shovel / Excavator Requirement


Effective Shift Time: 0 0 4 hrs 5 hrs 6 hrs 7 hrs

Maximum handling of the


Tonnage Factor (m³/t) (G) TPH =TPH (G) =((3600 x A x B x C x D x E ) / Total Hours (H) =Number of working days x Number Yearly handling by one material by this machine during
Sl. No. Type Bucket Capacity (m³)(A) Fill Factor (B) Swell Factor (C) (D) Efficiency (%) (E) Cycle time (sec) (F) F)/1000 of shifts/day x Effective shift hours Excavator (t) (I)=(G x H) the block period (t) (J) Number of excavator machines required (K) = (J / I) Standby excavator (L) 00 mins 30 mins

Add Row

4.4.3: Dumper Requirement


Effective Shift Time: 0 0

Total Hours=Number of working days


(W)x Number of shifts/day x Effective Time taken to cover
shift hours (Machine Requirement Speed of the dumper distance in minutes(iii) Queuing, Loading Time at Shovel (min) Queuing, Unloading Time during Total transportation per Yearly handling by one dumper Maximum handling of the material by this machine during the Number of dumpers will be (xi)
Sl. No. Summary) (A) Capacity of Dumpers (t) (B) (KMPH) (i) Lead Distance (KM) (ii) =(ii/i) x 60 (iv) unloading (min) (v) Total Time to complete one trip(vi) = (iii + iv + v ) No. of Trips / hr = (60 / vi) hour =( B X vii) (ix) = A x TPH block period (t) (x) =( x / ix) Plus Standby dumper (xii)

Add Row

4.4.4: Drill Machine Requirement


Effective Shift Time: 0 0

Bulk Density of Waste Drilling Requirement per Required Number of Drills


Sl. No. Type of Drill Depth of Hole(including Sub-grade Drilling (m) Spacing (m) Burden (m) (t/m³) Bulk Density of Mineral (t/m³) Yield per Hole (t) Yield per Meter (t/m) Annual Target Known (t) Day (m) Drilling Requirement per Shif t(m) Rate of Drilling per Hours (m/hr) (m/c) Stand by Drill Electrical Mechanical Hydraulic

Add Row

4.4.5: Machine Deployment Details


4.4.5.1: Excavator & Loading Equipment

S.No. Type Make Capacity (m3) No. of Equipments

Add Row

4.4.5.2: Dozers Details


S.No. Type Make Capacity (hp) No. of Equipments

Add Row

4.4.5.3: Drilling Details


S.No. Type Make Capacity (t) Diameter of Hole (mm)

Add Row

4.4.5.4: Supervision
In Position / Existing
Sl. No. Particulars Qualification Requirement / Proposed Strength (-) Shortage / (+) Excess Remarks

Add Row
4.5 Blasting Requirement

4.5.1: Blasting & Explosive Requirement in Waste/Development


Yield per Holes in Waste Frequency of Blasting in Maximum Number of Holes Blasted in Explosive Requirement Per Month in Development Powder Factor in
Sl. No. Drill Pattern / Spacing of Holes (m) Burden of Holes (m) Number of Rows / Rings (m³) a Week a Round Charge per Hole (kg) Charge per Round (kg) (kg) Development / Waste (kg/t) Depth Of Hole

Add Row

4.5.2: Blasting & Explosive Requirement in Mineral / Ore


Type of Explosive Type of Explosives used / to be Used
Permitted Explosives Non-Nitro Glycerin Non Aluminised

Total ROM proposed to be handled in


Sl. No. CUM/annum Total ROM proposed to be handled in CUM/ day Spacing of Holes (m) Burden of Holes (m) Number of Rows Yield per Holes in ROM Zone (m³) Frequency of Blasting in a Week Maximum Number of Holes Blasted in a Round No of Holes Required to be Blasted per Round Charge per Hole (kg) Charge per Round (kg) Explosive Requirement Per Month for ROM Zone Blasting (kg) Powder Factor in Ore (kg/t) Pop Shooting (no of Boulders) Plaster Shooting (no of Boulders) Use of Rockbreaker Capacity Secondary Blasting Requirements Depth Of Hole

Add Row

4.6: Man Power Deployment


4.6.1: Managerial
Sr No Particulars Number of Persons in Shift 1 Number of Persons in Number of Persons in Number of Persons in Total No. of Persons per day
0
Add Row

4.6.2: Supervisory Foreman Mine-mate


Sl. No. Particulars Number of Person in Shift 1 Number of Person in Shift 2 Number of Person in Shift
Number
3 of Person in General ShiftTotal Number of Person per Day
0
Add Row

4.6.3: Skilled Workers / Operators Operator Dumper Operator


Number of Persons in Number of Persons in Number of Persons in
Sr No Particulars Number of Persons in Shift 1 Total No. of Persons per day
Shift 2 Shift 3 General Shift
0
0
Add Row

4.6.4: Semi-skilled Workers


Number of Persons in Total No. of Persons per
Number of Persons in Shift 1 Number of Persons in Shift 2 Number of Persons in Shift 3
General Shift day
0

4.6.5: Unskilled Workers


Number of Persons in Total No. of Persons per
Number of Persons in Shift 1 Number of Persons in Shift 2 Number of Persons in Shift 3
General Shift day
0

Number of Persons in Number of Persons in Number of Persons in


Sr No Particulars Number of Persons in Shift 1 Total No. of Persons per day
Shift 2 Shift 3 General Shift
0
0
Add Row

4.6.6: No of Persons Engaged Per Day


Number of Persons in Total No. of Persons per
Number of Persons in Shift 1 Number of Persons in Shift 2 Number of Persons in Shift 3
General Shift day
0

No of Shifts per Day ((A) = Machine Requirement Summary (B))


Average Daily Employment per Shift ((B) = (Total Number of Person per Day) / (A))
Material to be Handled per Shift ((C) = Machine Requirement Summary (E)) Year 1
Year 2
Year 3
Year 4

4.7: Waste Management Year 5

4.7.1: Existing Dump


Sl. No. Year Dump Id Type of Dump Proposed Area (ha) Height (m) Total Dump Quantity (m³) Existing Dump Location

Add Row

4.7.2: New Dump


Sl. No. Year Dump Id Type of Dump Proposed Area (ha) Height (m) Total Dump Quantity (m³) New Dump Location Waste Mineral Reject

Add Row

4.7.3: Existing Stack


Sl. No. Year Stack ID Type of Stack Proposed Area (ha) Height (m) Total Stack Quantity (m³) Existing Stack Location

Add Row

4.7.4: New Stack


Sl. No. Year Stack ID Type of Stack Proposed Area (ha) Height (m) Total Stack Quantity (m³) New Stack Location

Add Row

4.8: Mineral Waste Handling To Utilize As Minor Mineral


Sl. No. Year Dump Id Type of Dump Proposed Area (ha) Quantity Handled (t) Quantity Recovered (t) Name Of Minor Mineral Alternative Waste Utilization (m³)

Add Row

4.9: Use of Minerals


Sl. No. * Name Of Mineral Relevant Use Of Mineral Physical Specifications Chemical Specifications
Proposed Use Of Mineral
List List

Add Row

* Choose among these:


1) Captive use in Own Industry
2) Direct Selling
3) Selling Post-Beneficiation /
Up-gradation
*Select more than one, if
applicable
Chapter 5: SUSTAINABLE MINING
5.1: Sustainable Mining and SDF Implementations in Compliance of Rule 35 of MCDR’2017

(Total 200 characters)

5.2: CSR INITIATIVES


5.2.1: YEAR 1-5 (Separate form for each year as below)
Details of Work Proposed during the Estimated Expenditure during the Year Cumulative Work done / Measures Taken Cumulative Expenditure up to Last Year
Year / Measures Planned for the (INR) (INR)
Affected
5.2.1.1: Segment
Area to be Developed for Recreation
Area (Ha) Area (Ha)

5.2.1.2: Area for Water Storage & Recharge Facility


Area (Ha) Area (Ha)

5.2.1.3: Efforts Made towards Housing for Local Communities


Number of Houses Number of Houses

5.2.1.4: Efforts Made towards Providing Transport to Local Communities


Number of Beneficiaries Number of Beneficiaries

5.2.1.5: Efforts Made towards Providing Healthcare to Local Communities


Number of Beneficiaries Number of Beneficiaries

5.2.1.6: Efforts Made towards Providing Hygiene & Sanitation to Local Communities
Number of Beneficiaries Number of Beneficiaries

5.2.1.7: Efforts Made towards Skill Development Programs to Local Communities


Number of Beneficiaries Number of Beneficiaries

5.2.1.8: Efforts Made to Promote Education & Knowledge Based Initiatives


Number of Beneficiaries Number of Beneficiaries

5.2.1.9: Communication Facilities Provided to Local Communities


Number of Beneficiaries Number of Beneficiaries

5.2.1.10: Any Other Steps Taken for Improving the Socio-Economic Standard of Local Communities
Number of Beneficiaries Number of Beneficiaries

5.2.1.11: Adoption of ODF

Number of Toilets Built inside the Lease Area: Number of Toilets Built outside the Lease Area: Expenditure(INR): Number of Beneficiaries

5.2.1.12: Awareness Program among Mine Workers for Swatchata


Number of Swatchata Programmes Number of Swatchata Programmes Held:
proposed:

5.2.1.13: Efforts for green energy


Total energy consumption (KWh) Green energy consumption (% of total)

5.2.1.14: Water & recycled use


Total water consumption (KLD) Water recycled (% of total)

5.3: REHABILITATION & RESETTLEMENT OF AFFECTED PERSONS


Particular Year 1 Year 2 Year 3 Year 4 Year 5
Proposed Number of Project Affected Persons(PAP)
Proposed Number of Person for Alternate Arrangement for Sustainable Livelihood
Proposed Number of Person for Skill Training
Proposed Number of Person Likely to get Direct Employment
Proposed Number of Person Likely to get Indirect Employment
Proposed Project Affected Families Skilled and Absorbed
Proposed Number of Project Affected Families
Chapter 6: PROGRESSIVE MINE CLOSURE PLAN Previous Next

6.1: Status of Land


Other Areas Reclaimed and
Total Area Degraded Total mined out area Reclaimed and Rehabilitated Rehabilitated

Total area under excavation in the lease


Area under
Water Reservoir Stabililized
Area under Mined outArea fully considered Waste dump Virgin area
Area under mining Mined Out area in Area under Area under utility Stack yards(in Mined out Area Reclaimed but Rehabilitated from Reclaimed Rehabilitated (in Rehabilitated (in under Green
operation the lease Dumps(in hect) services(in hect) hect) not rehabilitated(in hect) area(in hect) hect) hect) Belt (in hect)

6.2: Progressive Reclamation and Rehabilitation Plan


6.2.1: Backfilling
3
Quantity of Waste / Fill Material Available at Site (m )
Availability of Top Soil for Spreading (m3)
Spread Area (m2)

Year Wise Proposal


Sr No Year Pit ID Area (m2) Top RL Bottom RL Estimated Expenditure (INR)

6.2.2: Water Reservoir


Average Rainfall of The Area (mm)
Proposed Area under Water Storage

6.2.2.1: Preparations For Ground Water Recharging


6.2.2.1.2:Preparation of
6.2.2.1.1: Drilling Holes Course Gravel Bed
Year Proposed no of Holes Year Proposed Area
to be Drilled of Bed (LxW)

Year 1 Year 1
Year 2 Year 2
Year 3 Year 3
Year 4 Year 4
Year 5 Year 5
Chapter 7: FINANCIAL ASSURANCE (AREA PUT TO USE) Next Previous

YEAR 1-5 (Separate form for each year as below)


Consolidated View of Financial Assurance
Degraded Area at Start of Year Additional Requirement (ha)
Sl. No. Particular Total (ha) (C = A + B)
(ha) (A)* (B)*
1 Area under Mining 0
2 Topsoil stacking 0
3 Overburden/Waste Dumping 0
4 Mineral Storage 0
Infrastructure (Workshop,
5
Administrative Building etc.) 0
6 Roads 0
7 Railways 0
8 Tailing Pond 0
9 Effluent Treatment Plant 0
10 Mineral Separation Plant 0
11 Township Area 0
12 Others to Specify 0

Total 0 0 0
Grand Total
Chapter 9: IMPACT ASSESSMENT(for fresh grant) Next Previous

9.1: BASELINE INFORMATION


Whether Area falls under Forest* Yes
Whether Area falls under Wildlife Sanctuary* No
Whether Area falls under Coastal Regulation Zone (CRZ)*
Whether Area falls under Defence Land*
Any Other Clearance (specify)*
Any Significant Objections from any Agency Involved in Stakeholder’s Consultation.

(Total 500 characters)

9.2: Environment Parameters


9.2.1: Environment Monitoring
Monitoring Activity

9.2.1.1: Ambient Air Quality


Core Zone (Quarterly Monitoring Planned) * No
Buffer Zone (Quarterly Monitoring Planned) * No

9.2.1.2: Water Quality


Core Zone (Quarterly Monitoring Planned) * No
Buffer Zone (Quarterly Monitoring Planned) * No

9.2.1.3: Noise Level


Core Zone (Quarterly Monitoring Planned) * No
Buffer Zone (Quarterly Monitoring Planned) * No

9.3: Impact Assessment


9.3.2: Land Environment
9.3.2.1: BASE / PRESENT STATUS
Pre Mining Use AREA (Ha)
Barren / Waste land with small bushes & shrubs
Land under Agriculture / Crops
Land covered with Plants
Land under Grass Cover
Land under Public Infrastructure / Utilities (water bodies, roads,
railways, electric lines, telephone lines etc.)
Land under Habitation
Land under Monuments & places of Historical Importance
Degraded by Pits & Excavation
Degraded by Dumps & Material Staking
Covered under Mine Infrastructure (plants, shades, buildings etc.)
Land under Forest
Historically, Culturally & Ecologically Important Places
Any Other, please specify below

Date of Observation

9.3.2.2: ANTICIPATED IMPACT


Post Mining Use AREA (Ha)
Degradation by Excavation
Degradation by Dumps & Material Staking
Covered under Plants, Shades & Buildings
Covered by Roads & Approaches
Manganese Ore
Any Other, please specify below

9.3.2.3: MITIGATION MEASURES


9.3.2.3.1: Backfilling *
(Total 1000 characters)

9.3.2.3.2: Area proposed to be covered by Plant in Backfilled Area *

(Total 1000 characters)

9.3.2.3.3: Proposed Area under Agriculture *


(Total 1000 characters)

9.3.3: Air Environment


9.3.3.1: Climate & Meteorology (Please provide average of 10 years) Monsoon
Temperature (°C) * Relative Humidity (%) * Average Rainfall (mm) *
Maximum
Minimum

9.3.3.2: Air Quality Details for Base line Information / Present Status
Free Free Rate of Rate of Heavy Heavy
SO2 SO2 NOX NOX CO RPM RPM Date of
CO Value Silica Silica Dust Fall Dust Fall Metals Metals
Sr. No. Station Name Season SPM Value (µg/m3) SPM Excess (µg/m3) RSPM Value (µg/m3) RSPM Excess (µg/m3) Value Excess Value Excess Excess Value Excess Observat Action
(µg/m3) Value Excess Value Excess Value Excess
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) ion
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3)
Winter
Winter
Add Row
9.3.3.3: Impact Assessment & Mitigation Measures

9.3.3.3.1: Anticipated Impact *


Give details on Prediction of fugitive dust emissions due to mining activities, crushing & cleaning plants, loading & unloading, transportation by rail, road or conveyor

(Total 1000 characters)

9.3.3.3.2: Mitigation Measure *


Give details on measures to reduce the emissions of pollutants during mining, loading, unloading, transportation, drilling, blasting, crushing etc. to maintain the air quality

(Total 1000 characters)

9.3.4: Water Environment


9.3.4.1: RAIN WATER

9.3.4.1.1: Base / Present Status *


(Details of Rivers, Springs, Lakes, Reservoirs & Drains up to First Order in Study Area)

(Total 1000 characters)


9.3.4.1.2: Anticipated Impact *
(Impact on Surface Water Bodies / Groundwater Table Regime / Streams / Lake / Springs due to Mining, to be Assessed from Hydro-geological StudyGive details about impact on vegetation)

(Total 1000 characters)

9.3.4.1.3: Mitigation Measure *


(Possibilities of Rain Water Harvesting & Artificial Recharge with in the Mining Lease)

(Total 1000 characters)

9.3.4.2: WATER BODY

9.3.4.2.1: Base / Present Status *


(Water Bodies Existing & Water Bodies likely to be created due to Mining Activities & their Water Holding Capacity)
(Total 1000 characters)

9.3.4.2.2: Anticipated Impact *


(Ingress of Sea Water, Particularly for Mining Projects in Coastal Areas)

(Total 1000 characters)

9.3.4.2.3: Mitigation Measure *


(Steps to Minimize Impact on Water Table if Mining Intercepts Groundwater Regime)

(Total 1000 characters)

9.3.4.3: WATER BALANCE

9.3.4.3.1: Base / Present Status *


(Water Balance (Withdrawal of Surface Water & Release of Mine Drainage Water) Water Requirement & Waste Water Generation from various Activities of Mine, Including Beneficiation)
(Total 1000 characters)

9.3.4.3.2: Anticipated Impact *


(Impact of Water Drawl on Surface & Groundwater Resources Impact on Surface & Groundwater Quality due to Discharges from Mining, Tailings Pond,
Workshop, Township, & Leach ate from Solid Waste Dumps etc)

(Total 1000 characters)

9.3.4.3.3: Mitigation Measure *


(Construction of Check Dams, Sedimentation Ponds, Settling Tanks, Retaining Walls etc. with Design & Site Features for Control of run-off Mine Water
Treatment for Meeting the Prescribed Standard Waste Water Treatment for Township Sewage, Workshop(s), Tailing Pond Overflow etc)

(Total 1000 characters)


9.3.5: NOISE
9.3.5.1: Critical Locations Identified within Lease Area *

(Total 1000 characters)

9.3.5.2: Give Detail About Prediction of Noise Level by using Mathematical Modeling at Different Locations Identified *

(Total 1000 characters)

9.3.5.3: Measures to Minimize the Impact on Receiving Environment *


(Total 1000 characters)

9.3.5.4: Noise Details for Base / Present Status

Noise Standards *
Limits in dB(A)Leq
Area Code Category of Area
Day Time Night Time
A Industrial Area 75 70
B Commercial Area 65 55
C Residential Area 55 45
D Silence Area 50 40

Note: Industrial
1. Day time reckoned in between 6.00 am to 9.00p.m Commercial
2. Night time reckoned in between 9.00p.m.to 6:00am Residential
3. Silence zone is defined as areas up to 100 meter around such premises as Hospitals, Educational institutes and Courts. The Silence zones are to be declared by the competent Authority Silence Zone
4. Mixed categories of areas should be declared as "one of the four above mentioned categories" by the Competent Authority and the corresponding standards shall be applied.

Excess Date of
Sl. No. Station Name Season Type of Area Noise At Day Time: Excess Noise At Day Noise At Night Time: Noise at Observat Action
Night ion

Add Row

9.3.5.5: Impact Assessment & Mitigation Measures

9.3.5.5.1: Anticipated Impact *


Give details on impact on ambient noise level due to rock excavation, transportation, processing equipment’s & ancillaries

(Total 1000 characters)


9.3.5.5.2: Mitigation Measure *
Give details on measures for noise abatement including point source & line source

(Total 1000 characters)

9.3.6: VIBRATION

9.3.6.1: Vibration Details for Base / Present Status

Date of
Distance from the Peak Particle Velocity
Sl. No. Station Name Season Air Over Pressure (DB) Frequency (Hz) Observat
Blasting Site (m) (mm/s)
ion

Add Row

9.3.6.2: Impact Assessment & Mitigation Measures

9.3.6.2.1: Anticipated Impact *


(Give details on impact of vibrations including damage to materials/structures due to blasting)
(Total 1000 characters)

9.3.6.2.2: Mitigation Measure *


Give details on measures for noise abatement including point source & line source

(Total 1000 characters)

9.3.7: SOCIO-ECONOMIC ENVIRONMENT


9.3.7.1: Demographic Profile
Sl. No. Type of Area Name of Village Total Population Male to Female Ratio Literacy Rate (%) Employment Rate (%)
Scheduled
Non-Scheduled
LWE
Add Row

9.3.7.1.1: Anticipated Impact *


(Give details about impact on the cropping pattern & crop productivity in the core zone)

(Total 1000 characters)

9.3.7.1.2: Mitigation Measure *


(Give details about compensation for loss of land & crops)

(Total 1000 characters)

9.3.7.2: Traditional Skills & Source of Livelihood

9.3.7.2.1: Base / Present Status*


(Give details about present status on traditional skills & source of livelihood)

(Total 1000 characters)

9.3.7.2.2: Anticipated Impact *


(Give details about positive & negative impacts on present status of livelihood in the area)
(Total 1000 characters)

9.3.7.2.3: Mitigation Measure *


(Give details about training to locals for employment in the project training for making them self-employable or elsewhere)

(Total 1000 characters)

9.3.7.3: Economic Profile of the Population in Core & Buffer Zone

9.3.7.3.1: Base / Present Status*


(Give details about economic profile of the population in core & buffer zone)

(Total 1000 characters)

9.3.7.3.2: Anticipated Impact *


(Give details about impact on community resources such as grazing land)
(Total 1000 characters)

9.3.7.3.3: Mitigation Measure *


(Give details about employment opportunities & access to other amenities such as education, health care facilities to be extended to locals, addressing
local unemployment, tourism or recreation opportunities, efforts for sustainable development of the local community)

(Total 1000 characters)

9.3.7.4: Human Settlement in Core & Buffer Zone

9.3.7.4.1: Base / Present Status*


(Give details about human settlement in core & buffer zone)

(Total 1000 characters)

9.3.7.4.2: Anticipated Impact *


(Give details about any displacement of human settlements during the life of the mine)

(Total 1000 characters)

9.3.7.4.3: Mitigation Measure *


(Give details about rehabilitation & resettlement of land ousters & displaced people)

(Total 1000 characters)

9.3.7.5: Health Profile of Population in Core & Buffer Zone

9.3.7.5.1: Base / Present Status*


(Give details about health profile of population in core & buffer zone)
(Total 1000 characters)

9.3.7.5.2: Anticipated Impact *


(Give details about any adverse impact on the general health condition of the population in core & buffer zone)

(Total 1000 characters)

9.3.7.5.3: Mitigation Measure *


(Give details about avenues like dispensaries, hospitals, maternity homes if any to be created)

(Total 1000 characters)

9.3.7.6: Historically, Culturally & Ecologically Important Places in Core & Buffer Zone

9.3.7.6.1: Base / Present Status*


(Give details about historically, culturally & ecologically important places in core & buffer zone)
(Total 1000 characters)

9.3.7.6.2: Anticipated Impact *


(Give details about risk profiling)

(Total 1000 characters)

9.3.7.6.3: Mitigation Measure *


(Give details about public health benefits (e.g. clean water to an aboriginal community), measure for safeguard against damage etc.)

(Total 1000 characters)


Chapter 8: Review of Previous Proposals (Not applicable for Previous
fresh grant)

8.1: General
8.1.1: LEASE AREA UTILISATION
Area at the Actual Area utilized
Type of land use Area proposed Reasons for
Sl. No. beginning of the in the proposal Deviation
(in ha) under activity deviation
proposal period period
1 Mining
2 Mineral storage
Mineral
Beneficiation
3 plant
4 Township
5 Tailing Pond
6 Railways
7 Roads
Infrastructure
(Workshop,
administrative
8 building etc.)
9 OB/waste dump
Top soil
10 preservation
11 Others
Total area put to
12 use
Excavated area
13 reclaimed
Waste dump area
14 reclaimed

15 Undisturbed Area
Total

8.1.2: SDF and CSR Expenditures


List of Annexures (in pdf format):

1 Letter of Intent /Letter of lease grant


2 Copy of lease deed executed
3 Copy of Environment and Forest Clearence, Consent to Establish, Consent to Operate
4 Copy of Declaration of Owner/Nominated Owner in case of Company/partnership firm
5 Copy of Registration of Company (RoC)/Partnership firm (Registration) & Deed
6 ID & Address Proof of Owner/ Nominated Owner
7 Consent letter for Qualified Person
8 Experience & Qualification Details of Qualified Person
9 Copy of Study reports conducted as per Para 4.3.1
10 Copy of feasibility Report
11 Copy of Scale relaxation approval granted(if applicable)
12 Exploration details
13 Chemical and Minerological analysis report
14 Any other Report or Certification
15 Mineral processing flowsheet with stage wise recovery
List of Plates ( Geometry type: Polygon, Datum: WGS 84) :

1 Lease Cadastral Plan (scanned image) The Scanned copy shall be of the original lease map issued by State Government along with other details

The Plan should be submitted showing different color codes for:(1) Active Pits & Excavation area(2) Excavated area reclaimed &
rehabilitated (3)Active dumps (4) Stabilized & rehabilitated dump area , (5) Green belt (6) Mineral Stacks (7) Utilities such as
2 Surface cum Reclamation and Rehabilitaion Plan(.KML /.KMZ/.SHP format) plant, buildings etc (8) Lease boundary

The Plan should be submitted showing different color codes for : (1) Lithological/Geological Occurance (2) Area under G1,G2,G3
3 Surface Geological Plan of the lease (.KML /.KMZ/.SHP format) & G4 (3) Active pits & Excavation area (4) Dump Area (5) Mineral Stacks (6) Lease boundary

4 Surface Geological sections (in Pdf format) Yearwise geological sections with different color coding depicting all the features shown in Surface Geological Plan.

The Plan should be submitted showing different color coding for: (1) Active Pit and Excavation area , (2) Year wise excavation
proposal for year I to V ( (3) Active dump and yearwise dump proposal for year I to V (4) Year wise Dump working proposal for
5 Five year Production and Development plan(.KML /.KMZ/.SHP format) year I to V (6) Lease boundary (with reference to chapter 4)

Year wise excavation and dumping proposals with different color coding depicting all the features as shown in the Five year
6 Five year Production and Development sections(in pdf format) Production and development plan.
The Plan should be submitted showing different color coding for : (1) Yearwise excavated area Reclaimed & rehabilitated for
year I to V (2) Year wise dump area to be stabilized and dump area to be rehabilitatd for year I to V (3) Year wise Green area
proposed from year I to V.(4) Any other reclamation and rehabilitation measures proposed.(5) Lease boundary ( with reference
7 Progressive Mine Clouser Plan (.KML /.KMZ/.SHP format) to chapter 6)
Year wise Progressive mine clouser sections showing all the yearwise reclamation, rehabilitaion proposals as depicted in the
8 Progressive mine Clouser sections(in pdf format) Progessive mine clouser plan.

The Plan should depict the staus of lease area as envisaged at the end of life of Mine. Status of land use shall be depicted by
9 Conceptual Plan and section different color coding.