Preparation of Mining Plan
Preparation of Mining Plan
Index
PART A: CHAPTER 1 GENERAL INFORMATION
CHAPTER 2 GEOLOGY & EXPLORATION
CHAPTER 3 MINERAL PROCESSING
CHAPTER 4 MINING OPERATIONS
CHAPTER 5 SUISTAINABLE MINING
CHAPTER 6 PROGRESSIVE MINE CLOUSER PLAN
CHAPTER 7 FINANCIAL ASSURANCE
CHAPTER 8 REVIEW OF PREVIOUS PROPOSALS / IMPACT ASSESSMENT
PART B: ANNEXXURES
Add Row
1.3.1: Approval of earlier Mining Plan & Its Subsequent Review in Chronological Order
Period
Add Row
Add Row
Sl. No. Letter Number Date Supplementary Surrender Letter Supplementary Lease Deed Name of Transferor
Add Row
Toposheet Number:
Add Row
Add Row
Add Row
Chapter 2: GEOLOGY & EXPLORATION Next Previous
2.1: GEOLOGY
2.1.1: Topography
Terrain *
RELIEF
Highest Level (m) from MSL * Lowest Level (m) from MSL *
Drainage Pattern * Order of Stream * Minimum Distance of Stream from Lease Area (m) *
2.1.3.2: Structure *
2.1.3.3: Lithology, Petrographic & Mineralogical Description for Major, Associated & Indicator Minerals *
2.1.3.8: Deposit Type (as per MEMC Rule) Bedded Stratiform & tabular deposits of regular habit
Bedded Stratiform
N & tabular deposits of irregular habit
Strike / Trend of the Ore Body: * Amount of Dip of the Mineral Body (degree) * Float or Placer
NE deposits
TO E
SE
Undulating
Plateaux
RELIEF Hilly
Highest Level (m) from MSL * Lowest Level (m) from MSL *
Drainage Pattern * Order of Stream * Minimum Distance of Stream from Lease Area (m) *
Dendritic Order 1
Parallel Order 2
Trellis Order 3
RectangularOrder 4 & above
2.2: Exploration Radial
Annular
2.2.1: Summary of The Previous Exploration During Last Plan Period Others
Radiometric
Add Row
2.2.1.3: Ground Geophysical Survey Magnetic
Induced Polarization (IP)
Sl. No. Type of Survey Spacing (m) Total line (km) Area Covered (ha) Latitude Longitude Self-Potential (SP)
Gravity
Resistivity
Electromagnetic
Add Row
Rock-chip
Add Row
2.2.1.5: Pitting
Sl. No. Pit ID Length of Pit (m) Width of Pit (m) Depth of Pit (m) Litho Unit Exposed
Litho Unit From (m)
Litho Unit To (m)
Average Grade
Running
(%) Meters (m) Latitude Longitude
Add Row
2.2.1.6: TRENCHING
2.2.1.6.1: SPACING
Min (m) * Max (m) * Avg (m) *
0
Add Row
2.2.1.7: Drilling
Add Row
Add Row
Add Row
Add Row
Add Row
Surface Drilling
Add Row
Add Row
Underground Drilling
Add Row
Add Row
Add Row
Drive
Location Of
Sl. No. Type Drive id Size Of Drive (m x m) Length of Drive (m)
Drive Drives
X-Cuts
Raises
Winzes
Add Row
Decline
Incline
Adits
Shafts
Add Row
Add Row
Add Row
Sl. No. Rock Types Number of Samples Minerals Bulk Density Established (t/m³)
Add Row
Dip Of Mineral Average Strike Length Average Depth Max Grade Cut-off Provide Justification for
Sl. No. General Strike / Trend Body (m) Average Width (m) (m) Min Grade (%) (%) Avg Grade (%) Grade Defining Cut-off Grade Min Size (mm) Max Size (mm) E-W E
NE-SW W
NW-SE S
NE
SW
NW
SE
Add Row
2.2.3.1: Methodology
Resource / Reserve Estimation Method *
Methodology
2.2.3.2: RESERVE CALCULATION (PLAN AREA METHOD) 111 121 122 211
Add Row
2.2.4.8: Classification
Total 0 0
B. Remaining Resources
1. Feasibility Mineral Resource (B) 211 0
2. Prefeasibility Mineral Resource (B) 221 & 222 0
3. Measured Mineral Resource (B) 331 0
4. Indicated Mineral Resource (B) 332 0
5. Inferred Mineral Resource (B) 333 0
6. Reconnaissance Mineral Resource (B) 334 0
Add Row
Add Row
2.2.6.3: Pitting
Sl. No. Pit ID Length of Pit (m) Width of Pit (m) Depth of Pit (m) Litho Unit Exposed
Litho Unit From (m)
Litho Unit To (m)
Average Grade
Running
(%) Meters (m) Latitude Longitude
Add Row
2.2.6.4: TRENCHING
2.2.6.4.1: SPACING
Min (m) * Max (m) * Avg (m) *
0
Add Row
2.2.6.5: Drilling
2.2.6.5.1: Core Drilling
Spacing (m)
Number Of Type Of
Sl. No. Area Covered (ha) Min Max Avg Meterage (m) Latitude Longitude
Holes Hole
0
0
0
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Sl. No. Rock Types Number of Samples Minerals Bulk Density Established (t/m³)
Add Row
Chapter 3: MINERAL BENEFICIATION / PROCESSING Next Previous
Add Row
Add Row
Add Row
Add Row
Add Row
3.6: Tertiary Crushing Cone Crusher Roll Crusher Impact Crusher Hammer Mill
Sl. No. Type of Crusher Make Capacity of Crusher (tph) Feed Size (mm) Product Size (mm)
Add Row
3.8.1: Washing
Sl. No. Type of Washer Make Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l)
Add Row
3.8.2: Scrubbing
Sl. No. Type of Scrubber Make Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l) Sand (t) Slimes (t) Volumetric Flow rate of Slimes (t)
Add Row
3.9.1: Screening
Sr No. Type of Screen Number of Decks Aperture Size of Screen (mm) Capacity (tph) Feed Size (mm) Product Size (mm) Water Requirement (l) Fresh Water Requirement (l) Recirculated water(l) Oversize (mm) Undersize (mm)
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
4.3: Material Handling Summary
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
4.4.5.4: Supervision
In Position / Existing
Sl. No. Particulars Qualification Requirement / Proposed Strength (-) Shortage / (+) Excess Remarks
Add Row
4.5 Blasting Requirement
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
Add Row
5.2.1.6: Efforts Made towards Providing Hygiene & Sanitation to Local Communities
Number of Beneficiaries Number of Beneficiaries
5.2.1.10: Any Other Steps Taken for Improving the Socio-Economic Standard of Local Communities
Number of Beneficiaries Number of Beneficiaries
Number of Toilets Built inside the Lease Area: Number of Toilets Built outside the Lease Area: Expenditure(INR): Number of Beneficiaries
Year 1 Year 1
Year 2 Year 2
Year 3 Year 3
Year 4 Year 4
Year 5 Year 5
Chapter 7: FINANCIAL ASSURANCE (AREA PUT TO USE) Next Previous
Total 0 0 0
Grand Total
Chapter 9: IMPACT ASSESSMENT(for fresh grant) Next Previous
Date of Observation
9.3.3.2: Air Quality Details for Base line Information / Present Status
Free Free Rate of Rate of Heavy Heavy
SO2 SO2 NOX NOX CO RPM RPM Date of
CO Value Silica Silica Dust Fall Dust Fall Metals Metals
Sr. No. Station Name Season SPM Value (µg/m3) SPM Excess (µg/m3) RSPM Value (µg/m3) RSPM Excess (µg/m3) Value Excess Value Excess Excess Value Excess Observat Action
(µg/m3) Value Excess Value Excess Value Excess
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) ion
(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3)
Winter
Winter
Add Row
9.3.3.3: Impact Assessment & Mitigation Measures
9.3.5.2: Give Detail About Prediction of Noise Level by using Mathematical Modeling at Different Locations Identified *
Noise Standards *
Limits in dB(A)Leq
Area Code Category of Area
Day Time Night Time
A Industrial Area 75 70
B Commercial Area 65 55
C Residential Area 55 45
D Silence Area 50 40
Note: Industrial
1. Day time reckoned in between 6.00 am to 9.00p.m Commercial
2. Night time reckoned in between 9.00p.m.to 6:00am Residential
3. Silence zone is defined as areas up to 100 meter around such premises as Hospitals, Educational institutes and Courts. The Silence zones are to be declared by the competent Authority Silence Zone
4. Mixed categories of areas should be declared as "one of the four above mentioned categories" by the Competent Authority and the corresponding standards shall be applied.
Excess Date of
Sl. No. Station Name Season Type of Area Noise At Day Time: Excess Noise At Day Noise At Night Time: Noise at Observat Action
Night ion
Add Row
9.3.6: VIBRATION
Date of
Distance from the Peak Particle Velocity
Sl. No. Station Name Season Air Over Pressure (DB) Frequency (Hz) Observat
Blasting Site (m) (mm/s)
ion
Add Row
9.3.7.6: Historically, Culturally & Ecologically Important Places in Core & Buffer Zone
8.1: General
8.1.1: LEASE AREA UTILISATION
Area at the Actual Area utilized
Type of land use Area proposed Reasons for
Sl. No. beginning of the in the proposal Deviation
(in ha) under activity deviation
proposal period period
1 Mining
2 Mineral storage
Mineral
Beneficiation
3 plant
4 Township
5 Tailing Pond
6 Railways
7 Roads
Infrastructure
(Workshop,
administrative
8 building etc.)
9 OB/waste dump
Top soil
10 preservation
11 Others
Total area put to
12 use
Excavated area
13 reclaimed
Waste dump area
14 reclaimed
15 Undisturbed Area
Total
1 Lease Cadastral Plan (scanned image) The Scanned copy shall be of the original lease map issued by State Government along with other details
The Plan should be submitted showing different color codes for:(1) Active Pits & Excavation area(2) Excavated area reclaimed &
rehabilitated (3)Active dumps (4) Stabilized & rehabilitated dump area , (5) Green belt (6) Mineral Stacks (7) Utilities such as
2 Surface cum Reclamation and Rehabilitaion Plan(.KML /.KMZ/.SHP format) plant, buildings etc (8) Lease boundary
The Plan should be submitted showing different color codes for : (1) Lithological/Geological Occurance (2) Area under G1,G2,G3
3 Surface Geological Plan of the lease (.KML /.KMZ/.SHP format) & G4 (3) Active pits & Excavation area (4) Dump Area (5) Mineral Stacks (6) Lease boundary
4 Surface Geological sections (in Pdf format) Yearwise geological sections with different color coding depicting all the features shown in Surface Geological Plan.
The Plan should be submitted showing different color coding for: (1) Active Pit and Excavation area , (2) Year wise excavation
proposal for year I to V ( (3) Active dump and yearwise dump proposal for year I to V (4) Year wise Dump working proposal for
5 Five year Production and Development plan(.KML /.KMZ/.SHP format) year I to V (6) Lease boundary (with reference to chapter 4)
Year wise excavation and dumping proposals with different color coding depicting all the features as shown in the Five year
6 Five year Production and Development sections(in pdf format) Production and development plan.
The Plan should be submitted showing different color coding for : (1) Yearwise excavated area Reclaimed & rehabilitated for
year I to V (2) Year wise dump area to be stabilized and dump area to be rehabilitatd for year I to V (3) Year wise Green area
proposed from year I to V.(4) Any other reclamation and rehabilitation measures proposed.(5) Lease boundary ( with reference
7 Progressive Mine Clouser Plan (.KML /.KMZ/.SHP format) to chapter 6)
Year wise Progressive mine clouser sections showing all the yearwise reclamation, rehabilitaion proposals as depicted in the
8 Progressive mine Clouser sections(in pdf format) Progessive mine clouser plan.
The Plan should depict the staus of lease area as envisaged at the end of life of Mine. Status of land use shall be depicted by
9 Conceptual Plan and section different color coding.