1 2 3 4 5 6 7 8

N 2
SHOP MATERIALS
E 236421
N 65712
PT COMMODITY NPD
EL +400358 NO DESCRIPTION (MM) QTY

S6 1 Pipe, PE, ASTM A312-TP316L Seamless, ASME B36.19M S-40S 50 4863 MM

26 2 Elbow, 90 deg, SW, ASTM A182-F316L, ASME B16.11 CL3000 50 3


9
56 3 Flange, Socketweld, RF, ASTM A182-F316L, ASME B16.5 50 1
0 CL150 x ASME B36.19M S-40S bore
4 Valve, Ball, SW, CL600, LH, Valve Specification BACE13 50 1

1 PIPE SUPPORTS
A

S7 5 BA30A 50 1

S5 2 6 RG45 50 1
E 236421
N 65152 7 PS17 50 1
EL +400358
FIELD MATERIALS

PT COMMODITY NPD
NO DESCRIPTION (MM) QTY

8 High Temperature (>150 deg C) Insulating Gasket Kit, 50 1


Complete with Gasket, Sleeves and Washers, 0.175" THK

1
Gasket for ASME B16.5 CL 150
9 Stud Bolt, 11 UNC, ASTM A193-B7 continuous thread W/ 2 5/8 4
ASTM A194-2H Heavy Hex Nuts Per Stud - 100 mm Length

1830
2206

50NPD
1
HOLD
C

CONN TO
20GMA10AP001/OUTLET F3 G8 B9 4
2 in RFFE 150 STEM NORTH TO BE INSERTED INSIDE
E 236421 20GMA10AA401 OPEN END OF THE
N 66090 IMPLENIA CONNECTION.
EL +397915 SEE IMPLENIA KS-50
1
97
50
1

NP
D
37
140

4
2
E 236421
N 65712
EL +397915

GENERAL NOTES: D
1. CONTRACTOR TO FIELD VERIFY ISOMETRIC DIMENSIONS, IN LINE COMPONENT/VALVE
DIMENSIONS, AND EQUIPMENT NOZZLE LOCATIONS PRIOR TO PIPE FABRICATION.

2. CONTRACTOR TO DETERMNE FIELD WELD LOCATIONS TO DETERMINE BEST METHOD


FOR PIPE INSTALLATION.

3. 304L SS MATERIALS MAY BE SUBSTITUTED FOR ANY 316L SS MATERIALS LISTED IN

2022-12-28 09:30:47
THE ABOVE BILL OF MATERIALS. SEE APPLICABLE PIPING SPECIFICATION DATASHEET
FOR DETAILS.

THIS DRAWING WAS PREPARED BY POWER INTER-DISCIPLINE REVIEW DESIGN CODE: GE POWER, GAS POWER SYSTEM JOB NUMBER REV

EXTRACTION DATE :
ENGINEERS, INC. FOR A SPECIFIC PROJECT,
B31.1 8 x TM2500 SWISS TEMPORARY 181027
TAKING INTO CONSIDERATION THE SPECIFIC DISC MECH I&C 2
1
AND UNIQUE REQUIREMENTS OF THE PROJECT. 2 ISSUED FOR CONSTRUCTION 30-DEC-2022 MRS JW TK PIPE CLASS: RESERVE POWER PLANT BIRR
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE 1 ISSUED FOR CONSTRUCTION 23-NOV-2022
30-DEC-2022 MRS JW TK CHX DRAWING NUMBER
CONTAINED IN THIS DRAWING FOR ANY PURPOSE PIPING ISOMETRIC
IS PROHIBITED UNLESS WRITTEN PERMISSION 0 ISSUED FOR CONSTRUCTION 11-NOV-2022 MRS
23-NOV-2022 RM JW TK P&ID NUMBER: M7-20GMA10BR416
FROM BOTH POWER AND POWER'S CLIENT IS
INIT WASTE WATER
GRANTED. REV REVISIONS DATE DSGN CKD APPD LINE NUMBER M3-6-1 SHEET: 1 OF 1