WD TW (5) FN 17 (D) Reflected Ceiling Layouts - r1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

L&T Realty

PHASE 3A-POWAI

EQ
EQ EQ EQ EQ EQ EQ

EQ
EQ

695
EQ
120
EQ
REFLECTED CEILING LAYOUTS WD-TW(5)-FN-17(D)

EQ
EQ
EQ EQ

EQ EQ

EQ
EQ EQ

EQ

225
EQ EQ

EQ

1525
ALIGN

600
CENTER
GOOD FOR CONSTRUCTION
EQ

450

225
EQ

225
EQ

600
SUBJECT TO APPROVAL FROM STATUTORY APPROVAL

EQ
225

120

EQ
GENERAL NOTES

EQ
EQ EQ

448 (X)
225
EQ EQ • THIS DRAWING SHALL BE REFERRED FOR ARCHITECTURAL

280

448 (X)
EQ
120

EQ
DESIGN

2125
BAL.
600
EQ
225 • ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE

EQ
EQ
EQ EQ EQ IN METERS, UNLESS OTHERWISE MENTIONED
EQ

EQ
600

600
120
EQ EQ • REFERENCE SHALL BE MADE TO RELEVANT STRUCTURAL,
450 BAL. 450 EQ EQ ELECTRICAL, SANITARY AND MECHANICAL
EQ EQ DRAWINGS/DETAILS PREPARED FOR THE RESPECTIVE
PURPOSE BY THE CONSULTANTS

EQ

600
EQ
1870

EQ

EQ
170 • ANY DISCREPANCY/ DOUBT REGARDING DESIGN/DIMENSIONS

EQ
120 ALIGN SHALL BE REFERRED TO CONSULTANTS BEFORE
CONSTRUCTION

EQ
CENTER

EQ
EQ

120
120 EQ EQ

EQ

448 (X)
EQ EQ
1525 2175 • THIS DRAWING SHALL NOT BE SCALED WRITTEN DIMENSIONS
TO BE FOLLOWED
120

120
180
230
EQ EQ
• SIZES OF ALL OPENINGS/CUTOUTS ARE BETWEEN/UPTO

BAL.
EQ

BAL.

600
UNFINISHED SURFACES ONLY AND SHOULD BE REFERRED

600
EQ EQ FROM RELEVANT ARCH. / STRUCTURAL DRAWINGS

EQ
120
120
EQ

280

600

EQ
600
• SIZES OF COLUMNS FOR THE CENTER LINE PLAN HAVE BEEN
BAL.
600
225 450 BAL. 450 TAKEN FROM BASEMENT 3 LEVEL
450 BAL. 450
EQ
EQ

120
• SIZES OF LIFT OPENING AND SECTIONAL HEIGHTS SHALL BE
EQ

EQ

EQ
AS PER MANUFACTURER'S SPECIFICATIONS

EQ
600

450 BAL. 450 • COS = CHECK ON SITE

EQ
EQ

EQ
• C/F : COLUMN FACE
EQ EQ
EQ

EQ EQ 1060 460 • REFER SEPERATE DRAWING FOR SETTING OUT PLAN


EQ

120 • FOR REFERENCE OF FIN. GEN. ROAD LVL. REFER LAYOUT/

EQ
EQ

EQ
RELEVANT SECTIONS
EQ

120
1755 2355 • ALL THE OPEN SPACES ARE TO BE CHECKED BY THE LIASION
ARCHITECT BEFORE COMMENCING THE EXECUTION WORK
ON SITE

525 • WORK ON SITE SHALL COMMENCE ONLY AFTER THE


APPROVAL IS OBTAINED FROM THE STATUTORY AUTHORITIES

FALSE CEILING PLAN - UNITS 1 & 2 (2BHK) (ON FLOORS 1-4, 6-11, 13-18 & 20-25) FALSE CEILING PLAN - UNITS 3, 5, 8 & 9 (ON FLOORS 1-25) FALSE CEILING PLAN - UNITS 4, 6, 7 & 10 (ON FLOORS 1-25)
1 SCALE = 1 : 50
2 SCALE = 1 : 50
3 SCALE = 1 : 50

LEGEND
KEY PLAN
LED DOWNLIGHT

CEILING FAN

CHANDELIER LIGHT

12MM THK. WALL MOUNTED LIGHT R1 31.10.2023 DRAWINGS CHANGED AS REQUESTED; PELMETS UPDATED IN UNITS
4, 6, 7 & 10 PLAN
SK PD
12MM THK. GYPSUM
GYPSUM BOARD
BOARD PELMET
PELMET R: DATE DESCRIPTION DRAWN APPROVED
18MM THK. PLY AIR CONDITIONER PROJECT : L&T Powai PH3 SCALE :
As indicated
10MM G.I. SECTION
TOWER 5
25MM X 25MM
FRAMING FOR T.W. FRAMING GAS LEAK/HEAT DETECTOR DATE 31.10.2023
GYPSUM BOARD 225 TITLE
PELMET
SPRINKLER ON VERTICAL REFLECTED CEILING
PROJ. NO : ---
75

SURFACE LAYOUTS
120

GYPSUM BOARD PELMETS DRAWN CHECKED APPROVED DWG. NO REV SUFF


SK VS PD WD-TW(5)-FN-17(D) R1

ACRYLIC CEILING IN CLIENTS


TYPICAL PELMET DETAIL TYPICAL PELMET DETAIL FOR AC IDU TOILETS (@2.2M HT. FROM
SCALE = 1 : 10 SCALE = 1 : 10 FFL OF ADJACENT ROOM)
L&T Realty
L&T Asian Realty project LLP
L&T Business Park, tower A,
METAL GRID CEILING IN Gate No. 5, Saki Vihar Road,
Powai, Mumbai, 400072
TOILETS (@2.2M HT. FROM
FFL OF ADJACENT ROOM) MEP CONSULTANT
WOOD-EFFECT FALSE
CEILING IN BALCONIES Address: Pride Parmar Galaxy 10/10+A
7th Floor, Sadhu Vaswani Chowk
(@2.4M HT. FROM FFL Pune - 411001
Tel :+91 22 2778 0373, +91 22 2778 0370
OF ADJACENT ROOM) email : [email protected]

STRUCTURAL CONSULTANT
EPICONS CONSULTANTS PVT. LTD

Address: 216 A, Amargyan Complex,


L. B. S. Road,
Khopat,
Thane (W) 400 601
Tel : 26826225 / 26826215
email : [email protected]

Tower 5 ATUL DESAI CONSULTANTS

N
PLANNERS HOUSE OF PATELS, 4TH FLOOR
ARCHITECTS PLOT NO48, 18TH ROAD, OFF NORTH
INTERIOR DESIGNERS AVENUE,
ENVIRONMENTALISTS SANTACRUZ [W], MUMBAI - 400054.
INDUSTRIAL CONSLTANTS TEL: 26042911 , 26043267 FAX: 26042906
email: [email protected]

You might also like