Volume 1
Volume 1
Volume 1
1060/2 ط:
تطوير وصلة األصايل- تحسينات محور الشيخ راشد
PROJECT: R1060/2
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT
OF AL ASAYEL LINK
TENDER DOCUMENTS
Volume 1
EMPLOYER: CONSULTANT:
PROJECT R1060/2:
IMPROVEMENT OF SHEIKH RASHED –
DEVELOPMENT OF AL ASAYEL LINK
GENERAL INDEX
VOLUME 2 - SPECIFICATIONS
• PART II - DM SPECIFICATIONS
Volume 4 - DRAWINGS
PROJECT R1060/2:
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT OF
AL ASAYEL LINK
VOLUME 1
CONTENTS
J RTA Corporate Safety Policy and Circulars for Quality, Health, J/1
Safety and Environment (QHSE) on Roads Projects
PROJECT R1060/2:
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT OF
AL ASAYEL LINK
Project Scope:
The improvement of Sheikh Rashid Road and the development of the Al Asayel link will provide
strategic connectivity to reduce traffic congestion on the major roadway network that includes Al
Asayel Street (D72), Oud Metha Road (E66), Al Khail Road (E44).
This initiative aims to optimize traffic flow on major roadway networks by upgrading road
capacity to accommodate growing volumes of vehicles and implementing strategic connectivity
of Al Asayel Street (D72) with Al Khail Road (E44) road towards Business Bay crossing and
Oud Metha Road (E66) towards Wafi interchange for efficient traffic management. Additionally,
the construction of the Al Asayel link will provide a key connection between Al Asayel Street to
both Al Khail Road and Oud Metha Road, offering motorists alternate routes and easing
congestion on existing roadways in addition to extra mitigation along Oud Metha road and Al
Khail to increase its capacity and solve the existing issues which will lead to ease of Traffic
movement on these strategic corridors.
Tenderers are required to comply with the following instructions, failure to comply with
these instructions may lead to rejection of the Tender.
1. General
3. Indemnity to Employer
The Tenderer and any of his employees or agents will be granted permission by
the Employer to enter the Employer’s premises and lands for the purpose of
inspection in connection with the proposed Tender, but only on the condition that
the Tenderer will release and indemnify the Employer and his servants and agents
from and against all liability in respect of personal injury, loss of or damage to
property and any other loss, damage, cost and expense however caused which,
but for the exercise of such permission, would not have arisen.
Page A/1
4. Doubt and Obscurities
Should there be any doubt or obscurity in the meaning of any of the Tender
Documents or as to anything to be done or not to be done or as to any other
matter or thing, the Tenderer must set forth such doubt or obscurity in writing and
submit the same to the Engineer not later than *__ days before the Closing
Date of the Tender. The replies to written queries, the explanations and
clarifications given and copies of documents or drawings shown at meetings will
be distributed as Notices to Tenderers to all Tenderers not later than * days
before the Closing Date of the Tender. No instruction, clarification or other
information given verbally by the Engineer or any of his assistants at any meeting
or discussions held in terms of this clause shall be binding or taken into account in
preparing and evaluating Tenders unless and until such instruction, clarification or
information is confirmed in writing by the Engineer to all Tenderers. In no case will
any procedure in connection with clarification and interpretation of Tender
Documents give the right to Tenderers to claim an extension to the Closing Date
of the Tender.
5. Quantities
6. Pricing
All items in the Tender Documents are to be priced and extended in ink. Any
alteration must be initialed by the person signing the Tender.
The rates and prices set down by the Tenderer against the items in the Tender
Documents are to be for the full inclusive value of the Works and shall include for
profit and all obligations and liabilities of every kind arising under the Contract. If
any items are left unpriced, it shall be deemed that the cost of the work described
thereunder is allowed elsewhere in the documents. The Tenderer may not make
any alterations to the Bill of Quantities.
Tenderer must complete all Daywork Schedules and Price Analysis Schedules
provided in this Tender Documents and submit together with their Tender.
Non-compliance to this may result in rejection of the Tender.
7. Fixed Price
Tenderers are to note that in accordance with Sub-Clause 4.11 of the Conditions
of Contract, the Accepted Contract Amount shall cover all the Contractor’s
obligations under the Contract (including those under Provisional Sums, if any)
and all things necessary for the proper execution and completion of the Works
and the remedying of any defects.
Page A/2
In accordance with Sub-Clause 13.7 and 13.8 of the Conditions of Contract, the
Contractor shall have no entitlement to a change in the Contract Price due to
changes in costs or Legislation.
8. Qualification
The Tender must be submitted in compliance with the Tender Documents and
shall be free of any qualifications. Should the Tenderer wish to submit an
alternative offer to the Employer for consideration, such offer must be additional to
and completely separate from this Tender.
9. Alternative Tenders
10 Expenses of Tender
The Employer will not be responsible for, nor pay any expense which may be
incurred by any Tenderer in the preparation and submission of his Tender.
All documents issued and information given to the Tenderer shall be treated as
confidential.
12. Currency
13. Language
During the period of tendering all correspondence with the Engineer shall be in the
English language.
The Tenderer shall submit the complete set of the Tender Documents together
with two copies (excluding drawings) each shall be clearly marked "COPY". In the
event of any discrepancy the information entered in the original shall take
precedence.
Page A/3
The Tenderer shall complete and comply with all parts of the Tender Documents
and shall sign and date the documents in the spaces provided.
The Tender is to be completed in English, except for the Letter of Tender and
Appendix to Tender which are to be completed in both Arabic and English.
Every page of the "original" shall be completed with the company seal and initialed
by the person signing the Tender. The Employer reserves the right to instruct the
successful Tenderer to stamp and initial every page of the Tender copies prior to
the formal award of the Contract.
The Tender must be signed by the principal of the company whose name appears
on the company’s trade licence or professional licence and the registered name
and address of the Tenderer must be printed in block capitals in the space
provided. Provided that the Tenderer should attach also an approved specimen
signature issued by the relevant UAE authority.
The Tenderers are required to submit the following documents as part of the
technical submission of the Tender:
a) A confirmation that they have inspected the Site physically and have
assessed the risks likely to be encountered during the Works;
b) A comprehensive project specific work plan;
c) A comprehensive detour plan to meet the contractual obligation of causing
minimal disruption to traffic;
d) A programme, in bar chart or network form, showing the sequence of
construction and completion date/s for the Works or parts thereof;
e) A chart showing the proposed site staff and management organization for
the work, and the numbers of supervisors and labourers including those to
be employed by the Subcontractors;
f) List of Contractor’s Equipment with number, types and capacities;
g) Record of completed projects related to roads, bridges, or marine works;
h) A list of proposed Subcontractors and Suppliers including local firms, with
particulars of the work which will be undertaken by them;
i) List of proposed sources of Materials;
j) Proposed location of borrow pit / disposal tip; and
k) Any other documentation to clarify the Tender submission.
The Tender must be accompanied by a Tender Bond to the value as stated in the
Letter of Invitation and be as per the Specimen Form as provided in the Tender
Documents. The Tender Bond must be issued by a bank licensed by the Central
Bank of the UAE. The Tender Bond shall be valid for 120 days from the Closing
Date of this Tender and be automatically renewable before its expiry for further
periods each of them equal 30 days until such time as the RTA confirms in writing
that the Tender Bond is no longer required. Any offer which does not include a
compliant Tender Bond may be rejected immediately.
Page A/4
16. Delivery of Tender
The Tender shall be submitted in plain envelopes or packages with all joints
properly sealed with red wax, without any indication of the identity of the Tenderer
and shall be addressed to:
Tender No. *
Project. *
The rates and prices contained in the Tender will be examined by the Engineer
and Employer prior to issuing the Letter of Acceptance in order to ascertain that
the items are extended correctly at the rates quoted. Generally, should any error
be found, the rate will remain unaltered and the extended amount will be
corrected. The total amount of the Tender shall be amended accordingly. Any
amendments considered by the Employer or the Engineer shall be clarified with
the Tenderer.
Failure by the Employer or the Engineer to discover any error during the checking
of the tender shall not entitle the successful tenderer (or any other tenderer) to
make a claim for payment against the error if it is subsequently discovered.
18. Acceptance
The Employer does not bind himself to accept the lowest or any Tender and will
not state a reason for the acceptance or rejection of a Tender.
Page A/5
19. Return of Tender Bond
After the Contract has been awarded, the Tender Bonds will be returned by the
Employer to the unsuccessful Tenderers, provided that the Bond has not been
forfeited. The successful Tenderer shall extend the validity of the Tender Bond
until he provides the Performance Security in accordance with Sub-clause 4.2 of
the Conditions of Contract, at which time the Tender Bond will be returned.
The Tenderer shall state in his Tender the address in Dubai to which all
correspondence concerning his Tender shall be addressed.
Other than as described in Clause 6 above, no alteration, other than filling in all
the blanks intended to be filled in, shall be made in any of the documents issued.
If any alteration is made and if these instructions are not fully complied with, the
Tender may be rejected.
The Tenderers attention is drawn to the fact that if the Tender is not completed
and submitted as stated in these instructions to Tenderers the Employer reserves
the right to confiscate the Tender Bond in whole or in part as the circumstances
warrant.
23. Engineer
The term Supervising Engineer (S.E.), or Architect, where these are used, shall be
regarded as an Engineer’s assistant referred to in Sub-clause 3.2 of the
Conditions of Contract.
Page A/6
27. Conditions of Contract
The General Conditions of Contract shall be the Roads and Transport Authority
Conditions of Contract, November 2015. A copy of which is available on request
from the Contracts and Purchasing Department of the Roads and Transport
Authority.
The Tenderer is notified that the successful Tenderer shall be required to provide
a Performance Security in accordance with Sub-Clause 4.2 of the Conditions of
Contract.
The Tender is notified that the successful Tenderer shall be required to comply
with the insurance requirements in accordance with Clause 18 of the Conditions of
Contract.
The adjustment item, if any in the Tender summary, shall apply to all items of
Work, excluding Provisional Sum unless clearly indicated otherwise. The
adjustment item shall not be a lump-sum, but a percentage of the total tendered
sum excluding Provisional Sum or a percentage of the totals for the items
indicated. The adjustment item shall be applied to all applicable item rates, sums
and Dayworks including any addenda. The adjusted rates and sums shall be used
in accordance with Clause 12 of the Conditions of Contract to evaluate the
Works as necessary.
Page A/7
B) Conditions of Contract
ROADS AND TRANSPORT AUTHORITY
CONDITIONS OF CONTRACT
The General conditions of the Contract shall be the Roads and Transport Authority
Conditions of Contract November 2015 applicable to this project is not attached with
the document and is available in the Engineers office for perusal by Tenderers during
normal office hours with prior appointment.
B/1
ROADS AND TRANSPORT AUTHORITY
‘Joint Venture Agreement should define the scope of work/responsibility for each of the
companies and also it should define the plan of action to complete the project in case the
Joint venture Agreement fails halfway.
Also, the Employer may seek a parent company guarantee from the JV partner who is not
registered individually with RTA.’
Delete the entire text in “Sub- Clause-8.5” and replace with the following:
a) The Contractor has diligently followed the procedures laid down by the relevant
legally constituted public authorities in the Country,
b) these authorities delay or disrupt the Contractor’s works, and
c) the delay or disruption was Unforeseeable,
Then this delay or disruption will be considered as a cause of delay under subparagraph
(b) of Sub-Clause 8.4 (Extension of Time for Completion). However, the Contractor shall
have no entitlement to any adjustment to Contract Price as a result of any delays caused
by Authorities.
Delete the entire text in “Sub- Clause-11.1 (a) and substitute with the following:
Complete any work or snags, which is outstanding on the date stated in the Taking-Over
Certificate within a maximum period of three months after such date, and
Sub Clause 12.6 Re-Rating of BOQ rates identified as ‘high rate items’
Notwithstanding sub clause 12.5 ‘Adjustment to Contract Price’, an adjustment to all those
rates shall be applicable which are identified to be ‘high rate items’ in the Contract. Any
rate shall be considered ‘high rate’; if it is more than 25% higher than the ‘Average Rate’.
b) In case the number of participating tenderers are three and the rate for these
tenderers is A. B & C. Assuming ‘A’ as the rate of the tenderer whom the contract
has been awarded.
Average Rate = (1.5B+ 1.5C)/3
c) In case the number of participating tenderers are two and the rate for these
tenderers is A. & B. Assuming ‘A’ as the rate of the tenderer whom the contract has
been awarded
Average Rate = (A+2B)/3
d) In case the number of participating tenderer is one only, then ‘high rates’ shall be
considered those rates which are more than 25% higher than the rate mentioned in
the Engineer’s Estimate submitted to RTA prior to tender opening. For these items,
‘Average Rate’ shall be equal to Engineer’s estimate and these ‘Average Rates’
shall be recorded in the Contract document.
ii. The rates in BOQ part 1 – General items shall not be a subject of this sub-
clause.
(e) The process of consultation between the Contractor and the Engineer for agreement of
variations or for any new rates (resulting from the re-measurement) shall not exceed a
period of 4 weeks. In case no agreement is reached within 4 weeks, the Engineer shall
proceed to consult with the Employer and thereafter shall fix the rates pursuant to Clause
12.3.
(f) The Contractor shall submit any proposed rate for the variation (or new rate due to
omission of the relevant item in the Bill of Quantities) in a timely manner as soon its
necessity is realized. Any variation or the new rate item shall be included in the payment
certificate only upon the consultation process with the Employer is completed and the
Engineer has determined the variation or the new rate pursuant to this clause. On-
account rates shall not be allowed in the payment certificate.
B/3
ROADS AND TRANSPORT AUTHORITY
B/4
ROADS AND TRANSPORT AUTHORITY
‘(c) any amount to be deducted for retention, calculated by applying the percentage of
retention stated in the Appendix to Tender to the total of the amount assessed under item
(a), (b) and (e) of this Sub-clause, until the amount so retained by the Employer reaches
the limit of Retention Money (if any) stated in the Appendix to Tender;
Replace the penultimate paragraph of this Sub-clause with the following text:
‘The additional amount to be certified shall be the equivalent of ninety percent of the
Engineer’s determination of the cost of the Plant and Materials (including delivery to Site),
taking account of the documents mentioned in this Sub-clause and of the contract value
of the Plant and Material.’
This proportion shall be fifty percent (50%) of the proportion calculated by dividing the
estimated contract value of the Section or part, by the estimated final Contract Price.
New Sub Clause (d) to Clause 14.10 – Statement at Completion added to Part 2-
Conditions of Particular Application along with new Appendix L to Volume 1-Tender
and Contract Conditions as follows;
‘The additional cost of demolition and professional fee etc. shall be considered as 15% of
the Accepted Contract Amount.’
B/5
ROADS AND TRANSPORT AUTHORITY
All notices to be given to the Engineer with the copy marked to the Employer under the
terms of the Contract shall be served by delivering the same to:
Tel: 04-2905511
Fax: 04-2905550
Fax: 04-2904690
Fax: 04-2903370
Tel: 04-4391000
Fax: 04-4391001
Add new Clause 21 heading ‘Penalty for Delay in Snags and Non-Reconciliation of
Service Authorities Work’. Add new Sub-Clauses 21.1 and 21.2 as follows:
Sub- Clause-21.1 Penalty for Delay due to failure to complete the snags upon
issuance of TOC
Notwithstanding Sub Clause 8.7, if the Contractor fails to complete and outstanding works
or snags within three months after date stated in the Taking-Over Certificate for whole of
the works, an amount of Dhs. 10,000.00 per day and Maximum up to 5% of Contract
value will be calculated starting from 1st day after the expiry of three months of the date
stated in the Taking-Over certificate whole of the works and shall be deducted from the
Contractor’s due payments. The verification of completion status of outstanding works
and snags shall be through the snag completion certificate issued by the Engineer.
B/6
ROADS AND TRANSPORT AUTHORITY
Sub- Clause-21.2 Penalty for Delay due to non- reconciliation of Service Authority
Works
Neither Sub Clause 11.9, Performance Certificate nor Sub Clause 14.9, Second Half of
Retention (outstanding balance of Retention) shall be implemented until the Contractor
obtains the clearance certificates from the respective service authorities in respect of the
final Cost of betterment and diversion works and quantities reconciliation for Service
Authority Works.
B/7
C) Letter of Tender and
Appendix to Tender
LETTER of TENDER خطاب العطاء
1. Having examined the Instructions to Tenderers, ددل دد بع ددم انع ددظر في ا ددل م ددا فيجعة إ ددظل فيإصين ددر اي د فيإ ظ.1
Conditions of Contract, the Specifications, the
Drawings, the Schedules and any other فيعقم نجطةبظل صظحب فيعإل فيجمف ل فيإجعةقر بج ف ذ أعإدظل فيإردل
documents forming part of the Contract for the أنندظه ف ف دذ انجدظه ادذه ف عإدظل نعلض نح فيإدص ع. فيإذكصر أعاله
execution of the above named works, we, the
فيعقددم نجطةبددظل صددظحب فيعإددل اصددالأ أع ع ددصه م نددظ شبقددظ يرددل
undersigned, offer to execute and complete such
works and remedy any defects therein in فيج ددمف ل فل في ددةر م ددا نقظب ددل نبة د نق ددمفره ب ددمرفاإل فرن ددظرفل فيعل ددر
conformity with the said Contract as follows: for .فيإجحمة
the sum of U.A.E. Dirhams.
(_____________________________________ _______________________ (
_____________________________________) .______________________________ ) نراإل
2. We acknowledge receipt of the following ان ظ نقل فسجالن ظ فر عظرفل فيجظي ر في دظنرة ند صدظحب فيعإدل ايد.2
Notices to Tenderers issued by the Employer:
: فيإ ظ
Reference No. Date of فظريخ ر إل ا ظرة
of Notice Notice
فر عظر فر عظر
_____________ ___________ ___________ _____________
_____________ ___________ ___________ _____________
_____________ ___________ ___________ _____________
_____________ ___________ ___________ _____________
3. We acknowledge that the Appendix to Tender نقل بأر فيإةحق يركل يزء ف ن عطظئ ظ.3
forms part of our Tender.
4. We undertake, if our Tender is accepted, to بإبظ لة ف عإظل مص فر بعم, ما حظل بصل عطظئ ظ, نجعنم.4
commence the works immediately after the
Commencement Date. فسجالن ظ ا عظر فيإبظ لة في ظنر ع فيإن مس
C-1
5. We undertake, if our Tender is accepted, to بإنجظه فسة إل يإ ع ف عإظل فيجا, ما حظل بصل عطظئ ظ,نجعنم .5
complete and deliver the whole of the Works
within the Time for Completion stated in the .يرجإل عة نظ فيعقم خالل فيإمة فيإحمنة ما نةحق فيعطظء
Appendix to Tender.
6. The Time for Completion includes all Fridays, , فيخ.. ف مرج ضإ فيإمن فيإذكصرة كل أيظم فيجإع فيعطل فيلسإ ر.6
Public Holidays etc., and other non-working days
caused by inclement weather etc., and shortened , فيدخ.. ) أيظم عطدل أخدلن نظفجدر عد رنفءة فيطقدأل ( ف حدصفل فيجصيدر
working hours during the Holy Month of Ramadan. كذيك سظعظل فيم فم فيإخفضر خالل نل رنضظر فيإبظرك
7. We agree to abide by this Tender for 150 days ) يصندظ فعجبددظ فر ند في ددصم150( نصفمدق عةد أر نةجدزم بعطظئ ددظ ادذف نددمة.7
from the specified Tender submission date, which
may be extended by Roads and Transport يصنددظ أخددلن س د ال30 ف خ ددل فيإحددمن يجقددميإل فيعطددظء ظبةددر يةجإميددم يإددمة
Authority for a further 30 days and it shall remain بدل به ش ةر ادذه فيفجدلة يإكد أر فقبدل فيعطدظءفل مدا أع د نةجزن
binding upon us and may be accepted at any time
. يصنظ أ أع فإميم ينظ150 فنجنظء نمة
before the expiry of the 150 days or any extension
thereof.
8. If our Tender is accepted we will when required, ما حظل بصل عطظئ ظ ع م فيطةدب نةجدزم بظيح دصل عةد كفظيدر ب در.8
obtain the guarantee of a reputable and
established Bank registered in the UAE (to be ن أحم فيب صك فيإعجإمة فل فيسإعر فيحس ر فيعظنةر مدا ن يدر فرندظرفل
approved by you) to be jointly and severally bound ددبة إل) فر يكددصر فيب ددك نةجزنددظ نع ددظ فيعل ددر فيإجحددمة (يددجإل فعجإظناددظ ن د
with us in the sum equal to the percentage of the
إدر فيعقدم فيإحدمنة فالنفدلفن بإبةد يسدظ ع في سدبر فيإ صيدر ند بظيجضظن
Contract as defined in the Sub-clause 4.2 of the
Conditions of Contract and in the Appendix to يك ضإظنظ يحس ما نةحق فيعطظء فيعقم ل ن4.2 ما فيإظنة
Tender for the proper performance of the .ف ف ذ فيعقم
Contract.
9. If our Tender is accepted we shall obtain the فيجأن ظل بظيح صل عة, ما حظل بصل عطظئ ظ, س قصم .9
insurances as required by the Contract before
commencing the Works. .ر بل نبظ لة ف عإظل فيإطةص ر ما فيإ ظ
10. Unless and until a formal agreement is نظ يإل في أر يجإل اعمفن فالففظ ر فيلسإ ر مإر اذف فيعطظء خطظه.10
prepared and executed, this Tender together with
the Employer's Letter of Acceptance shall .فيقبصل في ظنر ن صظحب فيعإل يإثالر عقمف نةزنظ نبلنظ ب ظ
constitute a binding contract between us.
11. We understand that you are not bound to بقبصل أ ل فيعطدظءفل سدع فل أ أع ان ظ عة عةإل بأن إل غ ل نةزن.11
accept the lowest or any Tender you may receive.
.عطظء آخل
حلر ما في صم _________________ ن
Dated this ___________________ day of
2024 _______________ نل
_________________ 2024
_____________________فسإل نقمم فيعطظء
Name of Tenderer _______________________
C-2
Roads and Transport Authority
General Conditions of Contract – November 2015
Appendix to Tender
Item Sub-Clause Entry
Time for access to the Site 2.1 In line with the Contractor’s Program
C-3
Roads and Transport Authority
General Conditions of Contract – November 2015
Limit of Retention Money 14.3 (c) 10% of the final Contract Price
Maximum amount of
deductibles for insurance of the 18.2 (d) Nil
Employer’s risks
Minimum amount of third party AED 2 Million per occurrence with the number
18.3
insurance of occurrence unlimited.
C-4
Roads and Transport Authority
General Conditions of Contract – November 2015
C-5
D) Form of Agreement
FORM OF AGREEMENT :نموذج االتفاقيه
THIS AGREEMENT made the _______ حررت هذه االتفاقية في اليوم ـــــ من شهر
day of 2024
BETWEEN , بين.م2024
D1
تعتبر الوثائق التالية وتقرأ وتفسر على أنها.3
3. The following documents shall be :جزء من هذه االتفاقية وهي
deemed to form and be read and
construed as part of this Agreement, . المناقصة والملحق المذكوران.أ
namely :
(a) The said Tender and Appendix . المخططات.ب
(b) The Drawings. . شروط العقد الجزء األول والثاني.ج
(c) The Conditions of Contract (Parts I
. المواصفات.د
and II)
(d) The Specification
. جداول األسعار/ جداول الكميات.ه
(e) The Bills of Quantities /Schedules of . خطاب القبول.و
Rates. . التعليمات إلى المناقصين.ز
(f) The letter of Acceptance
قواعد هيئة الطرق و المواصالت للتحكيم و.ح
(g) The Instructions to Tenderers.
التوفيق السارية
(h) The Roads And Transport Authority
current Rules of Arbitration and
Conciliation يلتزم المقاول نحو صاحب العمل نظير4
4. In consideration of the payments to الدفعات التي سيتلقاها منه بتنفيذ وإنجاز األعمال
be made by the Employer to the وإصالح أي عيوب فيها على نحو مطابق من
Contractor, the Contractor hereby .كافة األوجه ألحكام العقد
covenants with the Employer to
execute and complete the works and
remedy any defects therein in
conformity in all respects with the
provisions of the Contract.
يلتزم صاحب العمل بأن يدفع مبلغ قيمة العقد.5
5. The Employer hereby covenants to أو أي مبلغ آخر قد يستحق دفعه وفقا ً ألحكام
pay the Contractor in consideration
of the execution, completion, العقد إلى المقاول نظير تنفيذ وإنجاز وصيانة
maintenance of the works, and the األعمال وإصالح أي عيوب فيها وذلك في
remedying of any defects therein the .األوقات والنحو المبين في العقد
Contract Price or such other sum as
may become payable under the
provisions of the Contract at the
times and in the manner prescribed
by the Contract.
IN WITNESS whereof the authorized
بهذا فقد وقع ممثال الطرفان المخول لهما
representative of the parties have بالتوقيع على هذا العقد في اليوم والشهر
hereunto set their respective hands the .والسنة المذكورين أعاله
day, the month and year first above
written.
D2
SIGNED BY :__________________________ _______________________ :وقعه
Mattar Al Tayer مطر الطاير
Chairman of the Board and Executive المدير العام ورئيس مجلس المديرين
Director -
Duly authorized to sign this Contract for and المخول نيابة عن صاحب العمل هيئة الطرق و
on behalf of the Employer the Roads And . المواصالت
Transport Authority.
: بحضور
In the presence of :
Name : Hussain Mohamed Al Banna حسين محمد البنا: االسم
______________________ : التوقيع
Signature : ______________________
المدير التنفيذي لمؤسسة المرور: الوظيفة
Occupation: CEO Traffic & Roads
Agency
والطرق
D3
E) Specimen Forms
SPECIMEN FORM OF TENDER BOND
Date:
Director
Contracts & Purchasing Department
Roads & Transport Authority
P. O. Box 118899, DUBAI
Dear Sir,
PROJECT: R1060/2
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT OF AL ASAYEL LINK
At the request of
Messrs…………………………………………………………………
………………………………………………………………….. Hereinafter called
“the Tenderer”), Post Box No. ................................ ; We hereby
unconditionally & irrevocably agree to hold at your disposal the sum of Dhs….
{In figures} (U.A.E. Dirhams. {In Words}), as a Tender Bond.
This Tender Bond shall be free of interest and payable in cash on your first
written demand in the manner ordered, without the Tenderer or any person on
his behalf or ourselves having the right to suspend or delay payment or to
object thereto for any reason whatsoever.
Yours faithfully,
Name: Name:
Designation: Designation
E-1
SPECIMEN FORM OF PERFORMANCE BOND
Ref:
Date:
Director
Contracts & Purchasing Department
Roads & Transport Authority
P. O. Box 118899, DUBAI
Dear Sir,
PROJECT: R1060/2
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT OF AL ASAYEL LINK
This Bond shall be free of interest and payable in cash on your first demand after
its validity starting date in the manner ordered, without the company or any
person on its behalf or ourselves having the right to suspend or delay payment or
to object thereto for any reason whatsoever.
Yours Faithfully,
Name: Name:
Designation Designation
E-2
SPECIMEN FORM FOR ADVANCE PAYMENT BOND
Ref:
Date:
Director of Contracts and Purchasing Department
Roads and Transport Authority
Post Box No. 118899,
Dubai, UAE.
Dear Sir,
Subject: Our Bank Guarantee No. ………………. .
For Contract: PROJECT: R1060/2
IMPROVEMENT OF SHEIKH RASHED - DEVELOPMENT OF AL ASAYEL LINK
This guarantee shall be free of interest and payable in cash on your first written demand in the
manner ordered, without the Contractor or any person on his behalf or ourselves having the right
to suspend or delay payment or object thereto for any reason whatsoever.
It is understood that our liability towards you will be progressively reduced by the amount repaid
to you by the Contractor as contained in the certificates and payments against the said advance
payment.
This guarantee is valid from ………… up to …………., There after it shall be automatically
renewed until Meydan Group LLC advises in writing that all contractual obligations against the
advance payment have been fulfilled by the contractor.
Yours Faithfully,
Name: Name:
Designation Designation
E3
F) Rules of Arbitration
and Conciliation
ROADS AND TRANSPORT AUTHORITY
The Rules of Arbitration and Conciliation shall be the Roads and Transport Authority
Rules of Arbitration and Conciliation, 1st Edition, January 2006 applicable to this
project is not attached with the document and is available in the Engineers office for
perusal by Tenderers during normal office hours with prior appointment.
F1
G) List of Tender Drawings
THIS DRAWING IS THE COPYRIGHT OF AECOM AND SHALL NOT BE USED, MODIFIED, REPRODUCED, OR RELIED UPON BY THIRD PARTIES, EXCEPT AS AGREED BY AECOM OR AS REQUIRED BY LAW. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES OR RELIES ON THIS DRAWING WITHOUT AECOM'S EXPRESS WRITTEN CONSENT. DO NOT SCAL
ISO A1 841 x 594 mm
Last Plotted: 13-10-2020 18:14:29
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-RD-000200.DWG
Last Plotted: 2024-05-14
60724429 A1 N.T.S
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-RD-000200.DWG
Last Plotted: 2024-05-14
60724429 A1 N.T.S
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-RD-000200.DWG
Last Plotted: 2024-05-14
60724429 A1 N.T.S
THIS DRAWING IS THE COPYRIGHT OF AECOM AND SHALL NOT BE USED, MODIFIED, REPRODUCED, OR RELIED UPON BY THIRD PARTIES, EXCEPT AS AGREED BY AECOM OR AS REQUIRED BY LAW. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES OR RELIES ON THIS DRAWING WITHOUT AECOM'S EXPRESS WRITTEN CONSENT. DO NOT SCALE FROM THIS DRAWING.
Last Plotted: 13-10-2020 18:14:29
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276963\60724429-ACM-0000-00-DR-ST-000201.DWG
TENDER DRAWING
Last Plotted: 2024-05-13
DRAWING TITLE:
Last saved by: KHANHU(2024-05-14)
STRUCTURES
LIST OF DRAWINGS
SHEET-01
DESIGNED BY: CHECKED BY: APPROVED BY:
AS / MT WTM NZ
DRAWING NO.: REV.:
60724429-ACM-0000-00-DR-ST-000201 T00
Project Originator Zone Level Type Role Serial No. Rev. No.
PROJECT ID: DRAWING SIZE: SCALE:
60724429 A1 N/A
THIS DRAWING IS THE COPYRIGHT OF AECOM AND SHALL NOT BE USED, MODIFIED, REPRODUCED, OR RELIED UPON BY THIRD PARTIES, EXCEPT AS AGREED BY AECOM OR AS REQUIRED BY LAW. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES OR RELIES ON THIS DRAWING WITHOUT AECOM'S EXPRESS WRITTEN CONSENT. DO NOT SCALE FROM THIS DRAWING.
Last Plotted: 13-10-2020 18:14:29
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276963\60724429-ACM-0000-00-DR-ST-000202.DWG
TENDER DRAWING
Last Plotted: 2024-05-13
DRAWING TITLE:
Last saved by: KHANHU(2024-05-14)
STRUCTURES
LIST OF DRAWINGS
SHEET-02
DESIGNED BY: CHECKED BY: APPROVED BY:
AS / MT WTM NZ
DRAWING NO.: REV.:
60724429-ACM-0000-00-DR-ST-000202 T00
Project Originator Zone Level Type Role Serial No. Rev. No.
PROJECT ID: DRAWING SIZE: SCALE:
60724429 A1 N/A
NOTES:
Last Plotted: 13-10-2020 18:14:29
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-UT-000211-000212.DWG
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Last Plotted: 2024-05-14
60724429 A1 NTS
NOTES:
Last Plotted: 13-10-2020 18:14:29
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-UT-000211-000212.DWG
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Last Plotted: 2024-05-14
60724429 A1 N.T.S
NOTES:
Last Plotted: 13-10-2020 18:14:29
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-UT-000201-000202.DWG
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Last Plotted: 2024-05-14
60724429 A1 N.T.S
NOTES:
Last Plotted: 13-10-2020 18:14:29
LEGEND:
DRAWN BY: Author
PROJECT NAME:
R1060/2 - IMPROVEMENT OF SHEIKH RASHED -
DEVELOPMENT OF AL ASAYEL LINK
ZONE: SECTION NO.: PLOT NO.:
- - -
PROJECT DESCRIPTION:
CONSULTANCY SERVICES FOR DEVELOPMENT
OF AL ASAYEL LINK
CLIENT:
CONSULTANT
Imagine it.
Delivered.
AECOM MIDDLE EAST LIMITED
Filename: C:\PWWORKING\AECOM_DS03_ME\D0276986\60724429-ACM-0000-00-DR-UT-000201-000202.DWG
Ubora Tower, Level 43, Business Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
TENDER DRAWING
Last Plotted: 2024-05-14
60724429 A1 N.T.S
OVERTIME OVERTIME
POSITION RATE RATE
(X) (Y)
Inspector TBC TBC
Notes:
H1
J) RTA Corporate safety
Circulars
ROADS AND TRANSPORT AUTHORITY
The RTA Corporate Safety Policy & Circular for Quality, Health, Safety and
Environment (QHSE) on Road Projects applicable to this project is not attached with
the document and is available at the Engineer’s Office for perusal by Tenderers
during normal office hours with prior appointment.
J1
K) Green Economy Bid
Evaluation Checklist for
RTA Suppliers
ROADS AND TRANSPORT AUTHORITY
Green Economy Bid Evaluation Checklist for RTA Suppliers
K1
L) RTA Classification of
Assets
RTA CLASSIFICATION OF ASSETS
Employer: Date:
Minor X Y Z NUMBER OF SERIAL LIGHTING COMMUNITY COMMUNITY Asset Asset Owner Asset Manufacturer Warranty Manufacturing
Major Category Description Quantity Units Unit Cost Date Placed In Service POLE NUMBER POLE HIGHT
Category COORDINATE COORDINATE COORDINATE LUMINARS NUMBER POLE TYPE NAME ID Condition Department Function/ / Developer Expiration Date
-L/1-
-L/2
-L/3
-L/4
-L/5