187 Erp606 BPD en CN
187 Erp606 BPD en CN
187 Erp606 BPD en CN
6.0
July 2012
English
SAP AG
Dietmar-Hopp-Allee 16
69190 Walldorf
Germany
SAP Best Practices Reference and Simulation Costing (187): BPD
Copyright
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer,
StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions,
Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well
as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd.
Business Objects is an SAP company.
Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and
services mentioned herein as well as their respective logos are trademarks or registered trademarks of
Sybase Inc. Sybase is an SAP company.
Crossgate, m@gic EDDY, B2B 360°, and B2B 360° Services are registered trademarks of Crossgate
AG in Germany and other countries. Crossgate is an SAP company.
All other product and service names mentioned are the trademarks of their respective companies. Data
contained in this document serves informational purposes only. National product specifications may
vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its
affiliated companies ("SAP Group") for informational purposes only, without representation or warranty
of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The
only warranties for SAP Group products and services are those that are set forth in the express
warranty statements accompanying such products and services, if any. Nothing herein should be
construed as constituting an additional warranty.
© SAP AG Page 2 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
External Process
Typographic Conventions
Example text Exact user entry. These are words or characters that you enter in the
system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these
words and characters with appropriate entries.
© SAP AG Page 3 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
Contents
1 Purpose............................................................................................................................. 5
2 Prerequisites...................................................................................................................... 5
2.1 Roles.......................................................................................................................... 5
2.2 Preliminary Steps....................................................................................................... 6
2.2.1 Setting Controlling Area.......................................................................................6
3 Process Overview Table.................................................................................................... 6
4 Process Steps.................................................................................................................... 7
4.1 Creating Base Planning Object...................................................................................7
4.2 Analyzing Results....................................................................................................... 9
4.2.1 Option1: When You Edit the Base Planning Object.............................................9
4.2.2 Option2: Reporting from Information System....................................................10
© SAP AG Page 4 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
1 Purpose
Reference and Simulation Costing is a tool for planning costs and setting prices, with which
you manually enter the costing items in spreadsheet form in a unit cost estimate.
With this component, you can create base planning objects. A base planning object is a
reference object of Product Cost Planning which you create in Reference and Simulation
Costing, in order to plan costs for a new product or service and simulate changes to existing
cost estimates. If you plan a new product for which there is no master data in the SAP ERP,
you can perform initial planning and cost projections by creating a Base Planning Object
using Reference and Simulation Costing. Using this method, you manually plan the costs for
an item.
This BPD describes the various item categories that are available for product cost planning. It
explains the processes of creating a base planning object and costing items. It describes the
results of a base object cost estimate and explains how to work with references. The BPD
also describes the information system and explanation facilities.
When the first material master data is created in the SAP ERP, you can use the Material Cost
Estimate without Quantity Structure to manually plan the cost of goods manufactured and the
cost of goods sold for the product. You can use the base object cost estimate as a reference
for this. Two methods are available for material cost estimate planning without quantity
structure, multi-level unit costing and single-level unit costing. Multi-level unit costing enables
you to plan cost at the assembly level without requiring production bills of material.
2 Prerequisites
Costing variant
It is requested a costing variant for material cost estimates exists which contains important
control parameters for the automatic determination of quantity structure and for the update of
prices in the material master. The existing costing variant PG which is defined in the standard
system can be used, or a new one can be defined.
Costing Sheet
To calculate the overheads a costing sheet is required. We recommend using a separate
costing sheet for reference and simulating costing purposes.
2.1 Roles
Use
The following roles must have already been installed to test this scenario in the SAP
NetWeaver Business Client (NWBC). The roles in this Business Process Documentation must
be assigned to the user or users testing this scenario. You only need these roles if you are
using the NWBC interface. You do not need these roles if you are using the standard SAP
GUI.
Prerequisites
The business roles have been assigned to the user who is testing this scenario.
© SAP AG Page 5 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
Use
The controlling area is to be set before you carry out the first steps in controlling.
If the controlling area is already assigned in the user parameters (see the Quick
Guide), this step is no longer necessary and can be omitted.
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Settings Set Controlling
Area
Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to
SAP Home (SAP NetWeaver Business Client).
© SAP AG Page 6 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
4 Process Steps
4.1 Creating Base Planning Object
Use
In this activity you create a Base Planning Object and you fill in the header information.
Prerequisite
Cost estimates are calculated according item categories which are to be assigned to the base
planning objects.
Following items are available:
B Base Planning Object
E Internal Activity
F External Activity
L Subcontracting
M Material
N Service
O Arithmetical Operation
P Process (Manual)
S Total
T Text Item
V Variable Item
Not all items can be assigned in each simulation situation. It depends on the kind of the base
planning object and the available data which items can be assigned.
Example: item B can only be assigned if other base planning objects are created. SAP Best
Practices do not deliver base planning objects. The base planning objects are to be created
before they can be assigned.
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
© SAP AG Page 7 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
SAP ECC menu Accounting Controlling Product Cost Controlling Product Cost
Planning Reference and Simulation Costing Create Base
Planning Object
Transaction code KKE1
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Product Cost Planning Add Base
Planning Object
2. On the Create Base Planning Object: Initial Screen, make the following entries:
Field name Description User actions and values Comment
Base Planning The name of the new For example,
Object material MAT_NEW
Copy from Base Can be used if was already
Planning Object defined
3. Choose Enter.
4. If there is pop-up window which requires to input controlling area, then fill out the
following entries and confirm with enter:
Field name Description User actions and values Comment
Controlling «CtrllingArea_V001_CtrllingArea»
Area
5. On the Create Base Planning Object: Master Data screen, make the following entries:
Field name Description User actions and values Comment
Company Code «CompCode_V001_CompCode»
Base Unit of PC For example, PC
Measure
Plant «Plant_V001_Plant»
Costing Sheet Costing Sheet defined for this For example,
purpose YPP-PC
Cost Element A cost element for semi-finished For example,
or finished products 50010501
Name Short Description of Base For example,
Planning Object <Material BPO>
Description Long Description of Base
Planning Object
6. Choose Enter.
© SAP AG Page 8 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
8. Choose Enter.
9. On the Create Unit Cost Estimate: List Screen-1 screen, make the following entries:
Field name / Description User actions and values Comment
Category
Category For example, E
Resource For example, cost center
<1301>
Plant/Activity For example, 1 Use F4 help for the
selection of the
activity type
Quantity For example, 0.5
Unit of Measure
Enter
Save Cost estimate
saved temporarily
For each item you will be requested to enter the input fields. Depending on item
category, these are: resources, plant, texts, quantity, cost element, origin and so
on.
A component can be an already existing base planning object. You can explode
the content of its, and make the necessary changes.
Enter all desired components and save your entries temporarily.
The cost estimate for the reference object is saved locally but not written to the
data base.
The unit cost estimate can be analyzed and changed if needed.
10. On the Create Base Planning Object: Master Data screen, save your entries.
When you save the cost estimate, the system automatically applies overhead
because you entered the costing sheet in the master data of the base planning
object.
11. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)
Or
Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to
SAP Home (SAP NetWeaver Business Client).
Result
The Base Planning Object is created. This includes a unit cost estimate.
© SAP AG Page 9 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
Use
For quick report, with immediate results
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Accounting Controlling Product Cost Controlling Product Cost
Planning Reference and Simulation Costing Change Base
Planning Object
Transaction code KKE2
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Product Cost Planning Change Base
Planning Object
5. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)
Or
Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to
SAP Home (SAP NetWeaver Business Client).
Results
By choosing the report layout that groups the costs by cost element you can determine which
cost element represents the consumption of semi-finished products and other useful analyze.
Use
This step is for presentation purposes.
Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI)
SAP ECC menu Accounting Controlling Product Cost Controlling Product
Cost Planning Information System Object List For Base
© SAP AG Page 10 of 11
SAP Best Practices Reference and Simulation Costing (187): BPD
Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business Role
Business role Product Cost Controller
(SAP_NBPR_PRDCOST_CONTRLR_S)
Business role menu Product Cost Controlling Reporting Costs Base Planning
Object Overview
2. In the field Base planning object enter your BPO.
3. Choose Execute in the toolbar to call the report.
4. Choose Display Cost Estimate. Call the list by choosing (NWBC: More...) Settings
Show All items.
5. Choose Back (F3) to the SAP Easy Access screen (SAP GUI)
Or
Choose Exit (Shift+F3) and confirm the Business client message with Yes to return to
SAP Home (SAP NetWeaver Business Client).
Result
You have a detailed report of selected BPO.
© SAP AG Page 11 of 11