JSA - Installation of SPRINKLER - MODIFICATION WORKS AT AL KHALEEJ HOUSE BLDG #9-999 @ABQAIQ.
JSA - Installation of SPRINKLER - MODIFICATION WORKS AT AL KHALEEJ HOUSE BLDG #9-999 @ABQAIQ.
JSA - Installation of SPRINKLER - MODIFICATION WORKS AT AL KHALEEJ HOUSE BLDG #9-999 @ABQAIQ.
Altaf Hassain
Safety Officer
REFERENCES:
Work Permit System GI-2.100
SA-CSM Hand Tools and Power Tools under Section 11.4 Requirements for Specific Types of Hand Tools
Lockout and Use of Hold tags process G.I 6.012
SAFETY EQUIPMENT REQUIRED: Safety Hat, Safety Shoes, Safety Gloves, Safety Glasses, Ear Plugs; pad lock & hold tag; caution/ warning tape
Note: Adequate and special PPE must also be considered for this task
JOB
STEP
NO. SEQUENCE OF BASIC JOB
POTENTIAL HAZARDS REQUIRED HAZARD CONTROLS/SAFE WORK PROCEDURES
STEPS
Installation of Firefighting Slippery Floor. Foreman/ Supervisor/Worker need to inspect the floor before start
Pipes and sprinkler using Damage Ladder. working on ladder.
portable Ladder Fall form height. Safety Officer /Supervisor should inspect the ladder weather
Falling objects. it is in good condition.
Over loading. Incompetent worker should not work on the ladder.
Access & egress Worker should not lift any slippery or Heavy Material which has
potential to fall.
Worker should not keep any material on the steps of the ladder.
Installation of sprinkler Sharp edge item A qualified and experienced plumber is needed to optimally install
Sprinkler glass may damage this network of pipes to fit the sprinklers with high volumes of water
when the need arises.
Ensure sprinkler installation according to NEPA 13 AND 14.
Use necessary ppe while using sharp glass Materials.
Usage of Hand tools & Incompetent Person Before Starting the worker should be aware of power tools and
Power Tools wear mandatory PPE.
Tool Box should be conducted by safety officer before starting the
activity.
Damage Power Tools & Hand Tools Safety Officer / Supervisor /Foreman should inspect tools on regular
basis to avoid any incident. And Damage tools should be removed
from the site.
Closing out of work Trash can shall be provided for garbage, trash and unwanted
materials. Trash shall remove from waste bin on a daily basis.
Discarded unnecessary things.
Poor Housekeeping Keep tidy and clean area daily.
Use dump truck to transport debris material to Saudi Aramco
designated dumpsite...
Activity:
Date:
ATTENDANCE SHEET
I DO HEREBY DECLARE THAT THE JOB SAFETY ANALYSIS WAS EXPLAINED TO ME AND I FULLY UNDERSTAND.