In this tutorial, we shall keep things simple to help you understand the SAP make to order
process in the Sales & Distribution module. We shall differentiate the process from the make to
stock production strategy. Then we will walk through the SAP make to order process. The
process begins with creating the make to order material master for finished goods. Next, we
show you how to create a quotation based on the customer request for the make to order
product. We will then demonstrate creation of the sales order with reference to the quotation.
Finally, we will create the production order in the Production Planning module to trigger the
production process.
Production Strategies
Companies involved in the production of goods mainly follow one of the following two
production strategies:
Make to Stock – The product is mass produced and fast moving in nature, such
as consumer products, pharmaceuticals, household items, etc.
Make to Order – The product is not manufactured in advance, but produced once the
customer order is received, as with high-end cars, motorcycles, textile products etc.
Consumers use and buy make to stock products regularly, thus they are necessities rather than
luxury items. Companies create demand for these goods through advertising, promotions,
activations etc. and continue to produce based on demand, market trend, and forecast figures.
Companies keep safety stock levels of finished goods in their stock in case of high demand due
to seasonal changes or festive events.
The production process begins once the forecast is finalized. Material requirements planning
(MRP) is executed and requirements are generated for the manufacture of the finished goods.
The required raw materials are requested from the respective departments. For raw materials not
produced in-house, purchase requisitions are generated, along with the required date of delivery,
and sent to the procurement department.
Make to order products are specialized products which may be costly or highly customized,
such that the manufacturer should not freeze capital by making and storing the goods in advance
of the customer’s order.
In the make to order production process, a sales order initiates the demand for production. The
production department creates a bill of material to produce the required quantity and runs MRP.
Requirements for components manufactured in-house are sent to the respective department and
1
if any component needs to be purchased, a purchase requisition is raised and sent to the
procurement department. Once the make to order production process is completed, finished
good are transferred to a storage location as “special stock”. Finally, the finished goods are
delivered, and invoicing is carried out.
There are two scenarios in the make to order strategy which may be elected:
Offer a set of products with different varieties and flexible features. The various
configurations have fixed rates and the product is only manufactured once the order is
received from the customer. For example, a car manufacturing company offers different
variations of a particular model with different engines and other specifications at certain
prices. If the customer wishes to add or change certain features, the options can be
included with the fixed price for each. The company will only manufacture the car when
the order is received from the customer.
Manufacture certain goods customized to specific customer requirements. For example,
imagine a hotel company ordering towels for each of their properties. The customer may
require white towels with their brand embossed or embroidered in a specific color or size.
The company producing the towels does not provide a rack rate with fixed prices in this
scenario, but instead will quote the customer based on their specifications and desired
quantity for the finished goods.
Now we shall demonstrate the steps in the SAP make to order process. We will walk through the
following steps in the below sections:
To initiate the SAP make to order process, first create a material master for finished goods or
update an existing one with the appropriate item category group. We will demonstrate the
simpler approach. Execute the app Manage Product Master to change an existing material
master.
In the initial screen, enter the material number you want to update and hit Enter. Then, select the
DISTRIBUTION CHAINS TAB, as shown below:
2
3
4
5
6
OPTION 1
7
OPTION 2
8
9
10
11
Create Quotation
In the scenario described earlier where a customer requires a completely customized order for
embroidered towels, the customer submits their requirements to the company, then the company
must generate a quotation. In the SAP make to order process, create a quotation using Manage
Sales Quotations APP. In the initial screen, enter a quotation type and hit Enter to enter the
quote information.
12
s
13
Enter the following information:
14
15
16
To update the pricing for the custom order, highlight the relevant line item and press the item
conditions button .
17
Click the Conditions tab to see the price for the item. Update as necessary to correspond with the
required customizations.
18
Hit Enter then Save . The quotation will be saved with a confirmation message:
19
20
21
Create Sales Order
Once the customer places the order based on the quotation, create the sales order with reference
to the quotation created in the last step. Manage Sales Quotations APP and enter the relevant
sales order type in the initial screen.
22
23
Sales order components are copied from the quotation. Take note of the item category. This field
is populated as a result of the sales document type and item category group combination. This
particular combination is configured to produce AN MTO Requirements type as shown below:
Requirements type
24
The requirements type determines the planning strategy to be used for a
particular requirement.
s4hclub.com
s4hclub.com
25
s4hclub.com
To check the pricing or make updates for customer changes, highlight the relevant line item and
press the item conditions button . Click the Conditions tab to see the price for the item as
copied from the quotation.
s4hclub.com
26
s4hclub.com
Hit Enter then Save . The sales order will be saved with a confirmation message:
s4hclub.com
27
s4hclub.com
With this app, you can monitor all the materials in a selected area of responsibility. This includes
collective requirements materials, make-to-stock and make-to-order materials, and materials for direct
procurement. You are provided with a list of all materials with a net requirement segment or individual
planning segments, which considers the following planning segments:
Segment for direct production planning – with direct creation of planned orders
Segment for direct procurement planning – with direct creation of purchase requisitions
28
The system calculates the requirements for each segment separately. The materials of these
planning segments might have coverage issues according to a specified shortage definition. The
shortage definition you choose contains a set of rules that the system uses for calculating the
material shortages. These rules define the scope of the shortage calculation, meaning the supply
and demand elements to be considered and the conditions that have to be met to be a relevant
shortage. You can use the default filter Time till Shortage to check the coverage of materials
within a specific time frame.
s4hclub.com
29
s4hclub.com
s4hclub.com
30
s4hclub.com
s4hclub.com
31
s4hclub.com
s4hclub.com
32
s4hclub.com
s4hclub.com
33
s4hclub.com
s4hclub.com
34
s4hclub.com
s4hclub.com
35
s4hclub.com
s4hclub.com
36
s4hclub.com
s4hclub.com
37
s4hclub.com
With this app, you can release production orders. The order release can be executed at the
following levels:
If you release at order header level, the production order and all its operations are released.
The order and the operations receive the status REL (released).
You can also release individual operations within a production order. The operation receives
the status REL and the order receives the status PREL (partially released). If all operations in
an order have been released, the order has the status REL.
A newly created production order initially receives the status CRTD (created) and it must be
released, before it can be processed.
Note
You can use this app if the role Production Supervisor - Discrete Manufacturing is assigned to your user.
Key Features
You can use this app to:
38
You can select several production orders with, for example, the same order type, plant and MRP
controller and release them simultaneously.
Note
An operation can only be released if the preceding operation has been released.
Desktop
Tablet
s4hclub.com
39
s4hclub.com
s4hclub.com
40
s4hclub.com
s4hclub.com
41
s4hclub.com
s4hclub.com
42
s4hclub.com
s4hclub.com
Log on to the SAP Fiori launchpad as Warehouse Clerk. The SAP Fiori launchpad displays.
43
s4hclub.com
s4hclub.com
The Goods Receipt Other - XXX (your user name) screen displays.
44
s4hclub.com
s4hclub.com
In the Detail Data section, make the following entries and press Enter. Select Next Item icon to add
entries.
45
s4hclub.com
● Plant: 1010
● Storage Location:
101B
s4hclub.com
46
● Quantity: <Quantity>, for example, <100>
s4hclub.com
● Material: <BOM Material>, see the Bill of Material Structure for FG228 and FG227 in the
Master Data, Organizational Data, and Other Data section for a detailed materials list.
Run through Make-to-Order Production - Semifinished Goods Planning and Assembly (1BM) test
script if you do not want to post initial stock for SG224.
s4hclub.com
47
Select Item OK, and choose Check. A message displays: The Document is OK. You also post
initial stock for material RM20 in case you test with material FG227.
s4hclub.com
s4hclub.com
Confirm the message that the batch has been created and choose Post. A message displays: Material
document XXXXXXXX posted.
48
s4hclub.com
s4hclub.com
49
s4hclub.com
Availability Check
Checks whether the components required for a production order are available.
Use
Before you start production, you have the option of checking whether all the components assigned to a
production order are available on the calculated requirements dates.
Features
In a production order, the system can check the availability of a component only if the following
applies for the component:
It is kept in stock.
The availability of components can be checked automatically during order creation or during
order release. In your configuration environment, you specify per order type and plant whether
the availability should be checked automatically. In addition, an
automatic availability check can be carried out when the order is saved.
50
In your configuration environment, use the search function to open the following
activity: Define Checking Control. For more information, see Configuration
Environment of SAP S/4HANA Cloud.
Note
If you make changes in an order, which could affect the availability of its components (for example
date or quantity changes), this does not automatically trigger a new availability check. For up-to-date
information on any missing components in an order, you should restart the availability check manually
after you have made the changes.
You should define the automatic availability check when the order is
The checking scope is defined via the checking group in the material master and the checking
rule in your configuration environment:
Every material that shall be considered in the availability check must be assigned to a
checking group. The assignment is carried out in the material master record.
The checking rule defines how the availability check is performed, that is, which stocks, goods
receipts, and goods issues are included in the check and whether the check is performed with
or without the replenishment lead time.
In your configuration environment, use the search function to open the following
activity: Define Checking Control. For more information, see Configuration
Environment of SAP S/4HANA Cloud.
Note
51
If a check is carried out at storage location level and the components are available, the system
automatically carries out an additional check at plant level. For performance reasons, we recommend
that you only carry out this type of check where required.
If, during an availability check, a material requirement exists with reference to a sales order / project,
the check is carried out in the individual planning section of the sales order / project.
s4hclub.com
s4hclub.com
s4hclub.com
53
s4hclub.com
You can use this app to determine which components have not yet been issued from stock for a
production order and then carry out the goods issue.
Note
In this app, components with mandatory serial numbers cannot be picked. Components with optional
serial numbers cannot be picked using the serial numbers. Please use the Post Goods
Movement (MIGO) app or the Post Goods Issue (MIGO_GI) app to post the material components by
their serial numbers.
Key Features
The initial screen for selecting production orders is the same as the object detail list for components in
the production order information system.
The result of the selection is a component overview for the orders selected and a pick list containing
the components still to be issued.
54
Note
You select orders using selection criteria. All the components are displayed for each order selected.
For example, if you enter a component as a selection criterion, all the components are displayed, of
those orders that contain this component.
When you select orders for picking, note the following:
Created
Locked
Technically complete
Backflushed components
s4hclub.com
Phantom items
55
Co-Products
Text items
Online mode
The system calls up stock determination. Successful goods movements are posted immediately.
Any goods issues with errors can be immediately corrected online.
Background mode
The components are marked for goods issue and then processed in background jobs.
Related Information
56
s4hclub.com
s4hclub.com
57
s4hclub.com
s4hclub.com
58
s4hclub.com
s4hclub.com
59
s4hclub.com
s4hclub.com
60
s4hclub.com
s4hclub.com
61
s4hclub.com
s4hclub.com
62
s4hclub.com
Confirm Production
With this app, you can partially or completely confirm production operations and suboperations. You
can enter produced quantities including scrap or rework for operations. You can edit material
movements and specify durations for activities for both the selected production operations or
suboperations.
Restriction
You can only confirm operations with automatic trigger points but not operations with trigger
points that require user interaction dialog boxes. To confirm such operations, use the Confirm
Production Order Operation (CO11N) app.
You cannot confirm a milestone operation for collective orders. While the confirmation itself
will be posted successfully and all operations of the leading order and child orders will be
confirmed automatically, the child orders will not get the status Delivered, nor will the
Delivery Completed indicator get set for these orders. To confirm such operations, use the
Confirm Production Order Operation (CO11N) app.
63
This app is contained in the business catalog Production Control (Discrete) - Order
Execution (SAP_SCM_BC_PRODN_ORD_EXEC_MC). For more information about the business
role templates, see the Fiori Apps Reference Library for your release.
Key Features
You can use this app to:
Select a production order with a related production operation or suboperation for processing.
Get an overview of the backflushed components used for the production operation.
Edit a material used in the production operation or suboperation, for example the storage
location or the quantity to be confirmed.
This app also supports goods movements to/from warehouse-managed storage locations with
synchronous postings.
Enter information on activities that have been defined for the work center, such as setup,
machine, and labor times.
If configured, select the shift during which the activities have been performed from the
proposed values.
Enter the personnel number of the person confirming the operation or suboperation.
In the configuration activity Define Confirmation Parameters, you can configure the following for
each combination of plant and order type:
Whether the confirmation sequence of the single operations of a production order is checked.
64
Whether underdelivery and overdelivery are checked.
Whether error logs are displayed for actual costs and goods movements and whether the
confirmation process is canceled in case of errors.
Whether the quantities and / or activities should be proposed automatically when you start the
app. If you deselect these settings, the values are defaulted to 0 when you start the app.
However, you can fetch the proposed quantities and activities in the app by choosing the Get
Proposals button.
Note
If you want to confirm an operation that has been distributed to an external manufacturing
execution system (MES), the quantities for that operation are never proposed in the app, even
if the configuration setting for quantities is set to Propose. This is because the quantity
confirmation is expected to come from the MES and double postings should be avoided. If
you still need to confirm quantities for distributed operations in the Confirm Production
Operation app nonetheless, you can choose the Get Proposals button to fetch the open
quantity.
Whether the shift field is displayed and available shifts are proposed.
Note
If you want to use shifts in confirmations, you have to make further settings in your system. For
more information, see Shift-Related Confirmation.
In your configuration environment, use the search function to open the following activity: Define
Confirmation Parameters. For more information, see Configuration Environment of SAP S/4HANA
Cloud.
Desktop
Tablet
Smartphone
65
Feature Comparison for Confirming Production Order
s4hclub.com
s4hclub.com
66
s4hclub.com
s4hclub.com
67
s4hclub.com
s4hclub.com
68
s4hclub.com
With this app, you can post the receipt of goods with reference to a production order.
The app proposes a selection of production orders as well as the corresponding material item level that
can be posted. This app supports you, for example, as a warehouse clerk in your daily work.
Key Features
Central Use
Split Valuation
69
Serial Numbers
Integration of Mobile Scanner and Barcode Scanning
Others
In addition, the app supports the following technical features and options:
Note
Prerequisite for barcode scanning is a mobile device with a touch-sensitive display.
This app includes SAP CoPilot. This digital assistant in the SAP S/4HANA system supports
you with features such as business context awareness or quick actions to manage follow-on
activities directly from the app.
Desktop
Tablet
Smartphone
70
s4hclub.com
s4hclub.com
71
s4hclub.com
s4hclub.com
72
s4hclub.com
With this app, you can post the receipt of goods with reference to a production order.
The app proposes a selection of production orders as well as the corresponding material item level
that can be posted. This app supports you, for example, as a warehouse clerk in your daily work.
73
s4hclub.com
s4hclub.com
74
s4hclub.com
s4hclub.com
75
s4hclub.com
s4hclub.com
76
s4hclub.com
RESULT
s4hclub.com
77
s4hclub.com
Execute Delivery
Now let’s suppose that the SAP make to order production process has been completed and
goods are sent to the finished goods storage location awaiting dispatch to the customer. Check
the stock overview MMBE APP and enter the finished goods material number to see the stock
for the specific make to order product. (In the below stock overview, the quantity is presented in
European format, with a comma representing a decimal point. Thus, the below image shows a
quantity of 1 in unrestricted use.)
78
s4hclub.com
s4hclub.com
79
s4hclub.com
s4hclub.com
80
s4hclub.com
Let’s create a delivery and see what happens to the stock level. Use Create Delivery with
Reference to Sales OrderAPP to enter a delivery. In the initial screen, enter the shipping point
and sales order number as shown below:
Hit Enter to proceed to delivery document creation. The deliver document is displayed with
delivery information pre-populated from the sales order.
With this app, you can create outbound delivery runs from a list of sales orders. This app also allows
you to display logs with information related to your sales orders or deliveries. For example, if errors
occur while you are creating deliveries, the system issues a message to the log. Similarly, the system
issues a message to the log if you successfully create a delivery.
Key Features
Search for sales orders due for delivery using basic filter options. You can also search using
additional filter options.
Sort your table entries by ascending or descending and then select the filter option you want
to sort by.
81
Personalize your table columns.
If a product has been marked as relevant for compliance in the product master data, the
system performs marketability, dangerous goods, and safety data sheet checks for the
corresponding outbound delivery. The results are displayed in the corresponding columns.
Create outbound deliveries from sales orders with a limited number of items, or navigate to
the Schedule Delivery Creation app to schedule the mass processing of sales orders.
Display a log that provides you with information about the delivery run that you have created.
Use the Save as Tile option to create a personalized tile on the launchpad. This tile will
display a fixed snapshot of your current selection criteria. For example, if you filter by the
date option Today, your personalized tile will only display the number of documents that are
relevant for that specific day, as the current date selection is stored as a fixed date.
s4hclub.com
82
s4hclub.com
s4hclub.com
83
s4hclub.com
s4hclub.com
84
s4hclub.com
s4hclub.com
85
s4hclub.com
s4hclub.com
86
s4hclub.com
s4hclub.com
87
s4hclub.com
Press the Post Goods Issue button POST GOODS ISSUE to save the movement. The delivery
document will be updated with a confirmation message as shown below:
s4hclub.com
88
s4hclub.com
s4hclub.com
Let’s check the stock overview once more to see if the sales order stock is consumed. Execute
STOCK – SINGLE MATERIAL APP and enter the finished goods material number. The stock
is reduced by the quantity entered in the delivery document. In our case, the stock is now non-
existent, as shown below:
89
s4hclub.com
s4hclub.com
90
s4hclub.com
s4hclub.com
Generate Billing
Finally, generate the billing for the make to order product. Execute CREATE BILLING
DOCUMENT APP to create the billing document. In the initial screen, enter the sales
order number and press Enter to proceed to the billing document.
91
s4hclub.com
s4hclub.com
92
s4hclub.com
s4hclub.com
Hit Save to post the billing document, print the output, and post the accounting document. The
billing document is saved with a confirmation message:
93
s4hclub.com
s4hclub.com
94
s4hclub.com
s4hclub.com
95
s4hclub.com
Let’s have a look at the sales document flow via DISPLAY DOCUMENT FLOW. Here you can trace
the flow of documents through the entire SAP make to order process, beginning with the quotation and co
With this app you can display all documents that are part of a business transaction.