0% found this document useful (0 votes)
23 views1 page

TO Structure

Brief breakdown for structural work

Uploaded by

ukslqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

TO Structure

Brief breakdown for structural work

Uploaded by

ukslqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

UANTITIES ON 1.00 Typical Bldg. (1) = TOTAL ON 1.00 Typical Bldg.

(2) =
VIL WORKS Bldg. (1) - Total (1) Typ Blg (1) Bldg (2) - Total (2)
OUNDATIONS F1 F2 F3 F3 F1 SF1 F3
No. No. 16.00 7.00 1.00 24.00 24.00 4.00 1.00 - 5.00
Lx m 1.80 2.10 3.20 1.40 20.50 -
Ly m 1.40 1.60 3.00 1.20 0.60 -
D m 0.50 0.50 0.40 0.50 0.40 -
Volume m3 20.16 11.76 3.84 35.76 35.76 3.36 4.92 - 8.28
Curing Area (water, Hessian, polythene 500) m2 91.52 49.42 14.56 155.50 155.50 17.12 29.18 - 46.30
Bitumen Paint 3 coats m2 91.52 49.42 14.56 155.50 155.50 17.12 29.18 - 46.30
Horizontal Water proofing Membrane -1000GA m2 - - - - - - - - -
Vertical Water proofing Membrane -1000GA Pom2 - - - - - - - - -
Protection board m2 - - - - - - - - -
Shuttering (footing shuttering area)
Side Shutter , 18 mm plywood m2 51.20 25.90 4.96 82.06 82.06 10.40 16.88 - 27.28
Bottom & Top Support,White wood 1x4" CuM 0.46 0.23 0.05 0.74 0.74 0.10 0.17 - 0.26
Edges Support, White wood 3x3" CuM 1.93 0.97 0.20 3.10 3.10 0.40 0.67 - 1.07
Sides Props White wood 3x3" CuM 1.26 0.62 0.13 2.01 2.01 0.28 0.37 - 0.65
Earth support White wood 3x3" CuM 0.59 0.30 0.07 0.97 0.97 0.12 0.25 - 0.37
Shuttering Bars 12mmx45cm (6 times) No. 256.00 126.00 26.00 408.00 408.00 56.00 76.00 - 132.00

Re-bars
Dia of Bottom Rebars B/Ys mm 16.00 16.00 14.00 14.00 12.00 -
Spacing m 0.15 0.15 0.15 0.15 0.15 0.20
Wt. of rebars (B/Ys) Ton 1.23 0.68 0.18 0.17 0.21 -
Dia of Top Rebars B/Ys mm 14.00 - - -
Spacing m 0.15 0.15 0.15 0.15 0.15 0.15
Wt. of rebars (B/Ys) Ton - - 0.18 - - -
Dia of CHAIRS Rebars mm - - - - - -
Rebar CHAIR (for double mesh) Ton - - - - - -
Steel Rebars (Top & Bott) Ton 1.23 0.68 0.36 2.28 2.28 0.17 0.21 - 0.38
PVC Spacers No. 528.00 280.00 65.00 873.00 873.00 132.00 152.00 - 284.00

BLINDING
PCC Thickness m 0.10 0.10 0.10 0.10 0.10
PCC Area / Polythene m2 51.20 28.98 10.88 91.06 91.06 8.96 16.56 - 25.52
PCC Shuttering White wood 1" x 4 " CuM 0.36 0.18 0.04 0.58 0.58 0.08 0.12 - 0.19
Shuttering Bars 12mmx45cm (6 times) No. 192.00 98.00 18.00 308.00 308.00 48.00 48.00 - 96.00
PCC Volume m3 5.12 2.90 1.09 9.11 9.11 0.90 1.66 - 2.55
PCC Bitumen Paint m2 51.20 28.98 10.88 91.06 91.06 8.96 16.56 - 25.52
Anti Termite
Anti Termite (Horizontal Surface) m2 124.80 64.68 18.48 207.96 207.96 24.96 39.06 - 64.02
Anti Termite (Vertical Surface) m2 268.80 128.10 25.80 422.70 422.70 60.00 70.50 - 130.50
EXCAVATION
Excavation ( Isolated footings) m2 187.20 97.02 27.72 311.94 311.94 37.44 58.59 - 96.03
Excavation ( strips) m2 - - - - - - - - -
Excavation ( Whole Area) m3 - - - - -