Untitled Document

The document provides a schedule of materials needed for construction of a boxed drainage system including quantities of cement, sand, granite, hardcore rock, steel bars, timber, and nails.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

Untitled Document

The document provides a schedule of materials needed for construction of a boxed drainage system including quantities of cement, sand, granite, hardcore rock, steel bars, timber, and nails.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROPOSED MODERN MARKET DEVELOPMENT

AT IJAKO FOR NEHEMIAH GRACE DEVELOPERS


LIMITED.

SCHEDULE OF MATERIALS FOR CONSTRUCTION OF BOXED DRAINAGE.


-
S/N DESCRIPTION OF UNIT
MATERIALS QUANTITY

1 CEMENT 3000 bags


2 2STON SHARP SAND 25 trip
3 25TON GRANITE 20 trip
4 2STON HARDCORE ROCK 12 trip
OOLOERS

HIGH TENSILE SH(L ROPJ! fjfilQR


C[MEtlT 35 ton
5 16MM DIAMETER noo . 20 ton
6 12MM DIAMCTrn 1\00 15 bundle
7 BINDING WIRE

.TIMBER FOR FORMWORK.


8 2 X 3 X 12 WHITE WOOD 850 nr
9 MARINE BOARD 1100 sheets

NAILS
10 2",3", 4" 6 bags
11 3" & 4" NAILS 3 packets