ULTRA 5000W Dual MPPT Hybrid Inverter Manual

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

USER MANUAL

On Grid Solar Inverter


ULTRA 5000W-48V

Where ULTRA shined


Power always on

Monitor APP Download

Android IOS

Cellcronic Technologies Pvt. Ltd. www.cellcronic.com


Building No. 1, Daniyalpur chowk, Airport Road, Karnal, Haryana (132001) [email protected]
Table Of Contents
Information on this Manual 01 3. Working Modes 15

Validity 01 3.1 Offgrid modes introduction 15

Scope 01 3.2 Working modes related setting description 17

Target Group 01 4. LCD Display and settings 21

Safety Instructions 01 4.1 LED Display 21

1. Brief Introduction 02 4.2 LCD Display 21

1.1 Features of the inverter 02 4.3 Inverter Status Display 23

1.2 Interface of the inverter 03 4.4 LCD Settings 24

1.3 Packing list 04 5. Monitor System for Offgrid 31

2. Installation 05 6. Specifications 32

2.1 Preparation 05 7. Trouble Shooting & Error List 35

2.2 Mounting the Unit 07

2.3 Battery Connection 08

2.3.1 Battery Power Cable Connection 08

2.3.2 Lithium Battery Connection 08

2.4 AC Input/Output Connection 09

2.5 PV Connection 10

2.6 Generator Connection 10

2.7 Dry Contact Signal control 12

2.8 Parallel function 12

2.9 Power ON/OFF 14


Information on this Manual 1. Brief Introduction
Validity 1.1 Features of the inverter
This manual is valid for the following device: ULTRA On-Grid Dual MPPT5000W Hybrid Inverter

Internet
Scope Wifi / 4G

This manual provides the installation, operation and troubleshooting of this unit, please read this manual LOGIN

carefully before installations and operations.

Target Group
For qualified persons and end users. Qualified persons and end users must have the following skills:
Cellcronic Server
Knowledge about this unit operation Solar Panel
Training in deal with the security issues associated with installations and electrical safety

Training in the installation and commissioning of electrical devices and installations

Knowledge of the applicable local standards and directives

Safety Instructions Utility Grid


Home
WARNING: This chapter contains important safety and operating instructions. Read and keep this manual Loads
for future reference.

All the operation and connection need to be operated by qualified persons.

Before using the unit, read all instructions and cautionary marking on the unit. Any damage caused by
inappropriate operation is not warranted by Cellcronic.
Generator
All the electrical installation must comply with the local electrical safety standards.
Battery
Do not disassemble the unit. Take it to a qualified service center when service or repair is required,
incorrect re-assembly may result in a risk of electric shock or fire. Do not open inverter cover or change ULTRA series is a multifunctional, high frequency pure sine wave on grid solar inverter, features:
any components without cellcronic's authorization, otherwise the warranty commitment for the inverter
will be invalid. Applicable for pure off grid/ backup power / self-consumption / on grid situation

To reduce risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning, Integrated with 2 MPPT solar charge controllers, MPPT ranges 120V~385V
turning off the unit will not reduce this risk. Rated power 5KW, power factor 1

CAUTION-To reduce risk of injury, charge only deep-cycle lead-acid type rechargeable batteries and Be able to run with or without battery in ongrid and offgrid mode
lithium batteries, other types of batteries may burst, causing personal injury and damage. With separated generator input interface, able to control generator remotely
NEVER charge a frozen battery. Solar and utility grid can power loads at the same time
For optimum operation of this unit, please follow required spec to select appropriate cable size and breaker. With integrated advanced parallel function, up to 10pcs max paralleling
Please strictly follow installation procedure when you want to disconnect AC or DC terminals, please refer Support CAN/RS485 for Li-ion battery BMS communication
to INSTALLATION section of this manual for the details.
WIFI/ GPRS remote monitoring , setting and firmware update, support website, free IOS/Android APP
GROUNDING INSTRUCTIONS -This unit should be connected to a permanent grounded wiring system,
be sure to comply with local requirements and regulation to install this inverter.

NEVER cause AC output and DC input short circuited. Do not connect to the mains when
DC input short circuits.
01 02
1.2 Interface of the inverter 1.3 Packing List
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
You should have received the following items in the package:

LCD display

Expansion Screw Cross Head


Function buttons Off grid Inverter X1 User Manual X1 and Tube X4 Wi-Fi Module X1 ScrewX5 / NutX2

Fault/Warning Status indicator


Storing the Inverter
Normal Status indicator
The inverter must be stored appropriately if not installed immediately, refer to below figure.

PVA+ PVA- PVB+ PVB- L N PE L N PE L N


CAUTION !
AC INPUT AC OUTPUT GEN
BAT+ BAT-
a) The inverter and its components must be stored in its original packaging.

b) The storage temperature should be within -25~60 and humidity within 0~85%.

c) The packing should be upright and maximum stacked layers is 6 .

d) Do not directly exposed the inverter and its packaging to sunshine, raindrops and keep away
from corrosion.

MPPT485 WIFI

Li-ion
CAN/RS485 Dry Port GEN
NTC
No2 COM2 Nc2 No1 COM1 Nc1

Parallel BAT+ BAT- PVA PVB AC INPUT AC OUTPUT GEN


OFF OFF

ON ON

EPS Output Power

WiFi/GPRS Dry contacts Power on/off switch


Acid NTC port Circuit breaker

Parallel communication Resistor switch


EPS on/off switch
Parallel communication ports
Battery CAN /RS485

03 04
2. Installation 2. AC connection: Please install a separate AC breaker between inverter and AC input power source,
inverter and AC output load. This will ensure the inverter can be securely disconnected during maintenance
and fully protected from over current of AC input. The recommended spec of AC breaker is 32A.
2.1 Preparation Recommended AC input/ AC output /GEN cable size for each inverter.

The system connection is as below:


Model Gauge Cable (mm2) Torque Value
600V, 2*10AWG 600V, 2*10AWG
ULTRA 5000W 10AWG 6 1.2 Nm
L QF 1
N Grid
AC Input 3. PV Connection: Please install separately a DC circuit breaker between inverter and PV modules.
PE
The recommended of DC breaker is 600V/20A. It's very important for system safety and efficient
PE
L QF 1 operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the
N LOAD EPS proper recommended cable size as below:
AC Output
PE QF 2
Model Gauge Cable (mm2) Torque Value
100V, 2*4AWG

L QF 1
ULTRA 5000W 1x12AWG 4 1.2 Nm
GEN N G

BAT PV Generater 4. Before connecting all wiring, please take off bottom cover by removing 3 screws as shown below.
600V, 4*12AWG
MAX:140A

QF 3 QF 1 In≥63A
QF 2 In≥63A
QF 3 In≥140A
QF 2 is Double interlock switch or Dual Power Switch In≥63A

Please prepare the breakers and cables in advanced before installation.

1. Battery connection: For safety operation and regulation compliance, it's requested to install a separate
DC over-current protector or disconnect device between battery and inverter. The recommend battery
capacity is 150AH-200AH, the recommended spec of DC breaker is 150A/60V. Recommended battery cable
and terminal size:

Ring Terminal
Maximum Battery Torque value
Model Amperage capacity Wire Size Dimensions
Cable
mm2 D (mm) L (mm)
ULTRA 1*2AWG 38 6.4 39.2
5000W 110A 200AH 2~ 3 Nm
2*6AWG 28 6.4 33.2

05 06
2.2 Mounting the Unit 2.3 Battery Connection
Notice: Consider the following points before selecting where to install:
Mount on a solid surface
2.3.1 Battery Power Cable Connection
Do not mount the inverter on flammable construction materials. Note: for lead acid battery, the recommended charge current is 0.2C( C to battery capacity)
For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and approx. 1. Please follow below steps to implement battery connection:
50 cm above and below the unit.
2. Assemble battery ring terminal based on recommended battery cable and terminal size.
The ambient temperature should be between 0°C and 55°C to ensure optimal operation. 3. Connect all battery packs as units requires. It's suggested to connect at least 200Ah capacity battery
for ULTRA5000WPV.
The recommended installation position is to be adhered to the wall vertically.
4. Insert the ring terminal of battery cable flatly into battery connector of inverter and make sure the bolts
Steps to mounting the unit are tightened with torque of 2 ~3Nm. Make sure polarity of the battery is correctly connected and ring
Step1. Use the wall-mounting bracket as the template to mark the position of the 4 holes, then drill 8 mm terminals are tightly screwed to the battery terminals.
holes and make sure the depth of the holes is deeper than 50mm.

Step2. Install the expansion tubes into the holes and tight them, then use the expansion screws (packaged 2.3.2 Lithium Battery Connection
together with the expansion tubes) to install and fix the wall-mounting bracket on the wall.
If choosing lithium battery for ULTRA5000W PV, please make sure the battery BMS is compatible with
Step3. Install the inverter on the wall-mounting bracket and lock the inverter using the security screws. Cellcornicinverter. Please check thecompatible list in thecellcronicwebsite.

180 mm Please follow below steps to implement lithium battery connection:

1. Connect power cable between inverter and battery

2. Connect the CAN or RS485 communication cable between inverter and battery. If you do not get
the communication cable from inverter manufacturer or battery manufacturer, please make the cable
519 mm

according to the PIN definition


Pin 11 22 33 44 55 66 7 8
3. Lithium battery configuration, in order to Pin RS 485 port CAN port
communicate with battery BMS, you should
1 RS 485B ---
set the battery type to “Li-ion” in Program
“03” by LCD and choose the right battery 2 RS 485A ---
brand (for details, please check the LCD 3 --- CANL
500mm

setting chapter), users can also choose the


4 --- CANH
battery type and brand by monitor system.
5/6 --- ---

7/8 --- ---

Inverter
200mm 200mm
MPPT485
Battery Pack

NTC

Parallel
500mm

07 08
2.4 AC Input/Output Connection 2.5 PV Connection
Please follow below steps to implement PV module connection:
CAUTION!! 1. Remove insulation sleeve 10 mm for positive and negative conductors.
- There are two terminal blocks with “IN” and “OUT” markings. Please do NOT mis-connect input and
2. Check correct polarity of connection cable from PV modules and PV input connectors.
output connectors.
3. Connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Connect negative
- Be sure to connect AC wires with correct polarity. If L and N wires are connected reversely, it may
pole (-) of connection cable to negative pole (-) of PV input connector.
cause utility short-circuited when these inverters are worked in parallel operation.
4. Make sure the wires are securely connected.
5. Finally, after connecting all wiring, please put bottom cover back by screwing two screws as shown below.
Please follow below steps to implement AC input/output connection:

1. Before making AC input/output connection, be sure to open DC protector or disconnected first.

2. Remove insulation sleeve 10mm for six conductors. And shorten phase L and neutral conductor N 3 mm.

3. Insert AC input wires according to polarities indicated on terminal block and tighten the terminal screws.
Be sure to connect PE protective conductor first.

4. Insert AC output wires according to polarities indicated on terminal block and tighten terminal screws.
Be sure to connect PE protective conductor first. PVA+ PVA- PVB+ PVB- L N PE L N PE L N
AC INPUT AC OUTPUT GEN
BAT+ BAT-
5. Make sure the wires are securely connected.

10

Ground (yellow-green)
3
L→LINE (brown or black)
10
N→Neutral (blue)
3
2.6 Generator Connection
L→LINE (brown or black) N→Neutral (blue)

1. Before making Generator connection, be sure to open DC protector or disconnected first.

2. Remove insulation sleeve 10mm for 2 conductors.

3. Insert L and N wires according to polarities indicated on terminal block and tighten the terminal screws

PVA+ PVA- PVB+ PVB- L N PE L N PE L N


AC INPUT AC OUTPUT GEN
BAT+ BAT-

PVA+ PVA- PVB+ PVB- L N PE L N PE L N


AC INPUT AC OUTPUT GEN
BAT+ BAT-

09 10
All cellcronic units can work with generator.
2.7 Dry Contact Signal control
Users can connect the generator output to off grid inverters. GEN input terminal.
The Dry port(NO2,COM2,NC2) could be used to deliver signal to external device when battery voltage
The generator will be automatically started when battery voltage is lower than the cut-off value or there is charge reaches warning level. The GEN port(NO1,COM1,NC1) could be used to wake-up the Generator and
request from BMS. When voltage is higher than AC charge setting value, it will stop the generator then the generator can charge the battery.
Battery will get charged when the generator is turned on, and the generator is bypassed to AC output to Dry port GEN Dry port GEN
take all loads . NO2 COM2 NC2 NO1 COM1 NC1 NO2 COM2 NC2 NO1 COM1 NC1

Generator Unit Status Condition

NO2 & COM2 NC2 & COM2 NO1 & COM1 NC1 & COM1

Power Off Inverter is off and no output is powered. Open Close Open Close
MPPT485 WIFI
N
Li-ion
CAN/RS485 Dry Port GEN
L Battery voltage < Low DC
NTC
No2 COM2 Nc2 No1 COM1 Nc1
Close Open Close Open
warning voltage
Parallel BAT+ BAT- PVA PVB AC INPUT AC OUTPUT GEN
OFF OFF
Without Grid
ON ON
In≥63A Battery voltage > Setting value or
EPS Output Power Open Close Open Close
battery charging reaches floating stage
Power On Battery voltage < Low DC
PE
Close Open Open Close
N warning voltage
In≥140A With Grid
Battery voltage > Setting value or
N Open Close Open Close
L L HOUSE Essential LOAD battery charging reaches floating stage

PV Notice: NO---Normal open NC---Normal close


Double interlock switch or
Dual Power Switch In≥63A

N L
PE 2.8 Parallel function
N
BATTERY L ULTRA series inverter support upto10 units to composed single phase parallel system or three phase
In≥63A parallel system, for parallel system setup
Grid Step1. Cable connection: the system connection is as below:
Inverter 1
L AC Grid Bus-Bar(L,N)
The system will use AC first if there is both utility input and generator input.
PV AC Input N
PE
CAN 1 L AC
CAN 2 AC Output N
Parallel line 1 PE
BAT

DC
EPS Bus-Bar(L,N)

Inverter 2 AC Input
Parallel line 3 L AC Grid Bus-Bar(L,N)
PV N
AC Input PE Grid
PE
CAN 1 L AC
CAN 2 N
AC Output
Parallel line 2 PE
BAT

DC

Inverter 3
L AC
PV AC Input N
PE AC Output
CAN 1 L AC EPS Bus-Bar(L,N)
CAN 2 AC Output N
PE PE EPS LOAD
BAT

DC

11 12
Inverter 1 Phase L1 Step3. Setup the monitor for the system, add all datalogs in one station. Users can login to the visit interface of
L AC
Grid or Generater monitor system, Configuration->station->Plant Management->add datalog to add the datalogs.
PV AC Input N
PE
Phase L1
CAN 1 L AC Monitor Data Overview Maintain Aspergo User Center

CAN 2 AC Output N EPS


Parallel line 1
BAT
PE Stations
+ Add Station Search by station name

DC Datalogs Plant name Installer End User Country Timezone Daylight saving time Create date Action

1 Genesis Aspergo Install South Africa GMT+2 No 2019-03-14 Plant Management


EPS Bus-Bar(L,N) Inverters
2 Butler Home Elangeni johnbutler South Africa GMT+2 No 2019-03-25 Plant Management
Inverter 2 Phase L2 Users
L AC 3 Office South Africa GMT+2 No 2019-06-03 Plant Management
N Grid or Generater
PV AC Input
Parallel line 3

4 Cronje Home Broomhead cronje GMT+2 No 2019-07-16 Plant Management


PE South Africa

L AC Phase L2
CAN 1
CAN 2 AC Output
N EPS Step4. Enable share battery for the system if the system share one battery bank, otherwise disable the
Parallel line 2 PE
BAT shared battery function
DC
Step5. Set the system as a parallel group in the monitor system

Monitor Data Overview Maintain Aspergo User Center

Inverter 3 Phase L3
L AC Stations Overview Search by inverter SN
Grid or Generater Station Name
PV AC Input
N
PE Device Overview
AC Phase L3 Serial number Status Solar Power Charge Power Discharge Pow Load Solar Yielding Battery Dischar Feed Energy Consumption E Plant name Parallel Action
CAN 1 L
1 0272011008 Normal 228 W 42 W 0W 182 W 215.3 kWh 39.6 kWh 0 kWh 551.2 kWh Dragonview A-1 Parallel
CAN 2 N EPS
AC Output
PE 2 0272011011 35 W 32 W 0W 0W 158.7 kWh 21.1 kWh 0 kWh 160.5 kWh Dragonview A-2 Parallel
BAT
3 0272011012 1 kW 129 W 0W 1 kW 170.3 kWh 49.9 kWh 0 kWh 434.5 kWh Dragonview A-3 Parallel
DC
4 0272011017 79 W 48 W 0W 106 W 99 kWh 85.6 kWh 0 kWh 257.1 kWh Dragonview A-4 Parallel

For more detailed guidance for parallelingsystem, please visit:


https://cellcronic.com/product/ultra-5kw-dual-mppt-hybrid-inverter/
And download theguidance
Step2. Please put the CAN communication PIN to on status for the first and the end inverter
11 00 00 11
ON ON ON ON
1 1 1 1
0 1 2
3
0 1 2
3
0 1 2
3
0 1 2
3 2.9 Power and EPS ON/OFF
No.1 No.2 No.n-1 No.n

MPPT485 WIFI

Parallel Parallel Parallel Parallel Li-ion


4 CAN/RS485
4 4 4 NTC
Dry Port GEN
Parallel line1 Parallel line2 Parallel line(n-1 to n) No2 COM2 Nc2 No1 COM1 Nc1

Parallel line(n to 1)
Parallel BAT+ BAT- PVA PVB AC INPUT AC OUTPUT GEN
The max parallel quantity is 10, so 2<n<10 OFF OFF

ON ON

EPS Output Power

1.Power Switch: Control power supply for the unit

2.EPS Output Switch: Use to control the AC output


After connection, please turn on both switch. Users can turn off the EPS output switch to turn off power
supply in some emergency case
13 14
3. Working modes
3.1 Offgrid modes introduction:
1. AC charge the battery from
AC Input or GEN Input
Bypass Mode AC Charge 2. When the battery is power off,
AC is used to take the load
the AC can wake up the battery
automatically

PV charge the battery while the PV+AC charge the battery


PV+AC charge
PV Charge Bypass AC is from AC Input or GEN Input
AC power the load

NOTE: The output power depends


on the PV energy input, if the PV
energy is unstable, witch will
BAT Grid off Battery is used to take the load influence the output power
PV Grid off

When setting without battery,


the PV can power the load .

PV charge battery and


power the load
PV charge Gridon
PV+BAT Grid off PV+Battery power *The rest power from PV
the load together can feed in Grid

PV+Battery power the load ,


1.When the EPS key off, the
PV+BAT Gridon and the AC can power the load
inverter charge the battery only
if PV+Battery power not enough
PV Charge 2.When the battery is power off,
the PV can wake up the battery
automatically

PV power the load, the rest


PV Gridon
power feed in Grid

PV charge the battery and


PV Charge+Grid off
power the load

15 16
3.2 Working Modes related setting description
Situation Setting 1 Setting 2 Setting 3 Working modes and Description

Off grid mode


if P_Solar>=P_load, solar is used to take load and charge battery
AC abnormal NA NA NA if P_Solar<P_load, solar and battery take the load together, system
will discharge until battery lower than the Cut Off Voltage/SOC

Hybrid Mode 1(charge first)


Solar power will used to charge battery first,
1.The solar power will be used to charge the battery first. AC will take load.
NA 2.if solar power is higher than power need to charge the battery, the
In the AC first time
extra power will used to take load togther with grid
3.If there is still more energy after charge battery and take the load,
it will feed enegry into grid if export to grid function is enabled

Hybrid Mode 1(charge first)+AC charge battery if solar power is


AC charge accroding to Time
not enough to charge battery
PV&AC Take Load
Jointly Enable Enable AC charge and in the AC charge time Hybrid Mode 1(charge first)+AC charge battery if solar power is not
AC charge accroding to enough to charge battery and the battery voltage/SOC is lower than AC
AC normal battery voltage or SOC start charge voltage/SOC, the AC will stop charging when the battery
Voltage/SOC is higher than AC end charge battery voltage/SOC

Hybrid Mode 2(load first)


Solar power will used to take load first,
1. Not in the AC first time and 1.if solar power is lower than load, battery will discharge together to
2. Disable AC charge or not in the AC charge time NA take load until battery lower than EOD voltage/SOC
2.if solar power is higher than load, the extra power will used to charge
battery, if there is still more energy, it will feed into grid if enable export

Bypass Mode
In the AC first time NA
AC will take the load and Solar is used to charge battery

Bypass Mode+AC charge battery


Solar is used to charge battery
AC charge accroding to Time
AC will take load and also charge battery during AC charge time
if solar power is not enough
Enable AC charge and in the AC charge time
PV&AC Take Load Bypass Mode+AC charge battery
Jointly Disable Solar is used to charge battery
AC charge accroding to AC will take load and also charge battery when battery SOC/Volage is
SOC/Battery voltage
lower than start SOC/Voltage, and the AC will stop charging when the
battery Voltage/SOC is higher than AC end charge battery voltage/SOC

Off grid mode


1. Not in the AC first time and if P_Solar>=P_load, solar is used to take load and charge battery
2. Disable AC charge or not in the AC charge time NA if P_Solar<P_load, solar and battery take the load together, system will
discharge until battery lower than EOD Voltage/SOC

17 18
1.ULTRA can work as traditional off grid inverteror as ahybrid inverter. When disable PV&AC 3.1 AC First: During this setting time, system will use AC to take load, use solar power to charge the battery
Take load Jointly, it will work as a traditional off grid inverter, otherwise it will work as a hybrid first. If there is extra solar power, extra solar power will take the load. When out of the setting time, system
Hybrid Setting
will use solar and battery to take load first until the battery voltage/SOC is lower than On Grid EOD settings,
PV&AC Take Load Jointly Enable Disable Discharge Current Limit 300 Set then it will use AC to take the load.

Export to Grid Enable Disable Export Power Percent(%) 0 Set Discharge Setting
Discharge Control According to SC Set

Battery Warning Voltage 44 Set Battery Warning SOC 20 Set


2. Working as a traditional off grid inverter. In this situation, inverter either use (solar+battery) to take load
or use AC take load. Related settings Battery Warning Recovery Voltage 46 Set Battery Warning Recovery SOC 60 Set

Application Setting Discharge Cut-off Voltage 45 Set Discharge Cut-off SOC 15 Set

EPS Voltage Set(V) 230 Set EPS Frequency Set(Hz) 50 Set


On Grid EOD Voltage(V) 56 Set On Grid EOD SOC(%) 30 Set

AC Input Range 0: APL(Utility Range90 Set

AC First
AC first Start Time 1 00 : 00 Set AC first Start Time 2 14 : 30 Set AC first Start Time 3 16 : 30 Set
3.2 Export to Grid/Export Power percent: Users can also enable export function, it is allowed and set export
AC first End Time 1 12 : 00 Set AC first End Time 2 15 : 00 Set AC first End Time 3 16 : 40 Set
power percent
AC Charge

AC Charge According to 8 Set AC Charge Battery Current(A) 30 Set


AC First: During the setting time, system will use AC to take load first, use solar power to charge the battery. Disable
AC Charge Start Time 1 00 : 00 Set to Time AC Charge Start Time 2 00
According : 00 Set AC Charge Start Time 3 16 : 30 Set
If the battery is full, solar power may be wasted. When out of the setting time, system will use battery and According to Battery Voltage when no solar
According
Set to Battery SOC when no solar
solar to take load until battery voltage/SOC is lower than cut off voltage/SOC AC Charge End Time 1 23 : 00 AC Charge End Time 2 00 : 00 Set AC Charge End Time 3 16 : 40 Set

Discharge Setting AC Charge Start Battery Voltage(V) 46.4 Set AC Charge End Battery Voltage(V) 48 Set

Discharge Control According to SC Set AC Charge Start Battery SOC(%) 20 Set AC Charge End Battery SOC(%) 100 Set

Battery Warning Voltage 44 Set Battery Warning SOC 20 Set

Battery Warning Recovery Voltage 46 Set Battery Warning Recovery SOC 60 Set 3.3 AC Charge function Disable: The system will not use AC to charge the battery(except Li ion BMS set
force charge flag )
Discharge Cut-off Voltage 45 Set Discharge Cut-off SOC 15 Set
According to Time: During the setting time, system will use AC to charge the battery until battery full and
On Grid EOD Voltage(V) 56 Set On Grid EOD SOC(%) 30 Set battery will not discharge during the setting time.

According to Battery Voltage: During the setting time, system will use AC to charge the battery if battery

3. Working as a hybrid inverter voltage is lower than AC Charge Start Battery Voltage and will stop when Voltage is higher than AC Charge

Related settings End Battery Voltage. And battery will not discharge during the setting time.

According to Battery SOC: During the setting time, system will use AC to charge the battery if battery SOC
Application Setting
is lower than AC Charge Start Battery SOC and will stop when Voltage is higher than AC Charge End Battery
EPS Voltage Set(V) 230 Set EPS Frequency Set(Hz) 50 Set
SOC. And battery will not discharge during the setting time.
AC Input Range 0: APL(Utility Range90 Set

AC First
AC first Start Time 1 00 : 00 Set AC first Start Time 2 14 : 30 Set AC first Start Time 3 16 : 30 Set

AC first End Time 1 12 : 00 Set AC first End Time 2 15 : 00 Set AC first End Time 3 16 : 40 Set

19 20
4. LCD display and settings No. Description Remarks

4.1 LED Display This area will display the currently time/date by default(year/
month/day/ hour/minute” switching automatically). When press
Generally Information Up or Down buttons, this area will display the firmware version
1
Display Area information, serial number etc. Display the setting selection
LED Indicator Messages
information when entering settings

Solid On Working normal


On-grid solar inverter output This area shows the data of PV voltage, power and the setting
1 Green 2
fast: Warning power and energy data of PV input connection information
Flashing
slow: Firmware update
This area shows the battery type, battery brand(lithium battery),
Fault condition occurs
2 Red Flashing the lead-Acid battery setting of CV voltage, Floating charging
in the inverter 3 Battery information and data
voltage, Cut off voltage, Discharge end voltage . And display the
voltage, SOC and power in turns of period of 1 seconds

There are three type of working status- normal, warning and


1 2 System working status fault, in right side of this area, there are code display, it will
4
/ setting code display different type of code -the system working mode code,
warning code, fault code and setting code

UPS/EPS output When UPS function is enabled, this area will display UPS voltage,
5
information and data frequency, power etc. in turns of periods of 1s

4.2 LCD Display When firmware updating in process, it will display relevant
Programming & the percentage
6 information When in grid off, this area will display the
of AC output power
Percentage of the maximum AC output power

7 Loads consumption Display the power consumption by the loads in on grid model

Display the grid(GRIDA) information of voltage, frequency,


Grid information and
8 input or output power, the Generator (GRIDB) information of
Generator information
voltage, frequency, input power ,switch period of 1s

When make settings on the ULTRA 5000W inverter through the


LCD, this area will display the AC Charge, Force Discharge,
9 Working mode settings area
Charge First option for setting on those working modes. It will
not display those information unless in the setting process.

21 22
4.3 Inverter Status Display 4.4 LCD Settings

Normal status, running status 40 Warning Status, warning 29

There are four buttons on the LCD. Step for settings by


the display:
Step1: After touch Enter button for about 2 seconds ,
the unit will enter setting mode. The setting
icon and index will flashing.
Step2:Touch UP or Down button to select setting index
from 1 to 19.
Step3: Then touch Enter button to set this item
Step4: Touch UP or Down button to change the settings
Step5: Touch Enter to confirm the setting or Return the setting list is as below

Index Description Setting Option

Setting Year/Month/day

1 Date& time Setting hour/minute/second

Default: S
S: two independent
Strings input

2 PV input mode
P:Same string input
for 2 MPPTs

dc: DC source input

23 24
Run with No Battery:
Step1:Choose battery type first, when no flashing,
select Enter to choose Run with No battery
Setting range:
For Lead Acid: ConChr: 50.0-59.0Vdc
Step1:Choose battery type first, when Lead-Acid CV voltage setting Default: 56.4V
7
flashing, select Enter to choose Lead-acid battery (Only in Lead-acid
battery type)
3 Battery Step2:Then choose battery capacity

For Lithium battery


Step1:Choose battery type first, when Li-ion
flashing, select Enter to choose Li-ion battery
Step2:Choose battery brand
0-> Standard Battery 2->Pylon Battery
6->Luxpower protocol Battery 8->Dyness Battery

AC Output voltage Setting range:


FloChr:
208Vac/220Vac/ 50.0-56.0Vdc
Floating charging
230Vac(Default)/240Vac Default: 54.0V
8 voltage setting
(Only in Lead-acid
Off grid Output
battery type)
4 voltage and
frequency AC Output frequency
50Hz (Default)/60Hz

Totoal discharge current setting


Buzzer enable(Default)
Setting range :10A~140A
Default: 110A
Id: Maximum
5 Buzzer enable 9 discharge current
Buzzer Disable

Setting Range:
Totoal charge current setting VOLT/SOC
Ic: Maximum Setting range :10A~140A
TEOd:
charge current Default: 110A 10
Discharge control
6 (utility charge type: VOLT/SOC
current + solar
charge current)

25 26
AC charge setting
(The setting process AC Charge function:
Setting range:
must enable the AC Disable(Default)
VOLT: 40.0-OnGrid EOD Volt
charging function, Enable
Default: 42V
confirm the full (Touch “Enter” button to
CutOFF: battery SOC value, set ac charge parameter )
Cut off Voltage and set the
11 or SOC, depend
SOC: 0-OnGrid EOD SOC confirmation time
on TEOd period 1, 2, 3 to
Default: 15%
truly complete the
AC charging
function setting)
14

Setting range: Setting AC Charge current: Setting AC Charge to battery SOC:


VOLT: Cut off Volt-56V 30A(Default) Range:0%~100%
Default: 42V 40A / 50A / 60A Default:100%
Similar to set time2 and time3
Eod:
12 Discharge end start

voltage or soc with


Setting AC Charge time of 1 start: Setting AC Charge time of 1 end:
grid, depend on start
SOC: Cut off SOC -90 Range:00:00~23:59 Range:00:00~23:59
TEOd
Default: 15% Default:00:00~00:00 Default:00:00~00:00
start
end

Setting time of 1 start:


Range:00:00~23:59
Setting range: Default:00:00~00:00
VOLT: Cut off Volt-56V start

Eod: Default: 42V


Discharge end Setting time of 1 end:
Utility source Range:00:00~23:59
12 voltage or soc with 15 (AC Input) to take Default:00:00~00:00
grid, depend on
Load time setting
TEOd SOC: Cut off SOC -90 end

Default: 15% Similar to set time 2 and time3


start

start

Unity AC Input voltage range :


Setting Range:
90Vac~280Vac
Hybrid Disable (default)

16 Hybrid enable/
AcIn: AC voltage
13 disable
range setting AC Output voltage range :
170Vac~280Vac
Hybrid Enable

27 28
Setting Range:
Setting Range: Green Function Disable
Feed-In Disable (default) (default)
Feed-In
Enable/disable Green Function
Only valid when 20 enable/disable
Hybrid is enabled Feed-In Enable Green Function Enable

16
Parallel type setting
Maximum Feed-In Setting Range: NoPL
Setting Range:0-100%
percent Only valid (not Parallel)/1PH (Single
0% (default)
when Feed-In is phase)/3PH (Three phase)
enabled Power NoPL (default)
percent can be set
21 Parallel setting
larger than 100%
in case of there is
other generating
device in the
system

Battery Wakeup Enable wakeup battery


Parallel phase setting Bat Share enable/disable
17 Enable/disable
Setting Range: P1 ( Rphase)/ P2(Sphase) Setting Range:
(Not for No
/P3(Tphase) Disable (default)
Battery type)
P1 (default) Enable

Setting Range:0-7369W
7369W (default)
Error Record
18 Max Generator ->Record Index
Input Power Power ->>Record Msg:
(Year: Month:Day;
Hour: Min:Sec; Error code)

22 Error/Alarm
Setting Range: Record
PV Off Grid Enable (default)
Alarm Record
->Record Index
19 PV Off Grid
->>Record Msg:
enable/disable
PV Off Grid Disable (Year:Month:Day; Hour:Min:Sec; Alarm code)

29 30
5. Monitor System for Off grid 6. Specifications
Users can use wifi dongle / WLAN dongle / 4G dongle (Avaiblable from 2021 March for some countries) to
monitor theenergystorage system, The monitor website is: www.cellcronic.com Table 1 Line Mode Specifications
The APP is also available in the google play and apple APP store(Scan two code bar to download the APP).
INVERTER MODEL ULTRA 5000W - 48V
Please download the introduction of guidance by website: https//www.cellcornic.com
Document Reference: Input Voltage Waveform Sinusoidal (utility or generator)

1. Wifi Quick Guidance Nominal Input Voltage 230Vac


Quick guidance for setting password for wifi module, the paper is also available in the wifi box
Low Loss Voltage 170Vac±7V (UPS); 90Vac±7V (Appliances)
2.Monitor system setup for Distributors and Monitor system setup for endusers, Monitor system registration,
wifi password setting, and wifi local monitor and setting Low Loss Return Voltage 180Vac±7V (UPS); 100Vac±7V (Appliances)
3.Lux_Monitor_UI_Introduction High Loss Voltage 280Vac±7V
Introduction of monitor interface
High Loss Return Voltage 270Vac±7V
4. WebsiteSettingGuidance
Introduction of website settings for offgrid inverter Max AC Input Voltage 280Vac

Nominal Input Frequency 50Hz / 60Hz (Auto detection)


Local Monitor
Software protect when GridOff discharge
Output Short Circuit Protection
BA 19310175 9532004127 Circuit Breaker protect when GridOn Bypass

Battery Discharging Transfer Time <20ms @ Single <30ms @ Parallel


Solar Yielding
0.0 kWh Output power derating: When AC input voltage Output Power Rated Power 20% Power
0.0 kWh
Today Discharging
+ drops to 170V, the output power will be derated.

300.8 kWh 50.1 kWh


Output Power
Total Discharging
Rated Power

Consumption Charge power derating:


Feed-in Energy
When AC input voltage drops to 170V depending 50% Power
0.0 kWh 0.0 kWh on models, the charge power will be derated.
Input Voltage
Today Export Today Usage
90V 170V 280V
77.1 kWh 255.3 kWh
Total Export Total Usage Output power derating: When AC input voltage Max inv curren: 25A;
drops to 200V, the output power will be derated. Max inv Power: 5kW;

0W Notice
Table 2 Inverter Mode Specifications
0W PV Power
Battery Power
0W Rated Output Power 5KVA/5KW

Output Voltage Waveform Pure Sine Wave

Output Voltage Regulation 208Vac/220Vac/230Vac/240Vac±5%


0W
Output Frequency 50Hz / 60Hz
Battery Level(SOC)

Standby 0W Peak Efficiency 93%


Backup Power(EPS) Consumption
Overload Protection 5s@≥150% load; 10s@110%~150% load

Surge Capacity 2* rated power within 5 seconds


Overview Set
31 32
Battery Voltage Range 46.4V-60V(Li) 38.4V-60V(Lead_Acid) Battery Voltage, per cell Charging Current

High DC Cut-off Voltage 59VDC(Li) 60VDC(Lead_Acid)


2.43Vdc(2.35Vdc) Voltage
High DC Recovery Voltage 57.4VDC(Li) 58VDC(Lead_Acid) 2.25Vdc
100%
load < 20% 44.0Vdc(Settable)

Low DC Warning Voltage 20% ≤ load < 50% Warning Voltage @load < 20% -1.2V Charging Curve

load ≥ 50% Warning Voltage @load < 20% -3.6V 50%


T0 T1
Low DC Warning Return Voltage Low DC Warning Voltage@Different load +2V T1=10*T0, minimun 10mina, maxmum 8hour
Current
load < 20% 42.0Vdc(Settable)
Bulk Absorption Maintenance Time
Low DC Cut-off Voltage 20% ≤ load < 50% Cut-off Voltage @load < 20% -1.2V (Constant Current) (Constant Voltage) (Floating)

load ≥ 50% Cut-off Voltage @load < 20% -3.6V MPPT Solar Charging Mode

Low DC Cut-off Voltage Max. PV Array Power 6400W


Cut-off Voltage@load<20%≥45V
Low DC Cut-off Return Voltage @load<20%+3V
Start-up Voltage 100Vdc±10Vdc
Cut-off Voltage@load<20%<45V 48V PV Array MPPT Voltage Range 120Vdc~385Vdc
Low DC Warning SOC 20% SOC ( Settable )
Max. PV Array Open Circuit Voltage 480Vdc
Low DC Warning Return SOC Low DC Warning SOC +10%
Max. PV Charging Current 110A

Low DC Cut-off SOC 15% SOC (Grid on) ( settable)


Max. Charging Current
15% SOC (Grid off ) ( settable) (AC Charger Plus Solar Charger) 110A

Low DC Cut-off Return SOC Low DC Cut-off SOC +10%


Table 4 General Specifications
Charge Cut-off Voltage 58.4Vdc
INVERTER MODEL ULTRA 5000W-48V
No Load Power Consumption <60W
Safety Certification CE
Table 3 Charge Mode Specifications
Operating Temperature Range 0°C to 50°C
Utility Charging Mode
Storage temperature -15°C~ 60°C
Lead_Acid Battery Charging Algorithm 3-Step
Humidity 5% to 95% Relative Humidity
Max. AC Charging Current 60Amp(@VI/P=230Vac) (Non-condensing)

Flooded Battery 58.4Vdc Altitude <2000m


Bulk Charging Voltage
AGM / Gel Battery 56.4Vdc Dimension(D*W*H) 505*330*135mm

Floating Charging Voltage 54Vdc Net Weight 14.5Kg

33 34
7. Trouble Shooting & Error List
The failures mainly divided into 5 categories, for each category, the behavior is different:

Code Description Trouble shooting Code Description Trouble shooting

E000 Internal communication fault1 Restart inverter, if the error still exist, contact us (DSP&M3) Check if you have choose the right battery brand and
Communication failure
W000 communication cable is right, if the warning still exist,
E002 Bat On Mos Fail Restart inverter, if the error still exist, contact us (DSP&M3) with battery
contact us
E003 CT Fail Restart inverter, if the error still exist, contact us (DSP&M3)
Check battery temperature sensor is right connected
W001 Battery temperature high
CAN communication error Check CAN cable connection is connected to the right and the battery temperature is not too high
E008
in Parallel System COM port
W002 Battery temperature low Check battery temperature sensor is right connected
Check parallel setting for master/Slave part, and the battery temperature is not too low
E009 No master in parallel system
there should be one master in the system
Inverter get battery fault info from battery BMS,
W004 Battery failure restart battery, if the warning still exist,
Check parallel setting for master/Slave part,
E010 Multi master in parallel system contact us or battery manufacture
there should be one master in the system
W008 Software mismatch Please contact cellcronicfor firmwareupdate
Check if AC Connection is same for all inverters in
E011 AC inconsistent in parallel system
parallel system W009 Fan Stuck Check if the fan is OK

Check if the load is short circuit, try to turn off the load W012 Bat On Mos Restart inverter, if the error still exist, contact us
E012 Off grid output short circuit
and restart inverter
W013 Over temperature The temperature is a little bit high inside inverter
E013 UPS reserve current Restart inverter, if the error still exist, contact us
W018 AC Frequency out of range Check AC frequency is in range
Phase Error in three phase Check if the AC connection is right for three phase system,
E015 W025 Battery voltage high Check if battery voltage is in normal range
parallel system there should one at least one inverter in each phase
Check if battery voltage is in normal range, need to
E016 Relay fault Restart inverter, if the error still exist, contact us W026 Battery voltage low
charge the battery if battery voltage is low

E017 Internal communication fault2 Restart inverter, if the error still exist, contact us (DSP&M8)
Check if there is output from the battery and battery
W027 Battery open
E018 Internal communication fault3 Restart inverter, if the error still exist, contact us (DSP&M3) connection with inverter is OK

E019 Bus voltage high Check if PV input voltage is higher than 480V W028 EPS Over load Check if EPS load is too high

E020 EPS connection fault Check if EPS and AC connection is in wrong terminal W029 EPS voltage high Restart inverter, if the error still exist, contact us

Check PV input connection and if PV input voltage is W031 EPS DCV high Restart inverter, if the error still exist, contact us
E021 PV voltage high
higher than 480V

E022 Over current internal Restart inverter, if the error still exist, contact us

E024 PV short Check PV connection

The internal temperature of inverter is too high,


E025 Temperature over range turn off the inverter for 10minutes, restart the inverter,
if the error still exist, contact us

E026 Internal Fault Restart inverter, if the error still exist, contact us (Bus sample)

E031 Internal communication fault4 Restart inverter, if the error still exist, contact us (DSP&M8)

35 36

You might also like