Question Paper Code : 80581
\MINATIONS, APRIL/MAY 2024
B.E/B.Tech. DEGRE
Seventh Semester
Electrical and Electronics Engineering
EE $702 - POWER SYSTEM OPERATION AND CONTROL
(Regulations 2017)
Maximum : 100 marks
Three hours
Answer ALL questions.
10 marks)
PART A—(10 x2
Define the term load curve and load duration curve in power systems.
L
2. State the function of load dispatching centres.
3. control area in power systems.
4. Define the concept of tie-line bias control.
5. Sketch the V—I characteristics of SVC.
6. State the functions of AVR.
7. Define UC problem.
8. State the assumptions made in Economic Dispatch Problem.
9. — State the functions of Energy Control Centres.
10. State the functions of PMU in electric power grid.
PART B — (5 x 13 = 65 marks)
11. (#f A generating station has the following daily load cycle:
Time (Hours): 0-6 6-10 10-12 12-16 16-20 20-24
Load (MW): 40 50 60 50 70 40
Draw the Load Curve and Find @)
G) Maximum Demand (2)
(ii) Units generated per day (3)
(iii) Average Load and (3)
2)
(iv) Load Factor.Sil
14.
of 43MW and a maximum
61.5x10° per annum.
©
rconnected Area-I and Area-2 have the capacity of 2000MW and
The incremental regulation and damping torque
+ for each area on its own base are 02 pu and OS pu,
vady-state change in system frequency from a
rate tie-line power
)
Or
) Two power
power freq
500 MW on system A causes a power tran:
When the tieline is open the frequency of system A is 49 Hz and of
vem B 50 Hz. Determine the values of Ks and Ks.
Explain the Operation and Characteristics of STATCOM for Power
‘Systems Control applications.
Or
GJ Explain the Operation and Characteristics of Static Var Compensator for
Power Systems Control applications.
(2) Describe the Priority List method for Unit Commitment Problem.
Or
(b) Describe the Base point and Partici
Dispatch Problem.
(af Draw the block diagram to show the hardware configuration of a SCADA
for a power system operation and explain the application of SCADA for
power system monitoring and control.
pation factor method for Economic
Or
(>) Explain the role of energy
control centre in the modern power systems
with a neat block diagram.
8038116,
(ay
(b)
PART C —(1 x 15 = 15 marks)
Explain the v
state transition
ious operating states of power system. Also pee the
and control strategies using state transition diagram.
Or
Determine the primary ALFC loop parameters for a control area having
the following data.
Total rated area capacity P= 2000 MW
Normal operating Load P? = 1000 MW
Inertia constant (HA) =5.0s
Regulation R =
@® Find the static frequeney drop for the 2.GW system following a one
Percent load increase, that is, AP, = M = 20MW = 0.01 puMW. (g)
Gi) What would be the frequeney drop if the speed governor loop were
nonexistent or open ? oN