Block D 12
Block D 12
Clinet :
project:SHEAD
Location: Sheraro
SUMMARY
ITEM DESCRIPTION TOTAL AMOUNT
A.SUB STRUCTURE
1 Excavation and earth work 135,016.48
2 Concrete work 88,591.15
3 Masonry work 45,580.25
Sub Total (A) 269,187.88
B. SUPER STRUCTURE
1 Concrete work 162,410.12
2 Block work 170,196.50
3 Carpentry and Joinery work 414,749.16
4 Roofing work 97,821.36
5 Floor and wall Finishing work 14,895.29
6 Painting work 53,406.38
7 Electrical Instalation Err:509
Sub Total (B) Err:509
Total (A + B) Err:509
GRAND TOTAL Err:509
BILL OF QUANTITY AND SPESFICATION
CLIENT: ATO AMANUAL HADUSH TEFERI
PROJECT: BED ROOM
LOCATION : SHERARO
1.4 Back fill under hard core, around foundation wall and
footing column with selected materials & well
compacted at every 20 cm. select material from site. m3 21.714 240 5211.36
Back fill under harde, around foundation wall and
1.5 footing column with selected materials & well
compacted at every 20 cm. select material from out
side the site. m3 124 479.5 59458
Cart away surplus excavated material and deposite at m3 76.875 454.39 34931.23125
1.6 distance not exceeding 2km from site.
25 cm thick basaltic or equivalent stone hard core well m3 68.15 292.6 19940.69
1.7 rolled consolidated and blinded with crushed stone.
5.1 -
a)Diametr 10-12 cm eucalyptus upper & lower,
members of truss. ml 84.00 107.99 9,071.16
b)Diametr 8-10cm eucalyptus vertical &
diagonal truss member ml 4032.00 96.59 389,450.88
5.2 Diametr 8-10cm eucalyptus purlins. ml 168.00 96.59 16,227.12
Total carried to Summary 414,749.16
52.97 4 4.70
52.97 Kg. TOTAL 0.25
0.25
B) Ø 10 mm Deformed bar 1.18 M³
0.00 B) In Top tie beams @ +8
0.00 Kg. TOTAL
AXIS: 1,7
C) Ø 12 mm Deformed bar 0 25.40
390.65 0.40
390.65 Kg. TOTAL 0.40
- M³
D) Ø 14 mm Deformed bar AXIS: A,K
0 60.80
0.00 0.40
0.00 Kg. TOTAL 0.40
- M³
E) Ø 16 mm Deformed bar 3.05 M3 TOTAL
0.00 1.2, Form work
0.00 Kg. TOTAL 10 0.25 A) In elevation columns.
4 3.3
33.00 M
2
F) Ø 20 mm Deformed bar
0.00
0.00 Kg. TOTAL 33.00 M2 TOTAL
g) Ø 24 mm Deformed bar B) Intermidate beams @+ 3.6 & +4.8
0.00
0.00 Kg. TOTAL 2 15.40
3. Masonary 0.75
23.10 M
2
below NGL
2 30.00 2 4.70
0.5 0.75
7.05 M
2
1
30.00 M3 TOTAL B) In Top tie beams @ +8
Above NGL 0 25.40
2 28.00 1.20
0.5 - M2
0.6 16.80 M3 TOTAL 0 60.40
1.20
- M
2
30.15 M2 TOTAL
NO L/W/D QTY DESCRIPITION NO L/W/D QTY DESCRIPITION
1.3, Reinforcement bars.
A) Ø 8 mm Deformed bar
264.43
264.43 Kg. TOTAL
B) Ø 10 mm Deformed bar
0.00
- Kg. TOTAL
C) Ø 12 mm Deformed bar
390.65
390.65 Kg. TOTAL
D) Ø 14 mm Deformed bar
326.16
326.16 Kg. TOTAL
E) Ø 16 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
F) Ø 20 mm Deformed bar
0.00
- Kg. TOTAL
2. BLOCK WORK
2.1, 20*20*40cm thick concrete block
2 15.4
4.7 144.76 M2
4 4.75
4.3 81.70 M2
203.21 M2 TOTAL
4. METAL WORK
3 2 4.1 metal Doors
2.75
16.5 M2
16.5 M2 TOTAL
4.2 metal windows
3 1.5
1.5
6.75 M2
6.75 M2 TOTAL
5. STEEL WORK
4
0 No
5.3 RHS
a. 60*60*3 Diagonal 84.00 M2 TOTAL
25 21.50
5.20 2795
2795.0 kg 6.2 G-28 sheet metal gutter.
b. RHS 60*60*3 Vertical 1 6.00
25 7.00 6.00 ml
5.20 910
0 25.40
910.0 kg - ml
REINFORCEMENT SCHEDULE
FOUNDATION Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0
REINFORCEMENT SCHEDULE
(FOUNDATION COLUMN Reinforcement)
1.30 65 40
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(GRADE BEAM Reinforcement)
TOTAL LENGTH (M) 134.10 0.00 439.92 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 52.97 0.00 390.65 0.00 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(Mesh Reinforcement)
TOTAL LENGTH (M) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUMMARY FOR SUPER STRUCTURE
REINFORCEMENT SCHEDULE
(Elevation Columns Reinforcement)
TOTAL LENGTH (M) 535.33 0.00 0.00 270.00 0.00 0.00 0.00
UNIT WEIGHT (KG/M) 0.395 0.617 0.888 1.21 1.578 2.469 3.556
TOTAL WEIGHT (KG) 211.46 0.00 0.00 326.70 0.00 0.00 0.00
REINFORCEMENT SCHEDULE
(BEAM Reinforcement)