0% found this document useful (0 votes)
85 views3 pages

Ahmed Mohsen OM

Uploaded by

Ahmed Mohsen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views3 pages

Ahmed Mohsen OM

Uploaded by

Ahmed Mohsen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Ahmed Mohsen Metwally

Nationality: Egyptian Date of birth: 16/03/1994


Phone number: (+20) 1111699780 Phone number: (+20) 1028880735
Linkedin: https://www.linkedin.com/in/ahmadmohsen780/ Page
Email: [email protected] |1

Home address: 1st District, Obour City (Egypt)

WORK EXPERIENCE

1. Operation / Maintenance Engineer Tetrapak Section


Obourland for Food Industries [10/2019– Current]

 Reviewed the KPIs report of each line on a daily basis.


 Assisted team members with technical issues or advanced problems with given assignments.
 Supervised Operation staff, ensuring adherence to quality standards and safety protocols.
 Performed maintenance and troubleshooting breakdowns.
 Contributed to preventive and periodic maintenance procedures.
 Maintain production flow: Identify and address any issues that could disrupt production flow,
such as equipment malfunctions, material shortages, or quality control problems.
 Respond to process deviation ,analyzing the root cause, and apply corrective actions.
 Performed maintenance and troubleshooting breakdowns.
 Performed major services and troubleshooting
 Reported the root causes or the containment solutions.
 Performing root cause analysis for quality and safety problems through using fish bone
diagram, why-why analysis, and 6w’s.

2. Intern project planning engineer


PETROJET [05/2019 – 10/2019]
 Prepared daily and weekly status reports about the project workloads.
 Assisted in balance monitoring and work load scheduling.
Tetrapak technical Competence
 Filling Machines (A3 Speed 400v, A3 Speed 500v, A3 Flex 400v)
 Cardboard Packers (CBP 30 400v, CBP30 500v, CBP 32 500v)
 Accumulator (Helix 700v, Helix 800v)
 Tetra Shrink 150v , Tetra Shrink 180v
 SMI pack Shrink

EDUCATION
 BSc in Mechatronics Engineering
[09/2012 – 08/2017]
Faculty of Engineering, Mansoura University.
Final grade: 89% (Very good with honors)
GPA 3.56/4
Trainings
 Tetrapak Training Center [12/2020 – 02/2021]

 Technical Training on Filling Machine A3 Speed 500V


 Technical Training on Cardboard packer 500V
Page
 Technical Training on accumulator Helix 30 800v distribution equipment machine
|2
 (TPM)Total Productive Maintenance
tetra Pak training center [08/2021 – 06/2022]

Courses

 Allen Bradley PLC Training Course:


Elsewedy Automation 01/2024 – 06/2024
 ControlLogix Fundamentals, Maintenance & Troubleshooting (RSLogix5000) (AB-P1)
 NetLinx Industrial Communication Course (EtherNet /IP Network, ControlNet and DeviceNet) (AB-P2)

 ControlLogix Advanced Programming Course (AB-P3)


 Visualization - FactoryTalk (SCADA & HMI) (AB-P4)

 Motion Control Fundamentals and Programming (Ultra & Kinetix) (AB-P5)

 PowerFlex Drives Fundamentals, Configurations & Troubleshooting (AB-P6)

 Lean Six Sigma Green Belt


Arab Academy for Science, Technology & Maritime Transport [01/2024 – current]

 Project Planning and Control Techniques (PRMG010) [2019]


Engineering and Science Services Center, the American University in Cairo

 Projects Bids and Contracts(PRMG080) [2019]


Engineering and Science Services Center, the American University in Cairo

DIGITAL SKILLS

 Allen Bradley Logix/Studio 5000 Maintenance and Troubleshooting

 Primavera P6 Enterprise Project Portfolio Management

 Communication Systems troubleshooting (DeviceNet, ControlNet, Ethernet)

 Siemens TIA Portal V15, win cc.

 General Electric Logic master LM90. (troubleshooting skills)

 Microsoft Office (Excel, Word, PowerPoint).

 Basic knowledge of Python and C programming languages. 


PROJECTS Summary

1. Design and implementation of flow control and monitoring system Team Leader
In particular cheese filling machines there are external pipes to add solidifying ingredients, the problem
that there were huge amount of packs that were not filled correctly and wasted if the external dosing Page
system malfunctioned, so we designed a system to control and monitor the flow of the external added |3
ingredients and stop the machine and generate an alarm before any waste or incorrect filling happens.

2. SMI Pak shrink Machine restoration Team Leader


Presented the cost analysis of replacing vs restoring the machine, assisted the team members in
ordering the spare parts and manufacturing the needed mechanical parts, organized the activities of
team members including the mechanical, electrical and welding teams, handed over the machine on time
and put on service with the minimum start up malfunctions.

3. Installation and Commissioning of a Tetrapak A3 packing and distribution line


assisted in assembling modules in the A3CF filling machine and the distribution equipment, assisted in the
commissioning of the line and get it in service and insure the quality and the sterility of the production.

4. Design and manufacturing a 3D printer (academic graduation project)


In particular, the aim was to design full x y z movement requirements, design a board to hold
all electronic parts, performing software to control all the hardware components and
manufacturing allthose parts.

5. Recycling Plastic Bank Extruder (academic graduation rd project)


Accommodates a variety of input polymer materials specifically designed to extrude virgin and
recycled PET Flakes .

LANGUAGE SKILLS

English language: IELTS band 6

Arabic Language: native

Military Service
Completed: Dec / 2018

References
Available upon Request.

You might also like