Pe6 / Pe7 Palletizing and Wrapping Building: General Notes
Pe6 / Pe7 Palletizing and Wrapping Building: General Notes
Pe6 / Pe7 Palletizing and Wrapping Building: General Notes
GENERAL NOTES
GENERAL NOTES:
NOTE 7 A) ALL INSTRUMENTS ARE PREFIXED BY 137.
NC B) SIZE OF HEADER FOR EACH SINGLE SPRINKLER HEAD SHALL BE 1". SPRINKLER HEAD END CONNECTION IS NPT
AMAO MALE THREADED.
C) HORIZONTAL FIRE WATER HEADER DOWNSTREAM OF SPRINKLER ALARM VALVE SHALL BE FITTED WITH
1"
3"x2" 4"x3" 6"x4" ADEQUATE DRAIN FACILITES. ALL DRAINS SHOWN ON THIS P&ID ARE FOR REFERENCE ONLY. FOR ACTUAL
4300-SZ-DM-660260086-01
2"x1-1/2"
2"x1-1/2"
2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" V
1"x1/2"
CONTRACTOR :
C
1"
DETAIL-"A"
(APPLICABLE FOR ALL SPRINKLER HEADS)
NOTES:
1. PIPE CONNECTION FROM DRAIN VALVE.
2 2
2. WATER ALARM GONG CONNECTED WITH DRAIN VALVE.
3. RETARD CHAMBER.
4. SPRINKLER ALARM VALVE SHALL BE LOCATED OUTSIDE OF BUILDING THEY PROTECT.
5. VENT VALVE SHALL BE LOCATED AT THE HIGHEST ELEVATION ON THE WATER SPRAY HEADER.
6. RISER ON TRANSITION FROM UNDER GROUND PIPING TO ABOVE GROUND PIPING SHALL BE EQUIPPED WITH
CATHODIC PROTECTION ISOLATION KIT AND, WHERE NECESSARY, WITH PROTECTION AGAINST PHYSICAL
DAMAGE. SPECIAL ITEM TAG REFERS TO ISOLATION KIT.
7. INSPECTOR TEST VALVE 1" SHALL BE PROVIDED AT 1200 MM FROM FLOOR LEVEL VALVE SHALL BE
2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" DESIGNED TO SEAL IN CLOSED DIRECTION. AN ALARM TEST CONNECTION NOT LESS THAN 1 IN.
(25 MM) IN DIAMETER, TERMINATING IN A SMOOTH BORE CORROSION RESISTANT ORIFICE,
GIVING A FLOW EQUAL TO OR LESS THAN ONE SPRINKLER OF A TYPE HAVING THE SMALLEST
K-FACTOR INSTALLED ON THE PARTICULAR SYSTEM, SHALL BE PROVIDED TO TEST EACH
WATERFLOW ALARM DEVICE FOR EACH SYSTEM.
V 8. FOR DETAILED FIRE AND GAS LOGICS, REFER TO "CAUSE AND EFFECT MATRIX FOR FIRE AND GAS SYSTEM"
NOTE 5,9 DOC. NO. 137-IS-163-00001.
1" 3"x2" 3"x2" 3"x2" 3"x2" 3"x2" 3"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2"
9. VENT VALVE IS USED DURING THE COMMISSIONING PHASE AND DURING THE REFILLING
OF THE SYSTEM DURING MAINTENANCE, IN ORDER TO REMOVE AIR FROM THE BRANCHES.
2"x1" 3"x2" 4"x3" 6"x4"
3"x2" 4"x3" 6"x4"
3 2"x1-1/2" 3"x1-1/2" 3"x2" 3"x2" 3"x2" 3"x2" 3"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 4"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 6"x2" 3
REFERENCES :
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,
PUX-MR-572-00004 FIRE FIGHTING WATER SPRAY DELUGE / SPRINKLER SYSTEM DATA SHEETS
BGS-MU-200 BOROUGE GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" BGS-MU-201 BOROUGE GENERAL SPECIFICATION WATER SPRAY FIRE PROTECTION SYSTEMS
6"-66-FW-26694-A2AU16-V
P4-PH-567-00002 FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
PUX-PH-581-00009 DELUGE & SPRINKLER SYSTEM TECHNICAL SPECIFICATION.
1002
PU-PH-407-00001 HYDRAULIC CALCULATION UNDERGROUND FIREWATER NETWORK PO, 1-HEXENE AND U&O
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.
KPAH KPAH
PE6 / PE7 PALLETIZING AND WRAPPING BUILDING FGD 137-0-66-01 Fire Water Sprinkler Deluge System 66-SD-13704
2004
4 C 4
128-0-77-01 Open Drains
KPG
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).
V 2005
KPSH
NOTE 2
2004
C
1/4" T
V
NOTE 4 KAV
NOTE 3
1/2" 2002
NC
NC
V NOTE 1
1/4" T
2"
C
FML LO KPG
2006
5 5
6"-66-FW-26707-A2AU16-V
1002
NOTE 6
AG UG
UNIT 66 UNIT 65 FIRE WATER
8"-66-FW-26717-A2AU16-V 8"-65-FW-26213-A2AU16-B
66-PP-152-260086-02 26755 65-PP-152-260001-03 26749
1002 1002
FROM FIREWATER P 23-Mar-2023 APPROVED FOR DESIGN A.Waykole C.Balsano/S.Naik/
R.Santangelo/A.Pirani R.Soldinger
UNDERGROUND
L 19-Oct-2022 ISSUED FOR COMPANY REVIEW A.Waykole T.Rossi/S.Soni/
R.Santangelo/A.Pirani T.Rossi