Area 2 - Distillation Structure: General Notes
Area 2 - Distillation Structure: General Notes
Area 2 - Distillation Structure: General Notes
GENERAL NOTES
V
1 1
NOTE 2, 8
4300-SZ-DM-650260010
Q
125-0-65-01 Fire Water Underground for 1-Hexene (Process Area)
C
1-1/2" V
1-1/2"
1-1/2"
1-1/2"
LO LO LO
65-PP-152-260010
Q
NOTE 1 NOTE 1 NOTE 1
4"x1-1/2"
C 125-0-65-02 Fire Water Hose Reels for 1-Hexene Plant
2-1/2" Q Q Q
C V
4"-65-FW-26645-A2RU16-V EL. + 146.600 125-0-65-03 Dry Risers for 1-Hexene Plant
CONTRACTOR :
4" 4"
125-SF-0112
1-1/2"
1-1/2"
1-1/2"
BOROUGE :
1003 NOTE 4
2-1/2"
2-1/2"
V C
EL. + 141.700
125-SF-0122 4" 4" 2-1/2" NOTES:
NOTE 4 Q C V
Q FIRE WATER 1) VALVE SHALL BE LOCATED AT ACCESIBLE LOCATION.
EL. + 136.700 NOTE 1 4"-65-FW-26655-A2AU16-V NOTE 1 4"-65-FW-26395-A2AU16-B
4" 4" 2) AUTOMATIC VENT.
125-SF-0110 65-PP-152-260009-01 24046
2-1/2" NOTE 6
Q
NOTE 4 NO 1002 NO 1002
FIRE WATER NETWORK 3) TWO WAY FLAPPER VALVE INSTALLED AT GROUND FLOOR AT A HEIGHT OF 0.8M ABOVE FINISHED GROUND
Q AG UG LEVEL AND EASILY ACCESSIBLE BY FIRE FIGHTING PERSONNEL FOR QUICK CONNECTION
2 3/4" NOTE 1 2
2-1/2"
2-1/2" 4) VALVED CONNECTION FOR DRY RISER ARE EQUIPPED WITH PRESSURE REDUCING VALVE.
D
5) EACH RISER CONNECTION POINT TO BE CLEARLY LABELED TO IDENTIFY THE FIRE ZONE AND CORRESPONDING
V C EQUIPMENT COVERED BY THE RISER.
EL. + 132.700 4" 6) RISER ON TRANSITION FROM UNDER GROUND PIPING TO ABOVE GROUND PIPING SHALL BE EQUIPPED WITH
4"
125-SF-0109 2-1/2" PROTECTION FROM PHYSICAL DAMAGE, WHERE NECESSARY, AND ISOLATION KIT.
1-1/2"
1-1/2"
1-1/2"
1-1/2"
NOTE 4 Q Q C V 7) A SLOPE OF 1:200 FOR HORIZONTAL PIPES SHALL BE PROVIDED.
4" 4" EL. + 127.200 8) ARV SHALL BE INSTALED MIN 3 M ABOVE PLATFORM LEVEL
2-1/2" 125-SF-0108
NOTE 4 Q Q
Q
4"-65-FW-26656-A2AU16-V
2-1/2"
Q
2-1/2" 125-SK-0012 125-SK-0004 Q Q
1-1/2"
1-1/2"
1-1/2"
1-1/2"
LO LO LO LO
V C NOTE 1 NOTE 1 NOTE 1 NOTE 1
1002
EL. + 121.200 4" 4"
C
125-SF-0107 2-1/2"
NOTE 4 Q
Q C V
V
V
V
4" 4" EL. + 117.000
2-1/2" 125-SF-0106
NOTE 4
REFERENCES:
C
C
Q Q
1-1/2"
1-1/2"
2-1/2" LO LO FOR GENERAL NOTES AND REFERENCES SEE DWG. FROM PU-PP-152-01000-01÷15
3 NOTE 1 NOTE 1 PIPING AND INSTRUMENTATION DIAGRAM-SYMBOLS, ABBREVIATIONS AND NOTES. 3
2-1/2" 125-SK-0007 125-SK-0014 125-SK-0009 125-SK-0011 BGS-MU-200 : GENERAL SPECIFICATION FIRE PROTECTION DESIGN PHILOSOPHY
Q V C Q Q P4-PH-567-0002 : FIRE FIGHTING GENERAL SPECIFICATION PO & 1-HEXENE PLANT
EL. + 111.200 DS-PUX-572-SF-00003 : FIRE FIGHTING NETWORK EQUIPMENT AND ACCESSORIES DATA SHEETS
THIS INFORMATION IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN WHOLE OR IN PART TO ANYONE OUTSIDE OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) AND ITS SUBSIDIARIES,
4" 4" 1-1/2" 65-PP-152-260009-01 : P&ID UNIT 65 FIRE WATER NETWORK 1-HEXENE PLANT SHEET 1 OF 2
125-SF-0105 2-1/2" 1-1/2"
NOTE 4 NOTE 7
AREA 3-RECYCLE COMPRESSOR STRUCTUE 125-PH-203-00001 : HSE EQUIPMENT AND ESCAPE ROUTES LAYOUT HEXENE-1-UNIT 125 OVERALL PLAN AT EL.102.500
1-1/2"
1-1/2"
Q C V Q LO 125-PH-203-20001 : HSE EQUIPMENT AND ESCAPE ROUTES LAYOUT HEXENE-1-UNIT 125 REACTOR FROM EL. 112.000
NOTE 1 Q AND ABOVE
EL. + 107.700 125-SK-0015 Q NOTE 2, 8
2-1/2" 4" 4" Q 125-PH-203-20002 : HSE EQUIPMENT AND ESCAPE ROUTES LAYOUT HEXENE-1-UNIT 125 DISTILLATION PLAN FROM
125-SF-0111
Q EL. 110.500 TO EL. 141.000
NOTE 4 C V 1-1/2" V
Q 125-PH-203-20003 : HSE EQUIPMENT AND ESCAPE ROUTES LAYOUT HEXENE-1-UNIT 125 DISTILLATION PLAN FROM
EL. 141.000 & ABOVE
125-SK-0005 Q C 125-PH-203-50001 : HSE EQUIPMENT AND ESCAPE ROUTES LAYOUT HEXENE-1-UNIT 125 CYCLOHEXANE LOADING AND
THIS DOCUMENT CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE) OR ANY OF ITS LICENSORS.
2-1/2" 4"x1-1/2"
1-1/2" 1-1/2" TANKS PLAN
2-1/2" C
Q 4"-65-FW-26642-A2RU16-V
EL. + 103.300 LO 2-1/2" Q
V 2"x1-1/2" 4"x2" 1003
125-SR-0001 NOTE 1 2-1/2"
NOTE 3, 5 Q NOTE 7 C V
V C 4" 4" EL. + 111.200
C V 125-SF-0116
125-SK-0013 125-SK-0002 EL. + 106.200 4" NOTE 4
4" Q
125-SF-0115
NOTE 4
NO NOTE 1 2-1/2"
4 2-1/2" 4
EXCEPT PURSUANT TO A WRITTEN AGREEMENT WITH ABU DHABI POLYMERS COMPANY LIMITED (BOROUGE).
125-SK-0003
1-1/2" 2-1/2" C
1-1/2"
AREA 2 - REACTOR STRUCTURE
C
Q EL. + 103.300
LO V
1-1/2"
1-1/2"
LO LO 125-SR-0003
NOTE 1 NOTE 1 NOTE 1 NOTE 3, 5
NOTE 2, 8
Q Q Q
Q Q
C V
1-1/2" V AREA 1 - TEAL INJECTION PACKAGE STRUCTUE AREA 3 - ETHYLENE DRYER STRUCTUE Q
C TR-TCMS-NSH-P01451
1-1/2"
1-1/2"
2-1/2" Q 125-SF-0114
V C 2-1/2"
Q V C NOTE 4
AG
125-SF-0113
4"-65-FW-26381-A2AU16-B
Q NOTE 4 2-1/2" By By
Q NOTE 4
Q ABU DHABI POLYMERS COMPANY LIMITED
(BOROUGE)
2-1/2"
2-1/2" 2-1/2" C
2-1/2" C EL. + 103.300 PETROCHEMICALS PROJECT
2-1/2" C V
EL. + 103.300 125-SR-0005
24350 65-PP-152-260009-01