Sooraj Bhan-1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Sooraj Bhan

SR. QS Engineer

OBJECTIVE
Ambitious and self-motivated individual with near about 8 years
of professional experience, excellent knowledge of infrastructure;
Road Construction. To be placed in a company in which I can use
my technical skills and leader ship quality for the upliftment of the
CONTACT company and to the personal growth.

+91-94663 88380
+91-94163 88380 ABILITIES
[email protected] As a Civil Engineer possessing near about 8 years of experience
in, Project Coordination, Team Management, Resource
Hisar, Haryana-125052 Management, in Structure and Highway with emphasis on
following fields:
 Flexible/Rigid Pavement, Sub-base, Base, Earthwork.
SKILLS
 Box/Pipe Culvert, VUP, Retaining Wall, RE Wall, Toll Plaza
PQC, Crash Barrier, Friction Slab, W-Metal Beam Crash
Execution
Barrier.
80%
Highway  Professional in Building Design at CADD
70%  Centre Training Services, Noida
Structure
60%
AutoCAD
80% EDUCTION
CalQuan Secured First Class with Distinction in Bachelor of Technology
60% in Civil Engineering with in Dec-2015, from Durgawati Devi
Revit Architecture
50% Institute of Management.
Microsoft Office
75%  45 Days vocational training at PWD B & R, HISAR.

TECHNICAL SKILLS
 Familiarity with Auto CAD and related applications

LANGUAGES  Proficient in MS Word, Excel Publisher and PowerPoint

 Vast understanding of civil and highway engineering concepts.


English
 Understanding of ERP Uses.
Hindi
WORK EXPERIENCE
Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500
(Indapur), Design Length 42.131 km and One time improvement of
selected stretches (Package–II) in the State of Maharashtra under
Bharatmala Pariyojna
PROJECT-4
R.S. Kamthe Infrastructure  Experience in Preparation of Bar Bending Schedule of Box Culverts,
Developers Pvt. Ltd Minor Bridge, Drain etc
 Responsible for raise RFI and maintain Strip Chart
Sr. Quantity Surveyor
accordance to work progress and approved RFI’s.
JULY 2021–PRESENT  Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
 B.O.Q Preparation of civil works as per Approved Drawings.
 Over all responsible for Preparation and checking of R.A. bill & Final
bill, contractor’s bills
 Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
 Daily feedback to the Project Manager regarding progress and lacking
of progress if any
 Preparation of execution of Road drawings, layouts in AutoCAD
 Maintain the daily work progress report & preparation of monthly and
weekly progress review reports.
 Preparation / Identification of extra items
 Checking, processing and following up of contractor’s bill for smooth
functioning of the work
 All activity gets checked by Client according to RFI
PROJECT-3
Raj Infrastructure Development
India Pvt. Ltd Improvement to Section of SH-13 from NH-6 at Ajang To Ambode,
Nawalnagar, Satarne, Vishwanath, Kapadne, NH-3 Sarwad, Nandane,
Quantity Surveyor Burzad, Lamkani, Nijampur, Bramhanwel, Kondaibari to NH-6 Road
JUNE 2021 - JULY 2021 Sh-13 Km. 0/00 To 106/350 (NH-3 Sarwad Junction to Bramhanwel Sh-
7 Junction) [Section 32+245 To Km 97+600 (63.94 Km)] in the state of
Maharashtra Under MRIP on Hybrid Annuity Mode
 Preparation of cross sections and quantity calculation by using the
CalQuan software.
 Experience in Preparation of Bar Bending Schedule of Box Culverts,
Minor Bridge, Drain etc
 Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
 Over all responsible for Preparation and checking of R.A. bill & Final
bill, contractor’s bills
 Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
 Daily feedback to the Project Manager regarding progress and lacking
of progress if any
 Preparation of execution of Road drawings, layouts in AutoCAD
 Maintain the daily work progress report & preparation of monthly and
weekly progress review reports.
 Preparation / Identification of extra items
 Coordination with all departments regarding work progress, Design &
Drawing etc.
 Checking, processing and following up of contractor’s bill for smooth
functioning of the work
 All activity gets checked by Client according to RFI
PROJECT-2 Widening to two lanes with paved shoulders from Km 4/400 to 56/00
Raj Infrastructure Development (50.525 Km) of NH-218 Bijapur - Hubli section in the state of
India Pvt. Ltd Karnataka” through an Engineering, Procurement and Construction
(EPC) Contract”.
Asst. Quantity Surveyor
 Review Drawings and to check whether drawings are according to
JULY 2018 – JUNE 2019 design and to remove discrepancy if any.
 Preparation and checking of R.A. bill & Final bill, contractor’s bills of
civil works as per Approved Drawings.
 Study of drawings and raisings RFIs and getting approval of RFIs for
the pavement layers with the consultant
 Daily feedback to the Project Manager regarding progress and lacking
of progress if any
 Detailed study of plan and profile drawings, Identifying the baking and
cutting stretches
 Preparation of Embankment Layers accurately layer by layer with well
compaction
 Preparation of drawing layouts and execution of Road drawings using
AutoCAD system
 Maintain the Daily progress report and work progress report
PROJECT-1
Abbott Infratech Pvt. Ltd.
New Chandigarh Mega Project & New Chandigarh Papda Project
Quantity Surveyor Development (Roads / Land Development/ Storm Water Drainage
JANUARY 2016 - JUNE 2018 System/ Water Supply / Sewage Supply System/ Utilities & Real estate)
 Coordination with all departments regarding work progress, Bill,
Design & Drawing etc related with Road Work.
 Used AutoCAD to generate existing and proposed site plans.
 Prepare and maintain maps, drawings, engineering records and files.
HOBBIES
 Site execution work earthwork of Road, side drain sub-grade, laying
of GSB, WMM, DBM, BC & fixing of kerb stone, channel and paver
blocks.
 Execution of Infrastructure Works, Sewer line(200mm-300mm) dia,
Storm water line (400mm-1000mm) dia, manhole, water supply line
and Hard landscaping services.
 Electrical line corridor- Construction of electrical crossings with
different dia RCC pipes, including various types road crossings,
manhole, civil works for feeder pillar and backfilling of service
corridor.
KNOWLEDGE  Water supply and sewerage line- laying of MDPE / DI pipes ranging
o MORTH from 25 mm dia to 200 mm dia for water and RCC/SW pipes for
SPECIFICATIONS sewer line including manhole, crossings and testing the services.
o IRC & IS CODES  Total supervision of work at site, RCC, Brick works, plaster,
SPECIFICATION Manpower etc.
o AUTO CAD;  Project monitoring for progress and schedule, complete site
o MICROSOFT OFFICE management of contractor including review of daily progress report,
weekly progress report, monitoring of daily machineries deployment
schedule.

DECLARATION:
I hereby declare that the above information is true and correct to the best of my knowledge and belief.

Sooraj Bhan

You might also like