DOI: https://doi.org/10.48009/3_iis_2021_298-316
Abstract
As disruptive technologies and innovations continue to develop, the resulting change forces organizations
to consider adopting an agile mindset to move quickly. With an emphasis on an iterative and changing
project approach characterized by daily reactivity, communication, and flexibility, the Agile Project
Management (APM) approach is evolving to manage high uncertainty projects. A literature search was
conducted on the following academic databases: ABI/Inform, ACM Digital Library, EBSCO Host, and
IEEE Xplore. “Agile” and “project management” keywords were specified for the English language, peer-
reviewed articles published between January 2015 and March 2021 to answer the research question “How
agile is agile project management?” The findings of the study provide contributions to research and
practice on the state of evolution of APM.
Keywords: agile, agile project management, systematic literature review, agile software development, and
traditional project management
Introduction
As disruptive technologies and innovations continue, the resulting change forces organizations to consider
adopting an agile mindset (Project Management Institute & Agile Alliance, 2017). Organizations adopting
agile mindsets focus on an iterative and changing project approach characterized by daily reactivity,
communication, and flexibility. In a business environment characterized by rapid change and increasing
complexity, companies struggle to implement the strategies they need to generate and sustain
a competitive advantage (Boston Consulting Group, 2016). Agility should not be seen as a lack of process;
it provides the ability to adapt to diverse and unexpected situations (Santana Furtado Soares & de Lemos
Meira, 2015).
Agile Project Management (APM) is defined as an iterative approach that promotes customer inclusion,
adjusts to change, and develops a working product (Project Management Institute & Agile Alliance, 2017).
This approach influences how high uncertainty projects which have high rates of change, complexity, and
risk are managed. The aforementioned characteristics can present problems for the Traditional Project
Management (TPM) approach. TPM is based on the sequential conception and is driven by fully defined
requirements and deliverables (Project Management Institute, 2017a). The focus on the ‘Iron Triangle
Trap’ identifies time, cost, and scope issues, but does not identify the additional analysis required to identify
the issues (Wiboonrat, 2016).
278
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Consequently, as more definable work is automated, project teams are undertaking more high-uncertainty
work projects that require agile methods (Sanchez et al., 2019). These methods explore feasibility in short
cycles and quickly adapt based on evaluation and feedback. Therefore, the Agile Manifesto
(http://agilemanifeso.org) was created and provides an approach for high uncertainty work. It utilizes the
four values of 1.) Individuals and interactions over processes and tools, 2.) Working software over
comprehensive documentation, 3.) Customer collaboration over contract negotiation, and 4.) Responding
to change over following a plan (Project Management Institute & Agile Alliance, 2017).
APM corresponds to a mindset driven by values and principles. Its popularity has increased due to its results
on software quality and customer satisfaction. This has had an immediate impact on the job title of project
managers. They exist on a significant number of agile projects, and they play the role of mentor,
coordinator, negotiator, and process adapter (Shastri et al., 2021). Previous literature reviews have
investigated improving business processes using an agile methodology (Schmitt & Hörner, 2021), the
comparison of agile and waterfall project management methodologies (Thesing et al., 2021), and the
adoption drivers and critical success factors of agile project management (Noteboom et al., 2021). However,
previous reviews did not address the agility of APM.
This study uses the four values of agile to classify the literature to discover whether APM is truly agile.
Therefore, this study contributes to the body of knowledge on APM by offering guidance to project
practitioners and researchers on the current state of agility by investigating the extant literature on 'How
agile is Agile Project Management?' with comparison to the four Values of the Agile Manifesto.
Theoretically, the study contributes to the evolution of APM to manage high-uncertainty projects by
evaluating the literature for insight. The study also provides direction on the continued development of
APM to support agile methods and high-uncertainty work for the practitioner. The study provides a
theoretical background next, the research methodology is presented in the following section, the study
results to follow, and a discussion of findings. The article will conclude with a summary of findings and
implications for research and practice.
Background
The 14th Annual State of Agile Report (2020) reported the ability to manage changing priorities and project
visibility as the top two capabilities of Agile implementation. However, there are still adoption challenges
that continue to be related to organizational culture and resistance to change (14th Annual State of Agile
Report, 2020). According to the report, the top reasons for adopting agile were accelerated software
delivery, enhancing the ability to manage changing priorities, and increasing productivity. 84% of
respondents indicated that they were below a high level of competency with Agile. This indicates an
opportunity and the need for the improvement and development of APM.
Conboy (2009) provides a definition of agile that is widely cited, “the continual readiness of an information
system development method to rapidly or inherently create change, proactively or reactively embrace
change, and learn from change while contributing to perceived customer value (economy, quality, and
simplicity), through its collective components and relationships with its environment.” Organizations
achieve greater agility through attention to people, processes, and culture (Project Management Institute,
2017b). In an agile approach, basic outcomes are defined, initial targets are established, and the project
outcomes are consistently revisited and further refined using an adaptive process (Gemino et al., 2021). The
traditional approach is defined by linear and predictable project planning
practices designed to achieve a well-understood, achievable set
of objectives (Gemino et al., 2021). There is also a third approach defined as a hybrid approach that
combines both traditional and agile practices as described above (Gemino et al., 2021).
279
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
The Agile Manifesto and mindset have four values: Individuals and interactions over processes and tools;
Working software over comprehensive documentation; Customer collaboration over contract
negotiation, and Responding to change over following a plan (Project Management Institute & Agile
Alliance, 2017). The bolded areas are valued over the other items. The values shown in Figure 1 will be
used to classify the literature.
Methodology
This review employs the software engineering guidelines for performing and reporting systematic literature
reviews (SLRs). The guidelines, as proposed by Kitchenham and Charters (2007), are a common method
for conducting SLRs in software engineering and IS research. It offers a standardized and replicable
approach to evaluating and interpreting extant literature pertaining to the research question. The current
review uses this approach to summarize existing literature to identify the current position and gaps on agile
as a project management methodology. The ensuing section describes the three main phases of the current
review in accordance with the guidelines: planning, conducting, and reporting the study.
Review Planning
This process involves identifying the need for the review, commissioning the review, and specifying the
research question. The introduction and background sections establish these components.
Research identification
Following the formulation of the research questions, the current following search query was developed to
gather relevant literature from ABI/Inform, ACM Digital Library, EBSCO Host, and IEEE Xplore
databases: "Agile" AND "Project Management". In collating the relevant articles for the review, English
language articles published in journals, books, or conference papers between January 2015 and March 2021
were sourced for the four values of the agile manifesto.
280
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Results
Study Selection
The identification process resulted in the selection of 376 records from the initial electronic database search.
Duplicate records (36) were removed and 340 records were moved to the screening process. The exclusion
criteria removed 235 records and 105 records met eligibility criteria for full record review. An additional
36 records were excluded during the full article review and 69 records were included for analysis in the
study. A summary of search and study selection results is presented in Figure 2.
281
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Publication Statistics
The APM paper distribution by year indicates peaks and valleys during the collection periods. The low
occurrence of publications was in 2018 with six. The peak number of 16 articles occurred in 2019. As
displayed in Figure 3, there does not appear to be a trend in the number of publications per year. Figure 4
demonstrates the publication statistics by type of publication. Journal articles account for 68% of the
publications and peer-reviewed conference papers comprise 27.5% of the included results.
Case study and survey research were the most frequently mentioned study design components. The included
articles provided insight into a variety of investigative approaches to understanding APM as shown in
Figure 5.
Total
47
19
282
Information Technology Ethics: A Research Framework
30
26
25
19
20
15
10 7
4 4
5 2
1 1 1 1 1 1 1
0
Total
The articles that discussed APM were the highest at 74%. There were much fewer articles discussing a
hybrid PM approach at 25%. These statistics are shown in Figure 6.
1%
25%
APM
Hybrid
None
74%
Table 1 lists the fully categorized articles with their respective PM style, and which agile value they have
met. All articles listed below were the included articles of our study. The citations list the authors and the
year each article was published. The PM style discusses which type of approach each author studied. The
following four columns focus on whether each article met one or more of the four agile values. Each x
details whether that value was met in the study. At the bottom of Table 1, the count of each agile value is
displayed.
283
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
284
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Discussion
To answer our research question, how agile is agile project management? Our study indicates APM is agile
as defined by the classification scheme shown in Figure 1. The four values of APM agility were present in
38 of the 69 articles. 11 articles contained three of the values and 13 articles referenced two of the values.
One value was present in eight articles and one article failed to mention any value. In the following section,
we discuss the findings on APM agility from the literature review with a discussion on each value.
285
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
However, there are areas for improvement for APM. A trade-off between the short-term benefit of rapid
delivery and an increase in unplanned technical debt from quick agile responses may result in major
consequences if that the debt is forgotten and grows up to become a liability for the system maintainability
and scalability (Salaou et al., 2021). This also can cause teams to focus less on tools and processes. This
can consequently cause teams to neglect or minimize the importance of documentation.
Responding to Change
This systematic literature review suggested that 77% of research projects used adaptiveness to change in
their studies. Companies are faced with spontaneous market changes and they often have to shorten the
software product delivery and be more responsive to the customers’ demands (Olteanu, 2018). Customer’s
changing opinions on features increase the cost of updating artifacts under TPM and the impact on each
phase of the project as well as drive down customer satisfaction (Andrei et al., 2019). Understanding and
being adaptive to change enables managing agile projects more effectively and allowing for flexible
requirements. An exploratory study was completed by Pareilya (2019) showing that 41% of agile users
thought being adaptive to change was extremely important. 45% claimed in the Pareilya study that
adaptiveness to change is very important. In sum, 86% of the users thought that being adaptive to change
is important. 76.8% of the articles reviewed in this study implemented the response to change principle.
Adapting to change as an agility principle enables project management teams to react to or mitigate risks
that may cause going over budget, delays in implementation, and producing a different solution than
expected (Kaczorowska, 2015; Serrador & Pinto, 2015). In most cases, being adaptive to change helps
mitigate many barriers associated with the traditional project management style. For example, a project
team could benefit from continuous discussion (Andrei et al., 2019), maintain flow during the
transformation process (Fitriani et al., 2021), and understanding the importance of an agile project manager
(Hoda & Murugesan, 2016).
One of the key areas that responding to change comes into play is in regard to requirements. Agility is
defined by adapting to new conditions (Şarlak, 2020). Agile is a preferred approach when project
stakeholders expect significant changes in requirements (Gemino et al., 2021). Requirements change in
Performance Management Systems, like all systems, is inevitable, and agile is a methodological way to
respond to that change (Stormi et al., 2019). Another key to responding to change identified by Stormi,
Lain & Korhonen (2019) is adopting iterative and incremental work practices which support resilience in
the face of dynamic requirements. Finally, Gemino et al. (2021) point out that the team attitude toward
change is an important success indicator for projects embracing agile practices.
286
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Customer Collaboration
Law and Larusdottir (2015) summarize the definition of a customer as someone, company, or individual
that receives a product or service. Khomyakov et al. (2020) note that both plan-based and agile
organizations place a high priority on customer collaboration and customer satisfaction. In agile practices,
such as Scrum, the Product Owner is the representative of the customer and may pull in customers as needed
throughout the life of the project (Schwaber & Sutherland, 2011). Shastri et al. (2017) describe the
traditional project manager’s role with customers as one of negotiating requirements. Consequently, in a
hybrid approach, to gain the maximum benefit, it will be necessary to expand the traditional role to enhance
customer collaboration.
Working Software
Generally, it is accepted that APM evolved from software development practices and is predicated upon
incremental product delivery which grew from a rising need for faster yet adaptable software release cycles
(Highsmith & Cockburn, 2001). Rather than the top-heavy comprehensive documentation that characterizes
traditional project management, Zhang et al., (2020) found that reduced communication overheads,
increased concurrency, and increased personal ability created the right conditions for small self-organizing
teams to realize increased productivity and innovation towards systems creation. This effect was not limited
to small-scale software development teams. In large multiteam development where documentation is
generally required and advised, the literature demonstrated that upfront documentation came in the form of
intra- and cross-team expectations written in wikis. Additional documentation during and at the end of the
project was ensured through the iterative unit, functional, and integration tests (Marinho et al., 2019).
Further, progress towards working software was often achieved through multi-level coordination of
resources from impersonal modes, such as through instant messaging, to group modes, such as scrum of
scrums and frequent demos (Dingsøyr et al., 2018; Hobbs & Petit, 2017; Sievi-Korte et al., 2015).
Instinctively, APM as a project management practice is popular in software development cycles. The
current study found that in the context of APM, the idea of working software over comprehensive
documentation – as enshrined in the Agile Manifesto – transcends its literal meaning. Several studies found
ways to implement APM outside of software development cycles. Mirzaei & Mabin (2017) demonstrated
that achieving cadence and delivering incremental value through APM was viable for public sector policy
development. The current study found several such applications of APM resulted in the iterative delivery
of “working software” in various non-software industries such as real estate, electrical engineering, and
even disaster management (Baham et al., 2017; Fitriani et al., 2021; Gheorghe et al., 2017; Pareliya, 2019;
Vahanvati & Mulligan, 2017). From APM’s starting point in 2001, there has been constant hope and support
for the move to agility. As the pace of technology adoption continues to increase, the need to respond
quickly becomes paramount. APM will continue to evolve to meet additional demand.
Limitations
One of the limitations of this research is that more breadth than depth was covered. This study considered
four agile values that are broad in nature. There are twelve principles of agile studies that could be applied
to a similar research project to get a more in-depth view of the current state of research. We also cannot
claim that this was an exhaustive search of research articles. The coding of the results from the literature as
system reviews is also threatened by misclassification. This was minimized by having two authors code the
studies with input from the other two authors to resolve any issues with the classification. Another limitation
is the use of academic subscription databases as our only source. Since APM is practical, including only
peer-reviewed articles may have unintentionally biased this study toward the academic settings by ignoring
periodicals and professional publications such as PMI.
287
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Although 74% of articles were classified as agile we do recognize that some papers and studies were single
value-focused. Although they do not touch on all four values, we felt they contributed to the agility of APM
overall.
As technology innovation is expected to accelerate, our study investigated the literature to determine how
agile is APM? The evidence shows that APM is making strides towards becoming agile. There is still some
work to do before APM becomes truly agile. Authors must continue to address agility using the four
principles to ensure they are using APM and not claiming agility through a hybrid style. The study analyzed
and evaluated 69 articles to assess the agility of APM as measured by the existence of the four agile
values. The need for APM to continue to evolve and contribute to the success of high-uncertainty work
will continue to grow.
Future research could focus on a more in-depth review of the twelve principles of agile studies. This would
provide a more granular view on APM research to analyze how rigorous the agile methodology is being
applied. Researchers could also conduct a qualitative or quantitative study on APM implementing the four
values. From a qualitative perspective, a researcher could better understand APM and its application in
information systems projects. A quantitative study could analyze relationships and investigate how each
value could impact project success in an agile information systems project. Further, a framework could be
developed by researchers to guide project management practitioners to make sure they are addressing each
agile value when applying an agile methodology. Finally, researchers could investigate ways to optimize
APM for high-uncertainty work within high-growth technologies. Examples include but are not limited to
artificial intelligence, cloud technologies, big data, and analytics.
References
Alahyari, H., Horkoff, J., Matsson, O., & Egenvall, K. (2018). What Do Agile Teams Find Important for
Their Success? 2018 25th Asia-Pacific Software Engineering Conference (APSEC), 474–483.
https://doi.org/10.1109/APSEC.2018.00062
Alsari, A., Qureshi, R., & Algarni, A. (2020). Agile Framework To Transform Traditional Team. 2020
IEEE Frontiers in Education Conference (FIE), 1–9.
https://doi.org/10.1109/FIE44824.2020.9274240
Andrei, B.-A., Casu-Pop, A.-C., Gheorghe, S.-C., & Boiangiu, C.-A. (2019). A Study On Using Waterfall
And Agile Methods In Software Project Management. Journal of Information Systems &
Operations Management, 125–135. ABI/INFORM Collection.
Azanha, A., Ana Rita Tiradentes Terra Argoud, João Batista de Camargo Junior, & Pedro Domingos
Antoniolli. (2017). Agile project management with Scrum. International Journal of Managing
Projects in Business, 10(1), 121–142. ABI/INFORM Collection. https://doi.org/10.1108/IJMPB-
06-2016-0054
Baham, C., Hirschheim, R., Calderon, A. A., & Kisekka, V. (2017). An Agile Methodology for the Disaster
Recovery of Information Systems Under Catastrophic Scenarios. Journal of Management
Information Systems, 34(3), 633–663. EBSCO MegaFILE.
288
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Batra, D. (2017). Adapting Agile Practices for Data Warehousing, Business Intelligence, and Analytics.
Journal of Database Management, 28(4), 1. ABI/INFORM Collection.
Bhatnagar, S., & Grosse, M. (2019). Future workplace organisation: How digitisation affects employees’
job satisfaction in agile workplaces. International Journal of Product Development, 23(4), 264–
291. ABI/INFORM Collection. https://doi.org/10.1504/IJPD.2019.105492
Boston Consulting Group. (2016). Connecting Business Strategy and Project Management. Project
Management Institute, 16.
Cohen, J. (2016). A Coefficient of Agreement for Nominal Scales: Educational and Psychological
Measurement. https://doi.org/10.1177/001316446002000104
Conboy, K. (2009). Agility from First Principles: Reconstructing the Concept of Agility in Information
Systems Development. Information Systems Research, 20(3), 329–354.
https://doi.org/10.1287/isre.1090.0236
Conforto, E. C., & Amaral, D. C. (2016). Agile project management and stage-gate model-A hybrid
framework for technology-based companies: JET-M JET-M. Journal of Engineering and
Technology Management, 40, 1. ABI/INFORM Collection.
Cooper, R. G., & Sommer, A. F. (2018). Agile-Stage-Gate for Manufacturers. Research Technology
Management, 61(2), 17–26. EBSCO MegaFILE.
Copola Azenha Flávio, Aparecida Reis Diane, & Leme Fleury André. (2021). The Role and Characteristics
of Hybrid Approaches to Project Management in the Development of Technology-Based Products
and Services. Project Management Journal, 52(1), 90–110. ABI/INFORM Collection.
https://doi.org/10.1177/8756972820956884
Cvetković, N., Morača, S., Jovanović, M., Medojević, M., & Lalić, B. (2017). Enhancing the Agility and
Performances of a Project with Lean Manufacturing Practices. Annals of DAAAM & Proceedings,
28, 661–670. Academic Search Premier.
Dingsøyr, T., Moe, N. B., & Seim, E. A. (2018). Coordinating Knowledge Work in Multiteam Programs:
Findings From a Large-Scale Agile Development Program. Project Management Journal, 49(6),
64–77. EBSCO MegaFILE.
Ereiz, Z., & Mušić, D. (2019). Scrum Without a Scrum Master. 2019 IEEE International Conference on
Computer Science and Educational Informatization (CSEI), 325–328.
https://doi.org/10.1109/CSEI47661.2019.8938877
Fitriani, A. N., Raharjo, T., Hardian, B., & Prasetyo, A. (2021). IT Infrastructure Agile Adoption for SD-
WAN Project Implementation in Pharmaceutical Industry: Case Study of an Indonesian Company.
2021 IEEE International IOT, Electronics and Mechatronics Conference (IEMTRONICS), 1–6.
https://doi.org/10.1109/IEMTRONICS52119.2021.9422650
Friess, E. (2018). “Filling to Capacity”: An Exploratory Study of Project Management Language in Agile
Scrum Teams. Technical Communication, 65(2), 169–180. Education Database; Research Library.
289
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Gablas, B., Ruzicky, E., & Ondrouchova, M. (2018). The Change in Management Style during then Course
of a Project from the Classical to the Agile Approach. Journal of Competitiveness, 10(4), 38–53.
ABI/INFORM Collection. https://doi.org/10.7441/joc.2018.04.03
Gaudenzi, B., & Christopher, M. (2016). Achieving supply chain ‘Leagility’ through a project management
orientation. International Journal of Logistics: Research & Applications, 19(1), 3–18. EBSCO
MegaFILE. https://doi.org/10.1080/13675567.2015.1073234
Gemino, A., Horner Reich Blaize, & Serrador, P. M. (2021). Agile, Traditional, and Hybrid Approaches to
Project Success: Is Hybrid a Poor Second Choice? Project Management Journal, 52(2), 161–175.
ABI/INFORM Collection. https://doi.org/10.1177/8756972820973082
Gheorghe, C. M., Greculescu, A., & Melcescu, L. M. (2017). Agile Approach in Electrical Engineering.
Research Impact and Outcomes. Conference on Economic and Social Development, 486–494.
ABI/INFORM Collection.
http://www.ezproxy.dsu.edu:2048/login?url=https://search.proquest.com/docview/2071305041?a
ccountid=27073
Hayat, F., Rehman, A. U., Arif, K. S., Wahab, K., & Abbas, M. (2019). The Influence of Agile Methodology
(Scrum) on Software Project Management. 2019 20th IEEE/ACIS International Conference on
Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing
(SNPD), 145–149. https://doi.org/10.1109/SNPD.2019.8935813
Highsmith, J., & Cockburn, A. (2001). Agile software development: The business of innovation. Computer,
34(9), 120–127. https://doi.org/10.1109/2.947100
Higuchi, M. M., & Nakano, D. N. (2017). Agile Design: A Combined Model Based On Design Thinking
And Agile Methodologies For Digital Games Projects. Revista de Gestão e Projetos, 8(2), 109–
126. ABI/INFORM Collection; Research Library.
Hobbs, B., & Petit, Y. (2017). Agile Methods on Large Projects in Large Organizations. Project
Management Journal, 48(3), 3–19. EBSCO MegaFILE.
https://doi.org/10.1177/875697281704800301
Hoda, R., & Murugesan, L. K. (2016). Multi-level agile project management challenges: A self-organizing
team perspective. The Journal of Systems and Software, 117, 245. ABI/INFORM Collection.
https://doi.org/10.1016/j.jss.2016.02.049
Hussien, A., Tucker, M., Cotgrave, A., Al-Khafajiy, M., & Shamsa, T. B. (2019). Optimizing Project
Delivery through Augmented Reality and Agile Methodologies. 2019 12th International
Conference on Developments in ESystems Engineering (DeSE), 1006–1013.
https://doi.org/10.1109/DeSE.2019.00187
Ismat Soueid, M., & Corá Martins, A. F. (2021). SCRUM AND AGILITY BEYOND IT: EVIDENCES IN
THE BRAZILIAN MINING INDUSTRY. Revista de Gestão e Projetos, 12(1), 123–148.
Jørgensen, M. (2016). A survey on the characteristics of projects with success in delivering client benefits.
Information and Software Technology, 78, 83. ABI/INFORM Collection.
290
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Kaczorowska, A. (2015). Traditional and agile project management in public sector and ICT. 2015
Federated Conference on Computer Science and Information Systems (FedCSIS), 1521–1531.
https://doi.org/10.15439/2015F279
Kassab, M., DeFranco, J., & Graciano Neto, V. (2018). An Empirical Investigation on the Satisfaction
Levels with the Requirements Engineering Practices: Agile vs. Waterfall. 2018 IEEE International
Professional Communication Conference (ProComm), 118–124.
https://doi.org/10.1109/ProComm.2018.00033
Kerscher, S., & Günzel, H. (2019). SCRUM4CONSULTING - AGILE PROJECT MANAGEMENT FOR
CONSULTING PROJECTS. Project Management Development - Practice & Perspectives, 242–
253. Business Source Premier.
Khomyakov, I., Mirgalimova, R., & Sillitti, A. (2020). An Investigation of the Project Management
Approaches of Agile and Plan-Based Companies. Proceedings of the 35th Annual ACM Symposium
on Applied Computing, 1662–1665. https://doi.org/10.1145/3341105.3374126
Kitchenham, B., & Charters, S. (2007). Guidelines for performing Systematic Literature Reviews in
Software Engineering.
Koch, J., & Schermuly, C. C. (2020). Who is attracted and why? How agile project management influences
employee’s attraction and commitment. International Journal of Managing Projects in Business,
14(3), 699–720. ABI/INFORM Collection. https://doi.org/10.1108/IJMPB-02-2020-0063
Kurniawan, R., Adler, H. M., Hamsal, M., & Wibowo Kosasih. (2020). Orchestrating internal and external
resources to achieve agility and performance: The centrality of market orientation. Benchmarking:
An International Journal, 28(2), 517–555. ABI/INFORM Collection. https://doi.org/10.1108/BIJ-
05-2020-0229
Kurniawan, R., Budiastuti, D., Hamsal, M., & Wibowo Kosasih. (2020). The impact of balanced agile
project management on firm performance: The mediating role of market orientation and strategic
agility. Review of International Business and Strategy, 30(4), 457–490. ABI/INFORM Collection.
https://doi.org/10.1108/RIBS-03-2020-0022
Law, E. L.-C., & Lárusdóttir, M. K. (2015). Whose Experience Do We Care About? Analysis of the Fitness
of Scrum and Kanban to User Experience. International Journal of Human - Computer Interaction,
31(9), 584. ABI/INFORM Collection. https://doi.org/10.1080/10447318.2015.1065693
Lehnen, J., Schmidt, T. S., & Herstatt, C. (2016). Bringing agile project management into lead user projects.
International Journal of Product Development, 21(2–3), 212. ABI/INFORM Collection.
Lei, H., Ganjeizadeh, F., Jayachandran, P. K., & Ozcan, P. (2017). A statistical analysis of the effects of
Scrum and Kanban on software development projects. Robotics & Computer-Integrated
Manufacturing, 43, 59–67. EBSCO MegaFILE.
Lill, P. A., Wald, A., & Gleich, R. (2020). AGILITY AND THE ROLE OF PROJECT — INTERNAL
CONTROL SYSTEMS FOR INNOVATION PROJECT PERFORMANCE. International Journal
of Innovation Management, 24(7). ABI/INFORM Collection.
https://doi.org/10.1142/S1363919620500644
291
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Lindsjørn, Y., Sjøberg, D. I. K., Dingsøyr, T., Bergersen, G. R., & Dybå, T. (2016). Teamwork quality and
project success in software development: A survey of agile development teams. Journal of Systems
& Software, 122, 274–286.
Luong, T. T., Sivarajah Uthayasankar, & Weerakkody Vishanth. (2021). Do Agile Managed Information
Systems Projects Fail Due to a Lack of Emotional Intelligence? Information Systems Frontiers,
23(2), 415–433. ABI/INFORM Collection. https://doi.org/10.1007/s10796-019-09962-6
Marinho, M., Noll, J., Richardson, I., & Beecham, S. (2019). Plan-Driven Approaches Are Alive and
Kicking in Agile Global Software Development. 2019 ACM/IEEE International Symposium on
Empirical Software Engineering and Measurement (ESEM), 1–11.
https://doi.org/10.1109/ESEM.2019.8870168
Meding, W. (2017). Effective Monitoring of Progress of Agile Software Development Teams in Modern
Software Companies: An Industrial Case Study. Proceedings of the 27th International Workshop
on Software Measurement and 12th International Conference on Software Process and Product
Measurement, 23–32. https://doi.org/10.1145/3143434.3143449
Mirzaei, M., & Mabin, V. (2017). Agile Project Management and Public Policy Development Projects: A
case study from New Zealand. New Zealand Journal of Applied Business Research (NZJABR),
15(1), 59–75. EBSCO MegaFILE.
Mishra, A., Sinha, K. K., & Thirumalai, S. (2017). Project Quality: The Achilles Heel of Offshore
Technology Projects? IEEE Transactions on Engineering Management, 64(3), 272–286.
https://doi.org/10.1109/TEM.2017.2662021
Mkoba, E., & Marnewick, C. (2020). Conceptual Framework for Auditing Agile Projects. IEEE Access, 8,
126460–126476. https://doi.org/10.1109/ACCESS.2020.3007874
Nerurkar, A., & Das, I. (2017). Analysis of DILRMP Project: Identifying the Applicability of Agile Project
Management for Digital Transformation Projects in Government and Public Sector. Proceedings
of the Special Collection on EGovernment Innovations in India, 34–38.
https://doi.org/10.1145/3055219.3055242
Noteboom, C., Ofori, M., Sutrave, K., & El-Gayar, O. (2021). Agile Project Management: A Systematic
Literature Review of Adoption Drivers and Critical Success Factors. Hawaii International
Conference on System Sciences. https://doi.org/10.24251/HICSS.2021.813
292
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Perlak, J. (2019). Characteristics of Self-Organizing Teams in Agile Projcet Management: A Case Study.
Acta Universitatis Nicolai Copernici. Nauki Humanistyczno-Spoleczne. Zarzadzanie, 46(1), 19–
27. ABI/INFORM Collection.
Pool, E. T., Poole, K., Upjohn, D. P., & Hernandez, J. S. (2019). ‘AGILE’ HELPING MAYO IMPROVE
ITS PROJECTS. Physician Leadership Journal, 6(2), 34. MasterFILE Premier.
Project Management Institute (Ed.). (2017a). A guide to the project management body of knowledge /
Project Management Institute (Sixth edition). Project Management Institute.
Project Management Institute. (2017b). Achieving Greater Agility: The people and process drivers that
accelerate results. Project Management Institute.
Project Management Institute, & Agile Alliance (Eds.). (2017). Agile practice guide. Project Management
Institute, Inc.
Salaou, A.-D., Damian, D., Lassenius, C., Voda, D., & Gançarski, P. (2021). Archetypes of delay: An
analysis of online developer conversations on delayed work items in IBM Jazz. Information &
Software Technology, 129, N.PAG.
Salman, A., Jaafar Mastura, Malik Summaira, Mohammad, D., & Muhammad Sohail Ayaz. (2021). An
Empirical Investigation of the Impact of the Communication and Employee Motivation on the
Project Success Using Agile Framework and Its Effect on the Software Development Business.
Business Perspectives and Research, 9(1), 46–61. ABI/INFORM Collection.
https://doi.org/10.1177/2278533720902915
Sampietro, M. (2016). The adoption and evolution of agile practices. Project Management Development -
Practice & Perspectives, 312–323.
Sanchez, F., Bonjour, E., Micaëlli, J.-P., & Monticolo, D. (2019). A Step for Improving THE
TRANSITION BETWEEN TRADITIONAL PROJECT MANAGEMENT TO AGILE PROJECT
MANAGEMENT Using a Project Management Maturity Model. Journal of Modern Project
Management, 7(1), 102–119.
Santana Furtado Soares, F., & de Lemos Meira, S. R. (2015). An agile strategy for implementing CMMI
project management practices in software organizations. 2015 10th Iberian Conference on
Information Systems and Technologies (CISTI), 1–4. https://doi.org/10.1109/CISTI.2015.7170402
Şarlak, B. (2020). Agile Methodology for Project/Process Management IT System Infrastructure. 2020 11th
International Conference on Computing, Communication and Networking Technologies
(ICCCNT), 1–7. https://doi.org/10.1109/ICCCNT49239.2020.9225593
Schmitt, A., & Hörner, S. (2021). Systematic literature review–improving business processes by
implementing agile. Business Process Management Journal.
Schwaber, K., & Sutherland, J. (2011). The Scrum Guide. Scrum Alliance, 21, 19.
Serrador, P., & Pinto, J. K. (2015). Does Agile work? - A quantitative analysis of agile project success.
International Journal of Project Management, 33(5), 1040. ABI/INFORM Collection.
293
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Shastri, Y., Hoda, R., & Amor, R. (2021). The role of the project manager in agile software development
projects. Journal of Systems & Software, 173, N.PAG.
Shastri, Y., Hoda, R., & Amor, R. (2017). Understanding the Roles of the Manager in Agile Project
Management. Proceedings of the 10th Innovations in Software Engineering Conference, 45–55.
https://doi.org/10.1145/3021460.3021465
Siddique, L., & Hussein, B. (2019). Enablers and barriers to customer involvement in agile software
projects in the Norwegian software industry: The Suppliers perspective. Journal of Modern Project
Management, 7(2), 172–195.
Siddique, L., & Hussein, B. A. (2016). GROUNDED THEORY STUDY OF THE CONTRACTING
PROCESS IN AGILE PROJECTS IN NORWAY’S SOFTWARE INDUSTRY. Journal of Modern
Project Management, 4(1), 52–63.
Sievi-Korte, O., Systä, K., & Hjelsvold, R. (2015). Global vs. Local—Experiences from a distributed
software project course using agile methodologies. 2015 IEEE Frontiers in Education Conference
(FIE), 1–8. https://doi.org/10.1109/FIE.2015.7344101
Stormi, K. T., Laine, T., & Korhonen, T. (2019). Agile performance measurement system development: An
answer to the need for adaptability? Journal of Accounting & Organizational Change, 15(2), 231–
256. ABI/INFORM Collection. https://doi.org/10.1108/JAOC-09-2017-0076
Tanner, M., & Mackinnon, A. (2015). Sources of Interruptions Experienced During a Scrum Sprint.
Electronic Journal of Information Systems Evaluation, 18(1), 3–18. ABI/INFORM Collection.
Taylor, K. J. (2016). Adopting Agile software development: The project manager experience. Information
Technology & People, 29(4), 670–687. ABI/INFORM Collection; Research Library.
https://doi.org/10.1108/ITP-02-2014-0031
Thesing, T., Feldmann, C., & Burchardt, M. (2021). Agile versus Waterfall Project Management: Decision
Model for Selecting the Appropriate Approach to a Project. Procedia Computer Science, 181, 746–
756.
Thorgren, S., & Caiman, E. (2019). The Role of Psychological Safety in Implementing Agile Methods
across Cultures. Research Technology Management, 62(2), 31–39.
Vahanvati, M., & Mulligan, M. (2017). A new model for effective post-disaster housing reconstruction:
Lessons from Gujarat and Bihar in India. International Journal of Project Management, 35(5),
802–817. EBSCO MegaFILE.
Wells, H., Dalcher, D., & Smyth, H. (2015). The Adoption of Agile Management Practices in a Traditional
Project Environment: An IT/IS Case Study. 2015 48th Hawaii International Conference on System
Sciences, 4446–4453. https://doi.org/10.1109/HICSS.2015.532
Wiboonrat, M. (2016). Applying agile to data center project. 2016 Management and Innovation Technology
International Conference (MITicon), MIT-93-MIT-98.
https://doi.org/10.1109/MITICON.2016.8025239
Zasa, F. P., Patrucco, A., & Pellizzoni, E. (2021). Managing the Hybrid Organization: How Can Agile and
Traditional Project Management Coexist?. Research Technology Management, 64(1), 54–63.
294
Issues in Information Systems
Volume 22, Issue 3, pp. 278-295, 2021
Zhang, H., Huang, H., Shao, D., & Huang, X. (2020). Fireteam: A Small-Team Development Practice in
Industry. Proceedings of the 28th ACM Joint Meeting on European Software Engineering
Conference and Symposium on the Foundations of Software Engineering, 1365–1375.
https://doi.org/10.1145/3368089.3417068
295