Lecture 3

Uploaded by

miriam.bongo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

ASSEMBLY LINE BALANCING

 Determining the ideal number of workers to be assigned to a


production line and determining the number of workers to be
assigned to a workstation
 Rate of production depends on the slowest operator
 Efficiency of a line can be computed as the ratio of the total
actual standard minutes to the total allowed standard minutes
 Percentage of idle time is computed as 1 − 𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦
 Number of operators, 𝑁
σ 𝑆𝑀
𝑁 = 𝑅 × ෍ 𝐴𝑀 = 𝑅 ×
𝐸
where:
𝑅 desired rate of production
𝑆𝑀 standard minutes per operation
𝐴𝑀 allowed standard minutes per operation
OPERATOR STD MINUTES TO WAIT TIME BASED STD
PERFORM ON SLOWEST TIME
OPERATION OPERATOR
1 0.52 0.13 0.65
2 0.48 0.17 0.65
3 0.65 - 0.65
4 0.41 0.24 0.65
5 0.55 0.10 0.65
2.61 3.25

σ51 𝑆𝑀 2.61
𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 = 5 = = 80.31%
σ1 𝐴𝑀 3.25
OPERATION STD The line must produce 700 units per day on
MINUTES a 480-minute workhour. Estimate the
1 1.25 number of operators required for a given
2 1.38 level of efficiency (ideal efficiency of
100.00% and realistic efficiency of 95.00%)
3 2.58
4 3.84
5 1.27 Rate of production is 1.46 units/min
6 1.29 23 operators (100.00% efficiency)
7 2.48
24 operators (95.00% efficiency)
8 1.28
OPERATION STD STD MINUTES NO. OF Number of minutes
MINUTES (min/unit) OPERATORS allowable to produce one
1 1.25 1.81 2 unit is 0.69 minutes
2 1.38 2.00 2
3 2.58 3.74 4
4 3.84 5.57 6
5 1.27 1.84 2
6 1.29 1.87 2
7 2.48 3.59 4
8 1.28 1.86 2
LINE BALANCING

 Minimum number of workstations,


σ𝑛𝑖=1 𝑡𝑖𝑚𝑒 𝑓𝑜𝑟 𝑡𝑎𝑠𝑘 𝑖
=
𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒

 Efficiency of line
σ𝑛𝑖=1 𝑡𝑖𝑚𝑒 𝑓𝑜𝑟 𝑡𝑎𝑠𝑘 𝑖
=
(𝑎𝑐𝑡𝑢𝑎𝑙 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑤𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛) × (𝑙𝑎𝑟𝑔𝑒𝑠𝑡 𝑎𝑠𝑠𝑖𝑔𝑛𝑒𝑑 𝐶𝑇)
LAYOUT HEURISTICS

 Longest task time


 Most following tasks
 Ranked positional weight
 Shortest task time
 Least number pf following tasks
TASK IMMEDIATE TASK TIME
A - 10 minutes Suppose that the line must
B A 11 minutes produce 40 units per day on a
C B 5 minutes 480-minute working-hour time
frame. Plan an assembly line
D B 4 minutes and estimate the number of
E A 12 minutes workstations required using the
F C, D 3 minutes heuristics (first, most number of
following tasks, then longest
G F 7 minutes task time).
H E 11 minutes
I G, H 3 minutes
TASK IMMEDIATE TASK TIME
A - 10 minutes 1. Identify minimum cycle time
B A 11 minutes (CT)
C B 5 minutes 2. Identify total processing
time
D B 4 minutes
3. Compute for probable
E A 12 minutes outputs produced given
F C, D 3 minutes minimum CT.
G F 7 minutes 4. Compute for CT given the
required outputs.
H E 11 minutes
5. Compute for the number of
I G, H 3 minutes workstations.
TASK IMMEDIATE TASK TIME
A - 10 minutes 1. Minimum CT is 12 minutes
B A 11 minutes per unit
C B 5 minutes 2. Total processing time is
66 minutes
D B 4 minutes
3. 40 units can be produced
E A 12 minutes based from the total
F C, D 3 minutes working-hours given
minimum CT
G F 7 minutes
4. CT is 12 minutes per unit
H E 11 minutes
5. Number of workstations is
I G, H 3 minutes 5.42 or 6
TASK IMME- TASK WORK TIME TASK TASK TIME IDLE
DIATE TIME STATION REMAINING ELIGIBLE ASSIGNED
A - 10 1 12 A A -
B A 11 2 B,E - 2
C B 5 2 12 B,E B -
D B 4 1 C,D,E - 1
E A 12 3 12 C,D,E C -
F C, D 3 7 D,E,F D -
G F 7 3 E,F F -
H E 11 4 12 E,G E -
I G, H 3 0 G,H - -
5 12 G,H H -
1 G,I - 1
6 12 G,I G -
5 I I 2
TASK IMME- TASK
DIATE TIME
A - 10
B A 11
C B 5
D B 4
E A 12
F C, D 3
G F 7
H E 11
I G, H 3
WORK TIME TASK TASK TIME IDLE
STATION REMAINING ELIGIBLE ASSIGNED
1 12 A A -
2 B,E - 2
2 12 B,E B -
Total idle time = 6
1 C,D,E - 1
minutes
3 12 C,D,E C -
Efficiency = 90.28%
7 D,E,F D -
Percentage idle = 3 E,F F -
9.72% 4 12 E,G E -
0 G,H - -
5 12 G,H H -
1 G,I - 1
6 12 G,I G -
5 I I 2
Given the same task specifications, the line is now required to
only produce 20 units per day on a 480-minute working-hour time
frame. Identify the new number of workstations (use the same
heuristics).