0% found this document useful (0 votes)
18 views4 pages

Access Summary

Uploaded by

G.Yebes Sahai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views4 pages

Access Summary

Uploaded by

G.Yebes Sahai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

TEMPORARY ACCESS SUMMARY DETAILS

Descriptions
Drawing
Supporting Block/ Man-
S.No. Details
Documents Compartment Fr./Long'l/ TS No Job scope
Hours
Remarks Material Specification Quantity
No. (Lump
sum)
PL-5000 x 2600 x 12 1
AL-2600 x 75/100 x 6 8
T-Bar W/PL-2600 x 1100 x 10 1
F/PL-2600 x 350 x 16 1
T-Bar W/PL-1350 x 450 x 8 1
F/PL-1350 x 150 x 8 1
Supply skilled manpower, tools, PPE & equipment to crop off
FWD-STBD THRUSTER VFD existing steel/remove and reinstall FWD STBD Thruster VFD room T-Bar W/PL-3640 x 350 x 8 1
ROOM Fr 4 to 6 EL due to interference for equipment installatiion and QC/QA/Owner
1 H200-233-001-02, R3 2 18500 Access opened F/PL-3640 x 100 x 8 1
(MAIN DECK) inspection was carried out at erection stage. sketch and as BKT-635 x 300 x 10 1
instructed by the yard/ owner's representatives.
BKT-Stif-570 x 100 x 10 1
BKT-742 x 350 x 10 1
BKT-Stiff-680 x 100 x 10 1
AL-1050 x 75/100 x 6 1
AL-1410 x 75/100 x 6 1
BKT-250 x 250 x 8 1
PL-5000 x 2600 x 12 1
AL-2600 x 75/100 x 6 8
T-Bar W/PL-2600 x 1100 x 10 1
F/PL-2600 x 350 x 16 1
T-Bar W/PL-1350 x 450 x 8 1
F/PL-1350 x 150 x 8 1
Supply skilled manpower, tools, PPE & equipment to crop off
FWD-STBD THRUSTER VFD existing steel/remove and reinstall FWD STBD Thruster VFD room T-Bar W/PL-3640 x 350 x 8 1
ROOM Fr 4 to 6 EL due to interference for equipment installatiion and QC/QA/Owner
2 H200-233-001-02, R3 4 18500 Access opened F/PL-3640 x 100 x 8 1
(MAIN DECK) inspection was carried out at erection stage. sketch and as BKT-635 x 300 x 10 1
instructed by the yard/ owner's representatives.
BKT-Stif-570 x 100 x 10 1
BKT-742 x 350 x 10 1
BKT-Stiff-680 x 100 x 10 1
AL-1050 x 75/100 x 6 1
AL-1410 x 75/100 x 6 1
BKT-250 x 250 x 8 1

PL-3790 x 3150 x 6 1
Supply skilled manpower, tools, PPE & equipment to crop off AL-3790 x 75/100 x 6 6
FWD-FUNNEL Fr 19 to 21 existing steel/remove and reinstall FWD Funnel (Roof top) due to Visual done T-Bar W/PL-3150 x 500 x 8 1
3 H950-268-000-01, R0 5 interference for equipment installatiion and QC/QA/Owner (NDT Balance)
(ROOF TOP) EL 41795 inspection was carried out at erection stage. sketch and as T-Bar F/PL-3150 x 150 x 8 1
instructed by the yard/ owner's representatives. BKT-400 x 250 x 10 1

PL-2500 x 1500 x 16 1
PL-2500 x 1500 x 10 1
Supply skilled manpower, tools, PPE & equipment to crop off
Fr 38 to 39 existing steel/remove and reinstall Main deck,LG-BHD and PL-2400 x 1400 x 8 1
MAIN DECK AND EL16500 Cofferdam deck (Transformer room) due to interference for JOB AL-1500 x 75/100 x 6 3
4 H200-233-001-02, R3 COFFERDAM DECK 9 Completed
TO equipment installatiion and QC/QA/Owner inspection was carried AL-1500 x 90/150 x 12 1
(Transformer Room) EL 18500 out at erection stage. sketch and as instructed by the yard/ owner's AL-1400 x 75/100 x 6 7
representatives.

Supply skilled manpower, tools, PPE & equipment to crop off


Fr 41 to 43 EL existing
steel/remove and reinstall AFT Funnel (Roof top) due to JOB PL-2700 x 2500 x 6 1
AFT-FUNNEL interference for equipment installatiion and QC/QA/Owner Completed
5 H950-268-002-01, R3 (ROOF TOP) 10 41795 inspection was carried out at erection stage. sketch and as AL-2700 x 75/100 x 6 5
instructed by the yard/ owner's representatives.

Supply skilled manpower, tools, PPE & equipment to crop off


AFT-PORT THRUSTER VFD existing steel/remove and reinstall AFT PORT Thruster VFD room Visual done PL-6000 X 1200 X 25 1
Fr 54 to 55 EL due
6 H200-233-001-02, R3 ROOM 12 to interference for equipment installatiion and QC/QA/Owner (NDT Balance)
18500 AL-1200 x 75/150 x 7 11
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives.

PL-4600 x 3610 x 25 1
AL-3610 x 75/150 x 7 8
AL-830 x 75/100 x 6 2
Supply skilled manpower, tools, PPE & equipment to crop off AL-2650 x 75/100 x 6 2
AFT-PORT THRUSTER ROOM existing steel/remove and reinstall AFT PORT Thruster room due to AL-880 x 75/100 x 6 2
Fr 56 to 58 EL interference for equipment installatiion and QC/QA/Owner
7 H200-233-001-02, R3 13 18500 Access opened
(MAIN DECK) inspection was carried out at erection stage. sketch and as T-Bar W/PL-4600 x 1045 x 10 2
instructed by the yard/ owner's representatives. T-Bar F/PL-4600 x 350 x 16 2
BKT-300 x 160 x 10 6
BKT-900 x 410 x 10 4
PL-840 x 100 x 10 4

PL-3600 x 2280 x 12 1
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar W/PL-2280 x 650 x 10 1
AFT-PORT THRUSTER VDF existing steel/remove and reinstall AFT PORT Thruster VDF room T-Bar F/PL-2280 x 150 x 16 1
Fr 60 to 62 EL due
8 H200-233-001-02, R3 ROOM 14 to interference for equipment installatiion and QC/QA/Owner Access opened
18500 BKT-500 x 250 x 10 1
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives. PL-420 x 100 x 10 1
AL-3600 x 75/150 x 7 4

PL-4500 x 2800 x 25 1
Supply skilled manpower, tools, PPE & equipment to crop off AL-4500 x 75/100 x 6 5
AFT-PORT THRUSTER VDF existing steel/remove and reinstall AFT PORT Thruster VDF room T-Bar W/PL-2800 x 800 x 12 1
Fr 55 to 57 EL due
9 H200-233-001-02, R3 ROOM 15 to interference for equipment installatiion and QC/QA/Owner Access opened
18500 T-Bar F/PL-2800 x 200 x 16 1
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives. BKT-800 x 300 x 10 1
PL-600 x 100 x 10 1

PL-4500 x 2700 x 25 1
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar W/PL-2700 x 800 x 12 1
AFT-STBD THRUSTER VDF existing steel/remove and reinstall AFT STBD Thruster VDF room Visual done T-Bar F/PL-2700 x 200 x 16 1
Fr 55 to 57 EL due
10 H200-233-001-02, R3 ROOM 16 to interference for equipment installatiion and QC/QA/Owner (NDT Balance)
18500 AL-4500 x 75/150 x 7 5
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives. BKT-650 x 300 x 10 1
PL-600 x 100 x 10 1

Supply skilled manpower, tools, PPE & equipment to crop off PL-6000 X 1200 X 25 1
AFT-STBD THRUSTER VDF existing steel/remove and reinstall AFT STBD Thruster VDF room Visual done AL-1200 x 75/150 x 7 10
Fr 54 to 55 EL due
11 H200-233-001-02, R3 ROOM 17 to interference for equipment installatiion and QC/QA/Owner (NDT Balance)
18500
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives.
Supply skilled manpower, tools, PPE & equipment to crop off
AFT-STBD THRUSTER VDF existing steel/remove and reinstall AFT STBD Thruster VDF room Visual done
Fr 54 to 55 EL
11 H200-233-001-02, R3 ROOM 17 18500 due to interference for equipment installatiion and QC/QA/Owner (NDT Balance)
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives.
PL-4500 x 3200 x 25 1
AL-4500 x 75/150 x 7 6
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar W/PL-3200 x 1045 x 10 2
AFT-STBD THRUSTER ROOM Fr 56 to 58 EL existing steel/remove and reinstall AFT STBD Thruster room due to Access opened T-Bar F/PL-3200 x 400 x 16 2
12 H200-233-001-02, R3 18 18500 interference for equipment installatiion and QC/QA/Owner (Temporary
(MAIN DECK) inspection was carried out at erection stage. sketch and as closed) AL-2650 x 75/100 x 6 2
instructed by the yard/ owner's representatives. BKT-900 x 410 x 10 4
PL-840 x 100 x 10 4
AL-4550 x 75/100 x 6 (Loose piece) 4

PL-3600 x 2300 x 12 1
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar W/PL-2300 x 650 x 10 1
AFT-STBD THRUSTER VDF Fr 59 to 61 EL existing steel/remove and reinstall AFT STBD Thruster VDF room T-Bar F/PL-2300 x 150 x 16 1
13 H200-233-001-02, R3 ROOM 19 18500 due to interference for equipment installatiion and QC/QA/Owner Access opened
(MAIN DECK) inspection was carried out at erection stage. sketch and as BKT-500 x 250 x 10 1
instructed by the yard/ owner's representatives. PL-420 x 100 x 10 1
AL-3600 x 75/150 x 7 4

PL-3900 x 2300 x 12 1
T-Bar W/PL-3900 x 640 x 10 1
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar F/PL-3900 x 150 x 16 1
AFT-PORT THRUSTER VDF existing steel/remove and reinstall AFT PORT Thruster VDF room AL-2300 x 75/150 x 7 7
ROOM Fr 65 to 67 EL due to interference for equipment installatiion and QC/QA/Owner
14 H200-233-001-02, R3 20 18500 Access opened
(MAIN DECK) inspection was carried out at erection stage. sketch and as BKT-500 x 250 x 10 2
instructed by the yard/ owner's representatives. PE-1200 x Dia 500 x 10 1
DBLR - Dia1330 x 10 1
AL-11100 x 75/150 x 7 1
PL-3900 x 2300 x 12 1
T-Bar W/PL-3900 x 640 x 10 1
Supply skilled manpower, tools, PPE & equipment to crop off T-Bar F/PL-3900 x 150 x 16 1
AFT-PORT THRUSTER VDF existing steel/remove and reinstall AFT PORT Thruster VDF room
Fr 65 to 67 EL due AL-2300 x 75/150 x 7 7
15 H200-233-001-02, R3 ROOM 21 to interference for equipment installatiion and QC/QA/Owner Access opened
18500 BKT-500 x 250 x 10 2
(MAIN DECK) inspection was carried out at erection stage. sketch and as
instructed by the yard/ owner's representatives. PE-1200 x Dia 500 x 10 2
DBLR - Dia1330 x 10 2
AL-11100 x 75/150 x 7 1

FWD-PORT THRUSTER
ROOM Access is not
16 H200-233-001-02, R3 1 opened
(MAIN DECK)

FWD-STBD THRUSTER Access is not


17 H200-233-001-02, R3 ROOM 3 opened
(MAIN DECK)

STBD MID THRUSTER ROOM


Access is not
18 H200-233-001-02, R3 8 opened
(MAIN DECK)