03 - Capacity Planning

Uploaded by

gmgt79ryv5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 60

𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑢𝑠𝑒𝑑

𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑢𝑡𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑟𝑎𝑡𝑒 =


𝐵𝑒𝑠𝑡 𝑜𝑝𝑒𝑟𝑎𝑡𝑖𝑛𝑔 𝑙𝑒𝑣𝑒𝑙
480
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑢𝑡𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 𝑟𝑎𝑡𝑒 = = 96%
500


𝑓𝑖𝑥𝑒𝑑 𝑐𝑜𝑠𝑡 + 𝑣𝑎𝑟𝑖𝑎𝑏𝑙𝑒 𝑐𝑜𝑠𝑡


𝑢𝑛𝑖𝑡 𝑐𝑜𝑠𝑡 =
𝑡ℎ𝑟𝑜𝑢𝑔ℎ𝑝𝑢𝑡

𝑓𝑖𝑥𝑒𝑑 𝑐𝑜𝑠𝑡
𝑢𝑛𝑖𝑡 𝑐𝑜𝑠𝑡 = + 𝑣𝑎𝑟𝑖𝑎𝑏𝑙𝑒 𝑢𝑛𝑖𝑡 𝑐𝑜𝑠𝑡
𝑡ℎ𝑟𝑜𝑢𝑔ℎ𝑝𝑢𝑡
𝑐ℎ𝑎𝑛𝑔𝑒𝑜𝑣𝑒𝑟 𝑐𝑜𝑠𝑡
𝑈𝑛𝑖𝑡 𝑐𝑜𝑠𝑡 = + 𝑟𝑢𝑛𝑛𝑖𝑛𝑔 𝑐𝑜𝑠𝑡 𝑝𝑒𝑟 𝑢𝑛𝑖𝑡
𝑢𝑛𝑖𝑡𝑠 𝑝𝑒𝑟 𝑟𝑢𝑛










135000 135000
= 30% = 0.9 𝑚𝑎𝑐ℎ𝑖𝑛𝑒𝑠 0.9 × 2 = 1.8 𝑜𝑝𝑒𝑟𝑎𝑡𝑜𝑟𝑠
3 × 150000 150000

300000 300000
= 24% = 1.2 𝑚𝑎𝑐ℎ𝑖𝑛𝑒𝑠 1.2 × 3 = 3.6 𝑜𝑝𝑒𝑟𝑎𝑡𝑜𝑟𝑠
5 × 250000 250000
▪ ▪
▪ ▪
▪ ▪
Analysebereich
1 3

Parameterbereich
4

Originalsicht Alternativensicht


𝑁
𝑅𝑡
𝑁𝑃𝑉(𝑖, 𝑁) = ෍
(1 + 𝑖)𝑡
𝑡=1

NPV (rate, value1, [value2], …)


195000 195000 195000 195000 195000
𝑁𝑃𝑉 = + = 638,487
(1+0.16)1 (1+0.16) (1+0.16) (1+0.16) (1+0.16)5
2 3 4
170000
𝑁𝑃𝑉 = = 146552
(1 + 0.16)1
190000 190000 190000 190000
+ 87000
(1 + 0.16)1 (1 + 0.16)2 (1 + 0.16)3 (1 + 0.16)4
𝑁𝑃𝑉 = −
(1 + 0.16)1 1 + 0.16 1

= 458,323 − 75,000
= 383,323
𝑀1,𝑖 𝑀2,𝑖
𝑊1 𝑊2 𝑊3 𝑊𝑖 𝑊𝑛
𝑀𝑗,𝑖 𝑀𝑚,𝑖
𝐴 + 𝑘𝑚
𝐿𝑒𝑎𝑑 𝑡𝑖𝑚𝑒 = 𝑇𝑖𝑚𝑒 𝑜𝑓 𝑜𝑟𝑑𝑒𝑟 𝑑𝑒𝑙𝑖𝑣𝑒𝑟𝑒𝑑 − 𝑡𝑖𝑚𝑒 𝑜𝑓 𝑜𝑟𝑑𝑒𝑟 𝑟𝑒𝑐𝑒𝑖𝑣𝑒𝑑

𝑊𝑜𝑟𝑘𝑎𝑏𝑙𝑒 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 ℎ𝑜𝑢𝑟𝑠


𝑇𝑎𝑘𝑡 𝑡𝑖𝑚𝑒 =
𝑈𝑛𝑖𝑡 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 (𝑐𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝑑𝑒𝑚𝑎𝑛𝑑)

𝑁𝑒𝑡 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒


𝐶𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 =
𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑢𝑛𝑖𝑡𝑠 𝑝𝑟𝑜𝑑𝑢𝑐𝑒𝑑
𝑟𝑎

𝑢𝑚
𝐶𝑇𝑚

𝑟𝑎 𝑡𝑒 𝑐𝑒
𝑢𝑚 = 𝑐𝑎 𝑐𝑑
𝑚
𝑊
𝑐𝑎 2 + 𝑐𝑒 2 𝑢 2 𝑚+1 −1
𝐶𝑇𝑚 = 𝑡𝑒 + 𝑡𝑒
2 𝑚 1 − 𝑢𝑚
𝒄 < 𝟎. 𝟕𝟓 𝜎
𝑐=
𝑡
𝟎. 𝟕𝟓 ≤ 𝒄 < 𝟏. 𝟑𝟑
𝜎
𝑡:
𝒄 ≥ 𝟏. 𝟑𝟑
𝑐𝑎 2
i
𝑐𝑎,𝑖 2 , 𝑐𝑒,𝑖 2 , 𝑐𝑑,𝑖 2
i(i=1,…,n)

𝑎 𝑠𝑝𝑒𝑐𝑖𝑓𝑖𝑒𝑑 𝑐𝑜𝑛𝑠𝑡𝑎𝑛𝑡, 𝑖=1


𝑐𝑎,𝑖 2 = ൝
𝑐𝑑,𝑖−1 2 , 𝑖>1

i= 1,…,n.

2
𝑢𝑚
𝑐𝑑,𝑖 2 = 1 + 𝑐𝑎,𝑖−1 2 − 1 1 − 𝑢𝑚
2 + 𝑐𝑒,𝑖 2 − 1
𝑚
𝑟𝑎 𝑐𝑎 2

𝐶𝑒, 𝑖2

2 2 2
𝑐𝑒,1 = 1.00 𝑐𝑒,2 = 1.00 𝑐𝑒,3 = 3.14 2
𝑐𝑒,4 = 0.10
2
𝑐𝑎,1 = 1.00
𝑊1 𝑊2 𝑊3 𝑊4
𝑡𝑒,1 = 1.5 𝑡𝑒,2 = 0.78 𝑡𝑒,3 = 1.1 𝑡𝑒,4 = 1.6
𝑟𝑎 𝑡𝑒
𝑢𝑚 = <1 𝑚 > 𝑟𝑎 𝑡𝑒
𝑚
𝑗𝑜𝑏𝑠
𝑟𝑎 𝑡𝑒,1 = 2.5 × 1.5 ℎ𝑜𝑢𝑟𝑠 = 3.75 𝑗𝑜𝑏𝑠 ≈ 4 machines
ℎ𝑜𝑢𝑟
𝑗𝑜𝑏𝑠
𝑟𝑎 𝑡𝑒,4 = 2.5 × 1.6 ℎ𝑜𝑢𝑟𝑠 = 4.00 𝑗𝑜𝑏𝑠 ≈ 5 𝑚𝑎𝑐ℎ𝑖𝑛𝑒𝑠
ℎ𝑜𝑢𝑟
1.0 + 1.0 0.94 2 4+1 −1
𝐶𝑇4 = 1.5 + 1.5 = 6.72 ℎ𝑜𝑢𝑟𝑠
2 4 1 − 0.94

0.942
𝑐𝑑,𝑖 2 = 1 + 1.0 − 1 1 − 0.942 + 1 − 1 = 1.0
4

1.0 + 1.0 0.98 2 2+1 −1


𝐶𝑇2 = 0.78 + 0.78 = 15.82 ℎ𝑜𝑢𝑟𝑠
2 2 1 − 0.98

2 2
0.982
𝑐𝑑,𝑖 = 1 + 1.0 − 1 1 − 0.98 + 1 − 1 = 1.0
2
1.0 + 3.14 0.92 2 3+1 −1
𝐶𝑇3 = 1.1 + 1.1 = 8.87 ℎ𝑜𝑢𝑟𝑠
2 3 1 − 0.92

2 (𝑖)
0.922
𝑐𝑑,𝑖 = 1 + 1.0 − 1 1 − 0.922 + 3.14 − 1 = 2.0
3

2.0 + 0.1 0.80 2 5+1 −1


𝐶𝑇5 = 1.6 + 1.6 = 2.59 ℎ𝑜𝑢𝑟𝑠
2 5 1 − 0.80
𝑐𝑎 2 + 𝑐𝑒 2 𝑢 2 𝑚+1 −1
2 𝑚 1−𝑢