TRAINER - Installation Instruction EN
TRAINER - Installation Instruction EN
The safety of using products is dependent on proper installation carried out according to the instructions
provided with the device by the producer. Only properly installed devices may be used. Before releasing
devices to the public it is imperative to check that the installation has been carried out correctly.
TRAINER external fitness devices are are designed, installed, serviced and delivered to the enduser
based on the requirements of norms PN-EN 13485:2012 and PN-EN 16630:2015.
GENERAL REMARKS
The recommended minimal distance (so called safe area) between external fitness devices and other
objects situated in their vicinity should be:
● for devices with a fall height up to 150cm – the safe are is 150cm from each side of the
device
● for devices with a fall height greater than 150cm – the safe area = 0.5m + 0.67 x the height
of the device
Due to a small fall height under the fitness devices various sorts of surfaces may used such as: earth,
turf, concrete, sand, gravel, bark or other materials.
1
4. Make sure that the hole is of the right
3. Dig a hole for the foundation. dimensions. It should be at least 500mm long,
If the ground is granular use boarding 500mm wide and 600 mm deep.
5. The foundations should be made from B20 or 6. Pour in enough concrete to leave 100 mm
B25 concrete. from the surface of the concrete to ground
Make the concrete on location or order it level.
from a concrete plant.
Pour the ready concrete into the foundation hole. When installing only a few fitness machines it
makes sense to prepare the concrete on site. A
500x500x500mm hole requires approx. 10 bags
of 25kg ready mix concrete mixed with water.
7. Insert the metal anchor provided with the 8. Move the anchor around in the concrete to
fitness device into the concrete. ensure proper positioning.
2
9. Align the anchor in the concrete so the 10. Secure the construction area and wait a few
threaded poles stick out 40-45 mm above the days until the concrete has hardened.
level of the concrete and the anchor is mounted
vertically. Make the surface of the concrete
even.
3. In order to mount the pylon to the anchor you 4. Make sure that the device is properly mounted.
will need: 4 galvanized standard washers, 4 It should adhere well to the foundation (the
galvanized split washers, 4 galvanized nuts foundation should be smooth and level)
16mm diameter and a no. 24 wrench.
Place the wide washers on the threaded bolts of
All the washers and nuts are supplied in a set the anchor, then apply the split washers (the
3
with the device. smaller ones) and to finish screw on the
appropriate nuts to the thread of the anchor.
Finally, remember to install the plastic end
covers on the nuts (they will also protect the Finally tighten the nuts with a no. 24 wrench.
bolts from moisture and damage).
The pylon is ready to accept the fitness device
(or 2).
7. Bring the device to the installation area on the 8. When 1 screw is installed, apply the other 3
pylon and temporarily attach it with 1 screw. screws.
4
9. Tighten the screws. 10. Add a covering layer of earth under the pylon
and stick the instructions of use onto the pylon.
WARNING !!!
Some devices mounted to a pylon have their
own additional ‘small’ foundation of the
dimensions 500x300x200 mm.
1. Position the device on the threaded bolts 2. To mount the pole to the foundation you need:
sticking out of the anchor in such a way as to not 4 normal galvanized washers (wide ones), 4
damage the threads. galvanized split washers, 4 16mm galvanized
nuts and a no.24 wrench. All the washers and
nuts are supplied with the device.
5
3. On every thread apply: a normal wide washer, 4. Check to see if the device is properly
then on top of it a split washer and finish with a mounted (vertically and horizontally) and
nut. Tighten delicately with a no. 19 spanner. make sure it is stable.
If it is crooked, add more wide washers to make
up for errors. When it is level, tighten the nuts
and add the plastic end covers.
5. After tightening the nuts, place a 150mm layer 6. Stick on the user instructions. Do this
of earth over the foundation. Make it level with carefully. Delicately stick the centre from top to
the surface of the ground. bottom.
7. Next, using a cloth apply the rest of the 8. The device is ready for use.
sticker towards the sides. Make it adhere well
(without bubbles). It must be legible.
6
ADDITIONAL WARNING:
1. Some devices can be mounted not only to a 2. We recommend buying a board with the
pylon, but also to a special pole. fitness centre rules and separating the fitness
In this case they are mounted similarly to area from the playground (e.g. by a simple
devices mounted to a pylon. fence).
ADDITIONAL INFORMATION
1. In the case of an installation performed that does not conform to these instructions, ZPU
Romex Sp. z o.o., holds no responsibility for medical issues arising from the use of these products.
2. All emerging variations in the technical aspect of these products: damage, failure,
malfunctions caused by improper installation not abiding to these instructions do not qualify for
guarantee nor warranty from the manufacturer, ZPU Romex Sp. z o.o.
3. If after reading these instructions there remain any doubts pertaining to proper installation it
is imperative to contact the manufacturer ZPU Romex Sp. z o.o. to receive additional information
and/or consultation.
MANUFACTURER:
ZPU ROMEX Sp. z o.o.
ul. Hetmańska 38,
85-039 Bydgoszcz /POLAND
Tel. +48 798 569 799
[email protected]