0% found this document useful (0 votes)
38 views3 pages

72 OC 46 - Control Plan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views3 pages

72 OC 46 - Control Plan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

CONTROL PLAN

Prototype Prelaunch Production Customer Assy. Ref. : - 10000038595 Alkraft Assy. Ref. No. : 72 OC 46 0000A Customer : M/s.
M.H.Zakkir Hussain /
CONTROL PLAN NUMBER : CP/72 OC 46 0000A/01 Key contact/ Phone Date (orig.) Date (Rev.) :- 17.05.2024>>
044-2625 87 50
Part No./Latest Customer Engg. Approval / Date
72 OC 46 0000A/a Core Team MP/NP/SK/MV
change level (If Reqd.)
Part name/ Customer Quality Approval / Date
AIR COMPRESSOR
Description ( If Reqd.)
Supplier / Plant Alkraft , Chennai Supplier code: Other approval / Date (If reqd.) Customer Requirement, if specified
Characteristics Methods
Special
Process Name Operation Machine, Device, Tools Error proof Test plan General Reaction Plan &
Part/ Process No. Char. Product/ Process Specification/ Evaluation Responsibility
Description for Mfg. No Product Process Sample size Sampling Frequency Control method/ Error Proofing & Reaction plan (in Corrective Action
class Tolerance Measurement technique
case of failure)

150 to 220 Amps ( Full Welding )


Welding Current 220 to 270 Amps ( Tack & Stitch a), b) Operator - Visual, FPA
Process validation done once
Welding ) a) Every setting, shift & & IPR.
a) FPA - 1no in 6 months. Adjust in welding
Visual part no change. N/A a) Line QA/Production
b) IPR - 1no parameters setting.
b) Per every 10 nos Supervisor - FPA.
1 Argon Gas flow 12 ± 1 Lpm FPA & IPR
Maintenanace shift Incharge

Stop & Correct; If not Welder, Operator, Line


2.4mm ( Full Welding ) Every setting & shift
Filler rod dia 3.2mm ( Tack & Stitch Welding ) Vernier FPA - 1no FPA N/A possible Inform to QA/Production Supervisor -
change
Supervisor. FPA.

Extrusion Tank bottom


base to M18X2.5 - 1D
2 74.6±1.5
Round Boss
( Horizontal )

Extrusion Tank bottom


3 base to Tank side Piece 2±1.5 Check the welding Fixture.
a) 100%
( Horizontal ) a) Fixture on all Parts FPA & IPR Reset the component to ensure a), c) Operator - IPR.
b) FPA T/P - Periodic
Extrusion Tank bottom ACC Sub assembly b) Every setting & shift fitment of the components in
c) IPR with Sub calibration as per the fixture.
4 base to M8X1.25 - 1.5D 16±1 welding fixture change E/P - ACC Sub Assy b) Line QA/Production
Process name: assembly welding plan. Raise B/D slip and issue to
Helicoil CL c) Per every 10 nos Welding Fixture supervisor - FPA.
Extrusion Tank (LH & fixture - 1no Tool room.
RH ) with Tank Side Extrusion Tank M8X1.25 -
Piece - 1 & Tank Side 5 1.5D 100±1.5
Piece - 2 CTC
72 OC TIG welding Machine
000460000040 & ACC Sub assembly
Description: Extrusion Tank Top base to
S-1 welding fixture
Tack & Stitch welding 6 M18X2.5 - 1D Round Boss 13±1.5
Extrusion Tank (LH & ( Horizontal )
RH ) with Tank Side
Piece - 1 & Tank Side Weldiing Leg Height at
Piece - 2 7 3.00
Tank Side Piece Welding bridge cam Every setting & shift Adjust in welding Line QA/Production
FPA - 1no FPA N/A
Weldiing Leg Height at gauge change parameters setting. Supervisor - FPA.
8 3.00
Round Boss
Stop & Correct; If not Welder, Operator, Line
Welding Projection on Tank Every setting & shift
9 1.5mm Max Vernier FPA - 1no FPA N/A possible Inform to QA/Production Supervisor -
Side Piece - 2 change
Supervisor. FPA.

a), b), c) Setter - Visual, FPA


a) Visually on all Parts Annual Welder
Part should not have Welding a) 100% & IPR.
b) Every setting, shift & qualification is done. Adjust in welding
10 Welding Apperance Undercut,Blow Holes,porosity & Visual b) FPA - 1no
part no change.
FPA & IPR b) Line QA/Production
c) IPR - 1no parameters setting.
High Point in Welding Bead c) Per every 10 nos Supervisor - FPA.
FPA & IPR.

Part Should be Clean,Free from


Sharp edges ,Burr,Thread & a) Visually on all Parts a), b), c) Operator - Visual, FPA
a) 100%
b) Every setting, shift & Quarantine; Inform Production & IPR.
11 Apperance Mounting Part Top Face Should Visual b) FPA - 1no
part no change.
FPA & IPR N/A
supervisor b) Line QA/Production
Not Get Damaged in Welding c) IPR - 1no
c) Per every 10 nos Supervisor - FPA.
Process
CONTROL PLAN
Prototype Prelaunch Production Customer Assy. Ref. : - 10000038595 Alkraft Assy. Ref. No. : 72 OC 46 0000A Customer : M/s.
M.H.Zakkir Hussain /
CONTROL PLAN NUMBER : CP/72 OC 46 0000A/01 Key contact/ Phone Date (orig.) Date (Rev.) :- 17.05.2024>>
044-2625 87 50
Part No./Latest Customer Engg. Approval / Date
72 OC 46 0000A/a Core Team MP/NP/SK/MV
change level (If Reqd.)
Part name/ Customer Quality Approval / Date
AIR COMPRESSOR
Description ( If Reqd.)
Supplier / Plant Alkraft , Chennai Supplier code: Other approval / Date (If reqd.) Customer Requirement, if specified
Characteristics Methods
Special
Process Name Operation Machine, Device, Tools Error proof Test plan General Reaction Plan &
Part/ Process No. Char. Product/ Process Specification/ Evaluation Responsibility
Description for Mfg. No Product Process Sample size Sampling Frequency Control method/ Error Proofing & Reaction plan (in Corrective Action
class Tolerance Measurement technique
case of failure)

a), b) Operator - Visual, FPA &


Welding Current 220 to 270 Amps Stop & Correct; If not possible
a) Every setting, shift & part Process validation done once in IPR.
a) FPA - 1no Inform to Supervisor.
Visual no change. 6 months. N/A Adjust in welding parameters
a) Line QA/Production
b) IPR - 1no b) Per every 10 nos FPA & IPR Supervisor - FPA.
1 setting.
Maintenanace shift Incharge
Argon Gas flow 12 ± 1 Lpm

Welder, Operator, Line


Every setting & shift Stop & Correct; If not possible
Filler rod dia 3.2mm Vernier FPA - 1no FPA N/A Inform to Supervisor.
QA/Production Supervisor -
change FPA.

2 Tank Outer to Outer 1080-3.0

3 SQ Spacer CTC 806.2±3.0


Tank outer face to SQ a) 100% Check the welding Fixture.
4 125±2.0
Spacer CL ( LH ) Digital height b) FPA with height a) Fixture on all Parts FPA & IPR Reset the component to a), c) Operator - IPR.
T/P - Periodic
Tank outer face to SQ gauge/Vernier/Tank gauge/Vernier - 1no b) Every setting & shift ensure fitment of the
5 149±2.0 calibration as per
Spacer CL ( RH ) With Core assembly c) IPR with Sub change E/P - Welding fixture ( ACC , components in the fixture. b) Line QA/Production
plan.
welding fixture assembly welding c) Per every 10 nos FC & DOC ) Raise B/D slip and issue to supervisor - FPA.
6 SQ Spacer Width 40±1.0 fixture - 1no Tool room.
Process name:
Extrusion Tank With Tank Face to SQ Spacer
7 10±1.5
Core Assy TIG welding Machine Face
, Welding fixture
72 OC 8 Mounting Boss CTC 1040±3.0
Description: ( ACC , FC & DOC ) M
000460000040
Tack & Full Welding & L - BKT Welding
S-2
of Core With LH Tank Template ( LH & Check the welding Fixture.
Tank Bottom Face to L -
Assy , RH Tank RH ) 9 63±1.5 a) Visually on all Parts FPA & IPR Reset the component to ensure a), c) Operator - IPR.
BKT Top Face a) 100%
Assy,SQ Spacer & L - L - BKT Welding b) Every setting, shift & T/P - Periodic fitment of the components in
BKT b) FPA - 1no
Template part no change. E/P - L - BKT Welding calibration as per plan. the fixture. b) Line QA/Production
c) IPR - 1no
L - BKT Top Face to SQ c) Per every 10 nos Template ( LH & RH ) Raise B/D slip and issue to supervisor - FPA.
10 161±2.0 Tool room.
Spacer Face

Tank Face to Tank Side


11 Piece - 2 Face 1.5±1.5
( LH )
Tank Face to Tank Side
12 Piece - 2 Face 1.5±1.5
( RH ) Stop & Correct; If not Welder, Operator, Line
Every setting & shift
Vernier FPA - 1no FPA N/A possible Inform to QA/Production Supervisor -
Welding Projection on Tank change
Supervisor. FPA.
13 Side Piece - 2 1.5mm Max
( LH )
Welding Projection on Tank
14 Side Piece - 2 1.5mm Max
( RH )
a) Visually on all Parts a), b), c) Operator - Visual, FPA
No welding spatter, Blow holes, a) 100%
b) Every setting, shift & Quarantine; Inform Production & IPR.
15 Appearance poor welding, incomplete welding, Visual b) FPA - 1no
part no change.
FPA & IPR N/A
supervisor b) Line QA/Production
damages allowed c) IPR - 1no
c) Per every 10 nos Supervisor - FPA.
CONTROL PLAN
Prototype Prelaunch Production Customer Assy. Ref. : - 10000038595 Alkraft Assy. Ref. No. : 72 OC 46 0000A Customer : M/s.
M.H.Zakkir Hussain /
CONTROL PLAN NUMBER : CP/72 OC 46 0000A/01 Key contact/ Phone Date (orig.) Date (Rev.) :- 17.05.2024>>
044-2625 87 50
Part No./Latest Customer Engg. Approval / Date
72 OC 46 0000A/a Core Team MP/NP/SK/MV
change level (If Reqd.)
Part name/ Customer Quality Approval / Date
AIR COMPRESSOR
Description ( If Reqd.)
Supplier / Plant Alkraft , Chennai Supplier code: Other approval / Date (If reqd.) Customer Requirement, if specified
Characteristics Methods
Special
Process Name Operation Machine, Device, Tools Error proof Test plan General Reaction Plan &
Part/ Process No. Char. Product/ Process Specification/ Evaluation Responsibility
Description for Mfg. No Product Process Sample size Sampling Frequency Control method/ Error Proofing & Reaction plan (in Corrective Action
class Tolerance Measurement technique
case of failure)

Operator - leak test.


72 OC Process name: Wet Leak Testing No leak @ 10±0.1 bar Reject / Quarantine; Record
1 M Visual 100% 100% Leak Test Report N/A Line QA/Production
000460000042 Wet Leak Test Machine in SAP.
Supervisor - Once in a shift.

Operator - Visual.
72 OC QUARANTINE; Inform
Drying Air Gun 1 Apperance Free from water, moisture Visual Visually on all Parts. Every batch Visual N/A Line QA/Production
000460000046 Supervisor for drying
supervisor - Visual.
Packing sticker generated Quarantine and Inform Final product quality - Visual.
72 OC Parts to be packed as per through SAP for Part no
Packing Manual 1 Apperance Visual Visually on all Parts. Every Shift identification & traceability;
N/A Production Supervisor. Line QA/Production
000460000094 approved packing standard.
Visual Raise NCR supervisor - Visual.

Prepared by: Krishna Prasad . P Checked by : Approved by :Thanigainathan


All dimensions are in mm unless otherwise specified
GENERAL REACTION PLAN : If there is any deviation - STOP,REJECT THE SAMPLE, QUARANTINE THE LOT
SNO PART NAME PART NO
Revision History 1 RADIATOR CORE 72 OC 46 1000
Sl.No Rev No Rev Date Details of Changes Remarks 2 LH Tank Assembly 72 OC 46 1500
1 3 RH Tank Assembly 72 OC 46 1600
4 SQ Spacer 72 OC 46 1556
5 Mounting Boss - M8X1.5 - 1D With Helicoil 72 OC 45 1515
6 L - BKT 72 OC 46 1555
7 Tank Side Piece - 1 72 OC 46 1520
8 Tank Side Piece - 2 72 OC 46 1521
9 Extrusion Tank LH & RH 72 OC 46 1510