ISE Slide 7

Uploaded by

Amna Mushtaq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Introduction to Software Engineering

Slide no 7 (week 7)
Process and Project Metrics
Project Planning
• Project planning consists of the following essential activities:
• Estimating the following attributes of the project:
– Project size: What will be problem complexity in terms of
the effort and time required to develop the product?
• Cost: How much is it going to cost to develop the
project?
• Duration: How long is it going to take to complete
development?
• Effort: How much effort would be required?
• The effectiveness of the subsequent planning activities is based
on the accuracy of these estimations.
• Scheduling manpower and other resources
• Staff organization and staffing plans
• Risk identification, analysis, and abatement planning
• Miscellaneous plans such as quality assurance plan,
configuration management plan, etc.
Responsibilities of a software project manager
• Project proposal writing
• Project cost estimation
• Scheduling
• Project staffing
• Software process tailoring
• Project monitoring and control
• Software configuration management
• Risk management
• Managerial report writing
• Interfacing with clients
• Presentations
Software Cost Estimation
• Software cost estimation is the cost of predicting the amount
of effort required to build a software system.

What is Metrics ?
• Metrics are a system of parameters or ways of quantitative
and periodic assessment of a process that is to be measured.
• The metric system is the modern approach to weights and
measures.
• Measures typically are quantitative in nature, conveyed in
numbers, dollars, percentages, etc
Contd!....
• Software metrics are the statistics describing the structure or
content of a program. A metric should be a real objective
measurement of something such as number of bugs per lines of
code
A Good Manager Measures

Process Measurement
• We measure the efficacy of a software process indirectly.
– That is, we derive a set of metrics based on the outcomes
that can be derived from the process.
– Outcomes include
• measures of errors uncovered before release of the
software
• defects delivered to and reported by end-users
• work products delivered (productivity)
• human effort expended
• calendar time expended
• schedule conformance
Process Metrics
• Quality-related
– focus on quality of work products and deliverables
• Productivity-related
– Production of work-products related to effort expended
• Statistical SQA data
– error categorization & analysis
• Defect removal efficiency
– propagation of errors from process activity to activity
• Reuse data
– The number of components produced and their degree of
reusability
Project Metrics
• Used to minimize the development schedule by making the
adjustments necessary to avoid delays and ease potential
problems and risks
• Used to assess product quality on an ongoing basis and, when
necessary, modify the technical approach to improve quality.
• Every project should measure:
– inputs—measures of the resources (e.g., people, tools)
required to do the work.
– outputs—measures of the deliverables or work products
created during the software engineering process.
– results—measures that indicate the effectiveness of the
deliverables.
Typical Project Metrics
• Effort/time per software engineering task
• Errors uncovered per review hour
• Scheduled vs. actual milestone dates
• Changes (number) and their characteristics
• Distribution of effort on software engineering tasks
Software Measurements
Measurements can be categorized in two ways
• Direct Measures – Cost and Effort Applied
e.g: LOC, execution speed, memory size etc
• Indirect Measures – Abilities
e.g: functionality, quality, complexity, efficiency etc
Indirect Measures are more difficult to collect
Metrics for Software Project Size Estimation
• Size is measured of problem complexity in terms of effort and
time required to develop the product
• Two metrics are used to estimate size
– LOC-Line of Code
– Function Point
LOC Estimation
• All lines of source code except for comments and blanks, are
counted
• Accurate estimation of the LOC count at the beginning of a
project is very difficult.
• Estimate the LOC count at the beginning of a project, divide
the problem into modules, and each module into sub-modules
and so on, until the sizes of the different leaf-level modules can
be approximately predicted.
Typical Size-Oriented
• errors per KLOC (thousand lines of code)
• defects per KLOC
• $ per LOC
• pages of documentation per KLOC
• errors per person-month
• Errors per review hour
• LOC per person-month
• $ per page of documentation
An Example of LOC-Based Estimation
Statement of Scope:
The mechanical CAD software will accept two- and three-
dimensional geometric data from an engineer. The engineer will
interact and control the CAD system through a user interface
that will exhibit characteristics of good human/machine interface
design. All geometric data and other supporting information will be
maintained in a CAD database. Design analysis modules will be
developed to produce the required output, which will be displayed on
a variety of graphics devices. The software will be designed to
control and interact with peripheral devices that include a mouse,
digitizer, laser printer, and plotter.
LOC- based Example
Example: The range of LOC estimates for 3D geometric analysis
function is :-
Optimistic= 4600 LOC
Most Likely=6900 LOC
Pessimistic= 8600 LOC
Compute:
S=(opt + 4*likely + pess) / 6
Estimated LOC For 3D = (4600 + 4(6900) + 8600) / 6
= 6800 LOC

If Average Productivity = 620 LOC/pm


And , Labor rate = $ 8000 per month
Find cost per LOC, Total Project Cost, and Estimated effort?
Then,
Cost / LOC = labor rate / prod.
= 8000/620
= $ 13
Total Project Cost = LOC est. * (cost / LOC)
= 33,200 * 13
= $ 431,600
Total Estimated Effort = LOC est. / prod.
= 33,200 / 620
= 54 person-months
LOC Estimation
Advantages
• Easy to count
• It is an artifact of all software development projects
Disadvantages
• LOC measures are programming language dependent
• Its use in estimation requires a level of detail that is difficult to
achieve early in the development process