Maharashtra State Electricity Distribution Co.

Ltd

Office Name : AHMEDNAGAR U-IIS/DN.


Sanction No : 4200 / AHMEDNAGAR U-IIS/DN. / 55955461
Date : 01-Jul-2024

To,

Arvind Sayajirao Wavhal


S/64/poalt 144 Laxmi Nagar NAGAR AHMADNAGAR Ahmadn, agar (M Corp.), A-NAGAR CIRCLE,
Pin code : 414001
Mobile : 9422228488, Email : [email protected]

Subject:
Sanction Letter for 3.0 KW Rooftop Renewable Energy Generating System for Consumer
Number 162014953191 under Net Metering Arrangement.
Reference:
1. Your Application No. 55955461 dated : 01-Jul-2024

L
2. Technical Feasibility date : 01-Jul-2024
3. MERC Grid Interactive Rooftop Renewable Energy Generating System Regulations 2019.
C
Dear Sir / Madam,
D
Your application for Rooftop Renewable Energy Generating System vide above reference is hereby sanctioned
under Net Metering Arrangement at the above mentioned premises as under:
SE

Scheme Name: Applied At PM-Suryaghar Muft Bijli Yojna , Agency Name:

Existing Parameters:
M

Sanctioned Load 5.0 KW Contract Demand (in KVA) 0.0


DTC Code 4200580 DTC Name
Existing Rooftop RE 0.0 Tariff Category 40-Residential
Capacity (in KW)

Sanctioned Parameters:

Sanctioned RE Capacity Solar 3.0 KW


Sanctioned RE Capacity Wind 0.0 KW
Sanctioned RE Capacity Hydro 0.0 KW
Sanctioned RE Capacity Biomass 0.0 KW
Sanctioned RE Capacity Biofuel 0.0 KW
Total Sanctioned Rooftop RE Capacity 3.0 KW
Cumulative Rooftop RE Capacity(Existing + Sanctioned) 3.0 KW

Page 1 of 3
Net-Meter Specifications:

Type LT AC Single Phase Static Net Energy Meter


Capacity (A) 5-30Amp
Voltage (V) 240 Volts
Spec. No. Tech spec no. CE/T-QC/MSC-II/SP/Net/Date:12.01.2021

Sanction No: 4200 / AHMEDNAGAR U-IIS/DN. / Rooftop RE / 162014953191 / 55955461 / 01-Jul-2024

Terms and Conditions :


1. The validity of this sanction is for 06 (Six) months from the sanctioned date i.e. up to 01-
Jan-2025 from the sanctioned date 01-Jul-2024. If the Rooftop RE system is not installed
and installation report (Annexure-1) is not uploaded by 01-Jan-2025, this sanction shall be
deemed as cancelled and you shall have to apply afresh.
2. The metering arrangement and the inter-connection of the Renewable Energy Generating
System with the Network of the MSEDCL shall be as per the provisions of the MERC (Grid
Interactive Rooftop Renewable Energy Generating System) Regulations 2019 and the
technical standards and norms specified by the Central Electricity Authority for connectivity
of distributed generation resources and for the installation and operation of meters.
M
3. The eligible consumer agrees, that he shall install, prior to connection of the Renewable
Energy Generating System to the Network of MSEDCL, an isolation device (both automatic
and in-built within inverter and external manual relays); and the MSEDCL shall have access
SE
to it, if required, for the repairs and maintenance of the distribution Network.
4. The design, installation, maintenance and operation of the Renewable Energy Generating
System shall be undertaken in a manner conducive to the safety of the Renewable Energy
Generating System as well as the MSEDCL's Network.
5. The eligible consumer shall obtain all statutory approvals and clearances that may be
D
required, from the authorities such as from the Electrical Inspector (For System Above 200
KW)or the municipal or other authorities, before connecting the Renewable Energy
C
Generating System to the distribution Network.
6. The existing metering System, if not in accordance with the MERC (Grid Interactive
Rooftop Renewable Energy Generating System) Regulations 2019, shall be replaced by a
L

bidirectional meter (whole current/CT operated) and a separate Renewable Energy


Generation Meter shall be provided to measure Renewable Energy generation. The bi-
directional (Net) meter (whole current/CT operated) shall be installed at the inter-connection
point to the MSEDCL's Network for recording export and import of energy.
7. The Generation Meter and bi-directional (Net) meters shall be fixed in separate meter
boxes in the same proximity.
8. Separate Generation Meter shall be installed to each RE Generating source.
9. The Eligible Consumer shall bear all costs related to the setting up of the Renewable
Energy Generating System, including the cost of the Renewable Energy Generation Meter,
bidirectional meter(Net Meter) etc.
10. In case of the consumers availing Central Finance Assistance under MNRE's Rooftop
Solar Phase-II scheme or any other subsidy scheme, the terms and conditions of the
prevailing Tender Document shall be applicable.
11. Format of Agreement for Net Metering Arrangement / Net Billing
Arrangement(Annexure-3 / Annexure-4) are available on MSEDCL portal.

Page 2 of 3
Officer In-Charge
AHMEDNAGAR U-IIS/DN.

Note : This is a computer generated document. No signature is required.

L
C
D
SE
M

Page 3 of 3

You might also like