SWP Format and Example of REV-5 - Bof #3
SWP Format and Example of REV-5 - Bof #3
DEPARTMENT / PROJECT ENGINEERING & PROJECT DOC NO. E&P / TSK / SMS / SWP /01/ 2024
SECTION/ SITE SMS#1 REVISION NO Rev.- 01
JOB TITLE ESP HOPPER & DUCT INSULATION JOB AT SMS#1 BOF #3 WORK ORDER NUMBER 3800020581/118
SUB LOCATION TATA STEEL TSK WORK ORDER DURATION 06 month (From 08 JAN 2024 TO 08 JUN
2024)
VENDOR NAME M/S. S.H INSULATION VENDOR CODE: SI27
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
1 Before Start of Job. To avoid the job hazards. E&P SS/ENGG-07 – PPE
Toolbox And aware about job
Hazards – Unawareness of Safety rule, Job Hazards, Poor work AMIT KUMAR SS/GEN-04 -Foot
Knowledge & improper/no use of safety appliances may cause of 9040094273 Protection
injury/accident
SS/GEN-05-Hand
Precautions SAFETY Protection
Safety training by NTTF & specific training by Safety & TSL
Ergonomic will be ensured for all Workers & Supervisor SS/GEN-06-Eye
DEBAPRATA
before starting the job. Protection
SAHU
Workers will use Safety appliances, i.e. Safety shoe, Safety 8093954728 SS/GEN-07-Head
helmet, Hand Gloves, Goggles screens and full body Protection
harness with double lane yard during working at height. To avoid direct contact with WORKING SS/GEN-25- Work
No job shall be executed in absence of Competent Person hazards. AGENCY Permit
& Safety Supervisor. SADASIBA SS/GEN-36-Fire
Housekeeping to be done on daily basis and materials to be PRADHAN Prevention
kept safely & in order. 9937631456 SS/ELECT-06-
All electrical equipment should be in good conditions and Standard for
properly earthed and should be provided with ELCB WORKING Portable & Hand
authorized and licensed electrician only to be permitted to AGENCY SAFETY Held Electric
work on electrical lines/equipment’s. Sk Md Wajit Operated Tools
Proper illumination shall be ensured during night work. 9438302249 SS/ENGG-15-Storage
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
Proper Category workmen as required will be deployed for of Construction
entire job. Material at Site
Proper safe to work scaffold will be provided during height
work.
Tool Box meeting will be conducted on daily basis & six
directional Hazard will be identified & fill-up on daily basis
including awareness on Safety & Health
No job to be undertaken without work permit & SWP.
Good house-keeping to be ensured at site to avoid
slip/strip/fall hazard.
No work will be done under poor illumination or after dark.
Pathways for movement of men and materials to be
marked properly and should be visible.
2. Permit to Work. Hazards – Physical Injury / Electrical hazards / Fire Hazard / Gas E&P SS/GEN-25- Work
Hazards AMIT KUMAR Permit
Precautions 9040094273
Isolate the equipment to ensure “It is Safe” to work prior to
issue of any work permit. SAFETY TSL
Safe Work Procedure to be made in advance, in form : DEBAPRATA
EHSMSM / WORKS / 446 / 4009. SAHU
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
Working area to be barricaded
Tools/tackles tied with structure/body during working at
height.
8. Insulation Job at Hazards – Fall of persons To avoid direct contact with E&P SS/ENGG-07-PPE
hazards.
Ground Level / Precautions AMIT KUMAR SS/ENGG-05-
Height as Proper approach to be provided. 9040094273 Welding & Gas
required/Running Full body harness double lan yard to be used. Cutting
hot duct Fall arrestor will be provided. SAFETY TSL SS/ENGG-08-
Working area to be barricaded DEBAPRATA Scaffolding –
Proper scaffold to be provided to workers SAHU General
Hazards – Fall of materials 8093954728 Specification
Precautions
SS/ENGG-09-
Tools/tackles tied with structure/body during working at WORKING
Scaffolding –
height. AGENCY
Inspection,
Working area to be barricaded. SADASIBA
maintenance &
No loose materials to be kept at Height. House-keeping to PRADHAN
storage
be maintained 9937631456
SS/ENGG-03-
Hazards – Electrical shock
Precautions WORKING Working At Height
Only license holder/experience electrician/supervisor AGENCY SAFETY SS/ENGG-06-
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
10. Working at height Hazards – Falling of Person from height To avoid Falling of SS/ENGG-07-PPE
for Insulation job Precautions Person from Height SS/ENGG-08-
While working at height, double lifeline safety harness will hazards.
Scaffolding –
be tied with a rigid member having no sharp edge. General
Proper approved boatman scaffolding will be used during Specification
erection of scaffolding. “Safe Tag” to be displayed on the
SS/ENGG-09-
scaffolding structure after inspection by competent person.
Scaffolding –
Hazards – Fall of Materials from height
Inspection,
Precautions
Name: Mr P.No.: Name: P.No.: Name : GP No.:
Date: Date: Date:
E&P Departmental Representative/ Consultant E&P Safety Representative Working Agency / Contractor Representative
Remarks
1. 6 - direction hazards (Up/Down/Front/Back/Left/Right) of other jobs being done in close proximity have to be recorded daily and has to be discussed in the Toolbox Talk
2. Job specific SWP should be made and attached to this SWP with additional precautions for any additional activities (if any). This should be step by step including all steps.
3. The job specific SWP will be modified as and when the nature of job changes.
4. Training on SWP to be given to all workmen by E&P Officer / Consultant at the start of the job and thereafter least once per year and by Contractor representative on a monthly basis. The monthly training record should be attached with the monthly bill or Job
Measurement Report.
5. Review on status of implementation shall be done through Job Cycle Check by Safety Supervisor / Consultant/ E&P Officer at least once per month
E&P/ Safety/ 01 Engineering & Projects- TSK Effective date: 20-12-2023: Rev – 05
DEPARTMENT / PROJECT ENGINEERING & PROJECT DOC NO. E&P / TSK / SMS / SWP /01/ 2024
SECTION/ SITE SMS#1 REVISION NO Rev.- 01
JOB TITLE ESP HOPPER & DUCT INSULATION JOB AT SMS#1 BOF #3 WORK ORDER NUMBER 3800020581/118
SUB LOCATION TATA STEEL TSK WORK ORDER DURATION 06 month (From 08 JAN 2024 TO 08 JUN
2024)
VENDOR NAME M/S. S.H INSULATION VENDOR CODE: SI27
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
Working area to be barricaded maintenance &
Tools/tackles tied with structure/body when working at storage
height. SS/ENGG-03-
Working area to be barricaded. Working At Height
Hazards – Fall of tools & tackles SS/GEN-11-General
Precautions Safety
Proper PPE’s will be used as per Tata Steel standard.
Working area to be barricaded.
11 Measurement and Hazards – 1.clean the area where the insulation job has been To Maintain Job quality. E&P
inspection of 2. use proper ppe’s take all the safety measure , during inspection AMIT KUMAR
newly fixed shee Precautions 9040094273
1.Ensure sheet are property fixed and should not dislodged during
operation
2. properly measured the new sheet by meter measuring tape.
12. Welding & stud Hazards – 1. Radiation toxic fumes. To avoid fire & born SAFETY TSL SS/GEN-11-General
hazards.
welding on the Precautions DEBAPRATA Safety
surface ELCB and double earthling to be provided in W/M. SAHU SS/ENGG-07-PPE
Return path cable provided within two mtrs of job. 8093954728 SS/GEN-11-General
Wes guard to be connected while welding in water loge Safety Standard for
area, confined space& working at height. WORKING Mobile Crane
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
13. Gases area Hazards – Gas effect headache, fatigue ,vomiting To avoid gas hazards. SS/GEN-11-General
working insulation Safety
job Precautions SS/ENGG-07-PPE
Contractor supervisor must carry co detector
14. Working with Hazards – Un trained Genie Operator To avoid The falling Materials Handling.
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
Precautions
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks
Precautions
Before start up the job operator must fill up the check list after
thoroughly check the genie and handed over to the supervisor for
further checking.
Precautions
S.No Activities / Sequence Work Instruction / Hazard & Safety Precautions Why Responsibility Ref Document/ Remarks