Section Details
Project Name 1000 Square Yard Home Renovation Project
Outstanding (3 pts) The purpose of this project is to renovate a residential
property with a covered area of 1000 square yards, featuring a 2+4 room
Project Purpose or configuration, a 200 square yard lawn, and a 100 square yard parking area. The
Justification renovation aims to enhance the aesthetic appeal, functionality, and market value
of the home. This project is necessary to update outdated features, improve
living conditions, and increase the overall value of the property.
Outstanding (3 pts) 1. Modernize Living Spaces: Renovate all six rooms (2 master
bedrooms and 4 additional rooms) by upgrading flooring, fixtures, and repainting.
2. Enhance Outdoor Areas: Improve the 200 square yard lawn by installing a new
Project Objectives irrigation system, landscaping, and outdoor lighting. 3. Upgrade Parking Area:
Resurface the 100 square yard parking area and install a new carport for
protection. 4. Increase Property Value: Achieve a 20% increase in property value
through these comprehensive improvements.
Outstanding (3 pts) Scope Statement: In Scope: - Interior renovations in all six
rooms including new flooring, fixtures, and paint. - Lawn improvement with
irrigation, landscaping, and lighting. - Parking area resurfacing and carport
installation. - Upgrading electrical and plumbing systems where necessary. -
Project Installing energy-efficient windows and insulation. Out of Scope: - Structural
Scope/Deliverables changes to the home. - Renovations to the kitchen or bathrooms not specified in
the room configurations. Deliverables: - Renovation plan with detailed
specifications. - List of materials and appliances required. - Landscaping and
irrigation design. - Electrical and plumbing upgrade plans. - Energy efficiency
report.
Outstanding (3 pts) - Quality: All renovations must comply with local building
codes and standards. - Cost: The total project budget is capped at $100,000. -
Project Constraints
Schedule: The project must be completed within 8 months. - Resources: Limited
availability of skilled labor during peak construction seasons.
Outstanding (3 pts) 1. Design and Planning Completion: 1 month. 2. Procurement
of Materials and Initial Setup: 2 months. 3. Completion of Interior Renovations
Project Milestones (all rooms): 4 months. 4. Lawn and Landscaping Completion: 5 months. 5. Parking
Area Upgrade Completion: 6 months. 6. Final Inspections and Adjustments: 7
months. 7. Project Handover and Final Review: 8 months.
Project Cost Estimate Outstanding (3 pts) - Total Cost: $100,000 - High-Level Breakdown: - Interior
Renovations: $50,000 - Lawn Improvements: $20,000 - Parking Area Upgrades:
$15,000 - Electrical and Plumbing Upgrades: $10,000 - Contingency: $5,000 Basis
for Estimates: Estimates are derived from current market rates for materials,
labor, and contractor quotes, ensuring all costs are realistically projected based
Section Details
on industry standards.
Outstanding (3 pts) 1. Homeowner: Primary stakeholder with high influence on
design decisions and budget approvals. 2. General Contractor: Manages the
overall renovation project, coordinates with sub-contractors. Medium to high
Project Stakeholders influence. 3. Landscape Architect: Designs and supervises the lawn and outdoor
improvements. Medium influence. 4. Local Building Inspector: Ensures
renovations meet building codes and standards. High influence during inspection
phases.
Included (1 pt)
Charter Acceptance Project Sponsor Signature: _______________________________