Dear Sir,
Sandeep Agrawal
Director
Mob: +919893690221
INTRODUCTION:-
HARIOM GROUP was established in the year of 2004 under the dynamic & visionary
leadership of Chairman Mr. Santosh Kumar Agrawal with the team of young dynamic
and highly qualified Directors Mr. Sandeep Agrawal and Mr. B.D Agrawal.
As our objective is the customer satisfaction with premium quality. We feel immense
pleasure to announce that we have adopted Technology from USA for manufacturing
of EPOXY SHIELD REINFORCEMENT BARS (EPOXY COATED) & a fully online
computerized quenching system of Ra TMT INDIA. Our company is ISO certified
company and all product are BIS Approved.
TRUST
HARD WORK
INOVATION
QUALITY
CUSTOMER CETRICITY
CONTINUES GROWTH
WE HAVE THREE SECTIONS:-
PRODUCTS:
Our Products
* M.S Billets
* Dowels Bars
* Epoxy Coated Dowel Bars
* Reinforcement Bars
* Fusion Bonded Epoxy Coated Reinforcement Bars
* Corrosion Resistant Steel Bars
* Fusion Bonded Epoxy Coated Corrosion Resistant Steel Bars
BREIF ABOUT HARIOM EPOXY SHIELD REINFORCEMENT BARS:
HARIOM GROUP is working on its ore to core principle in its full integrated plant
where manufacturing of the Epoxy steel from steel melting to packaging of Epoxy
Coated Reinforcement bars all are done under one roof.
So, within a short span of time, the epoxy bars can be delivered against any or
displaced by the client, which obviously save their time and money. It also hastens
the construction work avoiding unnecessary delay at the work site too.
Corrosion can severely reduce the strength and life of structures ….. Ordinary steel
always prone to get corroded as and when it contacts with water. So, the FBE
coated Reinforcement bars are always recommended using in every construction
since they are more durable and their life span is four times more than that of an
ordinary bar.
Finally, FBE – Fusion Bonded Epoxy Shield Coating – A new scientific
formula & Technology from USA was introduced for the first time in
India by HARIOM GROUP.
FBE – Fusion coating Epoxy Coating is the new answer to the threat of looms over
many buildings and skyscrapers. Because, the answer should and it belong lasting
has to survive the test of the time.
When properly catalyzed and applied, epoxies produce a hard, chemical and
solvent resistant finish. They are typically used on concrete and steel to give
resistance to water, alkali and acids.
FBE coating has got many advantages. Since the coating is done on the fully
Automatic coating line, better quality control is achieved and it retains a uniform
coating thickness. Due to its adhesive properties it also helps maintain a good
bonding of coating with the steel because of flexibility, the coating does not get
damaged when the straight bar is bent during fabrication on a special mandrel.
FBE acts as an insulator for electro chemical cells and offer a strong barrier
protection to steel which prevents chloride ions pass through it.
There are four long tedious processing in the coating:
1. Surface preparation
2. Heating
3. Powder application
4. Cooling
1. Surface preparation is done by shot & grits blasting on bars. Impurities are
removed from the surface through surface preparation. Reinforcing steel is that, it
is blast – cleaned to a near white glowing metal finish using abrasives in shot
blaster. The shots clean the surface of the bar and grits provide an anchor (100 –
300 microns) to the bar surface.
2. The steel rebar pass through an induction coil for preheating. And flash heating
is done by using proper care. Temperature of the rebar rangers between 230°C to
250°C.
3. As powder leaves the gun, and electrical charge is imparted to the epoxy
powder particles. These electrically charged particles are attached to the grounded
steel surface providing a uniform coverage of the coating. When the dry powder
touches the hot steel, it melts, flows, and quickly gels as a film (100 – 300 microns
thick) on the reinforcing bars and on deformations while the residual heat cures
the coating.
4. For cooling of bars, the coated bars, after curing, are passed through a cooling
tunnel, where water is sprayed on to the bars to cool them. The bars are then
kicked off on to the final inspection rack for testing and inspection.
In the well equipped Lab, The testing on coated bars is carried out as per American
standard 775 and Bureau of Indian Standards specification requirements.
The acceptance test usually conducted is thickness measurements, flexibility test
and holiday test. Once inspected, they are bundled. Strait from the epoxy coating
line, a multi-layer poly-packing wrapping is done with an automated.
Besides all these, along with the epoxy coated bars the company also provides
after sales service solution. A FREE kit with paint brush & wire brush with epoxy
patch up compound to mend any scratches while cutting / welding & PVC coated
binding wire for binding of coated reinforcement bars at the construction site. This
is an extra post-delivery care given by the company for its valuable clients to
prevent & repair damages on the coated steel surface due to negligence.
Our product has been widely accepted in the market and is being used for
construction of Bridges, Dams, Barrages, Canals, under water construction,
Tunnels, Hydro Electric structure, Roads, Flyovers, Power plants, Cement,
Automobiles, Factories & Domestic Buildings etc.
CERTIFICATION:
HARIOM
TM
HARIOM
TM
[email protected]
Website: www.hariomepoxyshield.com
TMT Bars
T M T R E B A R S
Epoxy Coated Bars
EPO YSHIELD
Mumbai Unit
HARIOM
HARIOM COATING PVT. LTD. TM
[email protected]
About We are leading Manufacturer & Supplier of Epoxy
Coated TMT Rebars, TMT Bars, Dowel Bar, Epoxy
Our Vision
The core purpose of Hariom Group is "To
con nue our rich legacy by assuring, enduring
innova ve solu ons for all mankind".
Visionary
Global Leap Core Values
Trust Innova on
Hard work Customer Centricity
Quality Con nuous Growth
HARIOM Group intends to put all its strength for
the commercial expansion across the globe. We
understand the challenges that may come on the
way, simultaneously we keep our mo o
invincible and that make us move ahead. It gives me immense pleasure to introduce EPOXY HARIOM has installed facili es to produce 100,000
SHIELD as one of the renowned technology for TPY to be the largest Epoxy Coa ng plant in INDIA.
We would like to be er understand the manufacturing of Epoxy Coated Rebars from U.S.A. In line with Na on Vision of Green, clean & smart
technological advancement for the sustainable & now first me in India at Hariom Group, situated India, our responsibility is to contribute to the
business development with world’s leading in Steel City Bhilai, Chha sgarh, INDIA, with a vision secured growth of the construc on industry by
players. We invite global investment partners to provide solu on to concrete reinforcement providing con nuous solu on to the corrosion
and technology collaborators who wish to join us corrosion, one the serious problem in building new problem. While this call for a sustained effort to
for global expansion. We are also looking for “EMERGING INDIA”. improve the awareness on the benefits of using
partners who want to opt sustainable business Epoxy Coated Rebar, we are op mis c that our
development with us. Please reach us at The use of fusion bonded Epoxy Coa ng on Rebar is joint efforts would facilitate us in emerging
[email protected]. considered by many researchers and engineers to successful in our endeavors.
be most cost effec ve techniques for comba ng
corrosion. Through stringent quality assurance
prac ce followed during Epoxy Coa ng on the black
bars produced in Hariom has established its
creden als in the Indian market, especially in
Central India which has been growing consistently
over the years.
01
10 02
Our
Our Product Supplies
Products
Range of Products
04
IS : 2830 IS : 2831
CML-5900008511 CML-5900059411
Our modem steel mel ng Shop consists of EIF, LRF and a con nuous
MS Billet cas ng machine. The quality is controlled by highly trained personnel by
Range means of con nuous tes ng and process control. This shop produces
100x100mm billets/blooms in various special steel grades as per BIS, ASTM & BS
110x110mm Standards.
Qatar Doha Airport Taxiway Dammam Port Saudi Arabia
03
10 04
Our Products
Mechanical Properties
HARIOM FE 500D HARIOM EPOXYSHIELD HARIOM Fe-550 D HARIOM EPOXYSHIELD
Fe-500 D (IS Fe-550 D (IS
Properties EPOXYSHIELD CRS/LAS Fe-500D CRS/LAS EPOXYSHIELD CRS/LAS Fe-550 D CRS/LAS
1786-2008) 1786-2008)
500 D Note # (Note #) 550 D (Note #) (Note #)
Yield Stress N/mm (Min) 500 520 500 520 550 560 550 560
Tensile Strength N/mm (Min) 565 630 565 630 600 640 600 640
Stress Ratio UTS/YS (Min) 1.10 1.15 1.10 1.15 1.08 1.10 1.08 1.10
CORROSION RESISTANT STEEL (CRS) BARS
Note # - IS 1786-2008 (As per clause 4.2, Note - 3)
(Corrosion Resistant Steel) TMT Bars are made from various corrosion resistance elements. The high corrosion-
Section Weight / Per Meter of
resistant feature in the CRS TMT Bars will be suitable for all the construc on projects such as bridges, large Quality Checks
dams and mainly they can be used for construc on in the coastal areas. CRS Bars will allow the building to resist
HARIOM EPOXYSHIELD REBARS
the corrosion and increases the longevity of the building structure and also it is a cost-effec ve solu on for BIS Standard HARIOM
DIA (mm) Minimum (BIS) Maximum (BIS) Tolerance (BIS)
corrosion. It will reduce the rate of corrosion at the early stage of building construc on, which makes the EPOXYSHIELD Max
building stronger and resist it from earthquakes. HARIOM CRS TMT Bars reduces the cost of repairs that are
8 0.367 0.395 0.422 ± 7%
caused due to corrosive damage.
10 0.574 0.617 0.660 ± 7%
S+P (%) Max 0.075 0.075 0.075 0.075 REBEND 4d for 8 to 10 4d for 8 to 10 6d for 8 to 10 6d for 8 to 10
Carbon EQ (%) Max 0.42 0.42 0.42 0.42 0.42 0.42 6d for 12 to 36 6d for 12 to 36 7d for 12 to 36 7d for 12 to 36
05
10 Note : Where d is the nominal size of test piece in mm. 06
Lab Our Products
Tes ng MS Dowel Bar
Steel Standard ASTMS 615, ASTMA 1678, ASTMA 775, 854449, AASITO M254
Tes ng Resistance to Applied Voltage Test Salt Spray Test Ends Chamfering & plain through CNC driven machine cut
IS : 13620 Dowel Bars are smooth round bars which mainly serve as load transfer device
across concrete joints. They are placed across transverse joints of concrete
CML-5900034815 pavement to allow movement to take place. Where movement is purposely
designed for longitudinal joints, Dowel Bars can be adopted. Based on the
Tes ng Bending Test varied industrial applica ons, we can make available wide range of Dowel
Bars that are manufactured in different possible specifica ons. Dowel Bars
are Hot Rolled Plain Round steel bars conforming to ASTM A615/A615M.
EPO YSHIELD
HARIOM TM
We keep rich inventory of Dowel Bars in many different diameters and lengths ready for immediate shipment. Our
S T E E L R E B A R S ESSENTIAL FOR TODAY
Dowel Steel Bars are suitable for a variety of construc on and pavement applica ons.
Packing Packing
Parameter ASTMA775:2007 BS14654:1999 BIS 13620:2004 HARIOM Epoxy Shield Coated Standard IS, ASTMA775 & A775M
Bar anchor pro le 1.5-1.40 mils 1.96-2.75 mils As per IS1786:2008 Con rming to IS 1786:2008 Ends Chamfering & plain through CNC driven machine cut
Coating thickness 7-16 mils 7-12 mils 100-300 microns 100-300 microns Grade ASTM615/615M Grade 40 & 60, 75 ASTM A4996, Grade 40,50,60, 75
(175 to 400 microns) (170 to 300 microns)
Length 100mm to 6000mm
Coating holidays 3 Holidays/m Max 4 Holidays/m Max 6 Holidays/m Max 5 Holidays/m Max
Diameter (mm) 16-50
Coating Flexibility 180 deg bent using 180 Deg bent using 120 Deg bent using 8D & 10D complying
8D 4D & 6D with all standards Diameter (inches) 5/8" - 2"
HARIOM Epoxyshield TMT Bars are made with an eye for quality that will
make everything else look imperfect, adhering to the superior quality
standards, these bars are made with the finest raw material.
Hassle free procurement, No hassles for sending TMT bars to some other place for job coa ng. Saving of
transporta on cost and me. Hence no delay in Projects.
World's biggest line for rebar coa ng with capacity to coat 24 bars simultaneously at a me.
First me in the Globe we are doing packing on EPOXY coated rebar using poly stretch film with UV
protec on in fully automa c packing line to ensure less abrasion and damages while handling.
India's First BIS Approved Epoxy Coated Bars as Per BIS -13620.
EPO YSHIELD
HARIOM TM
Rebars are manufactured using High Yield High strength and duc lity due to fine grain Mul - MS Binding Wires
Quenching end Self Tempering (HYQST) phased composite Structure.
Technology preferred by Tempcore.
MS Wires play an important role in providing tensile
Provides precise and uniform parallel rib pa ern Excellent bond strength with concrete. strength to the structures with durability uniform
engraved through computer controlled CNC notch
making machines.
Diameter/Size all over. It is manufactured using high
quality raw material.
Epoxy Coa ng Done by following ASTM & BIS Excellent protec on from corrosion for long life
standards with EPOXY SHIELD technology ( USA). period to civil Structure.
Meets UTS/YS (Ul mate Tensile Strength to Yield Superior earthquake resistant quali es due to high
Strength) ra o and high percentage elonga on. capability of absorbing energy. PVC Coated Binding Wires
Surpasses minimum specified level of Bureau of More value for money.
Indian Standard (BIS) . Specially made for Binding on Fusion Bonded Epoxy Coated
Has predefined and transparent pricing. Fixed and uniform rates evidenced through a well TMT Rebar. Inner Core consist of Galvanized Wire & Outer Core
displayed price list at our dealer's shops. Consist of Specially "PVC`for Tough & Durability. It is 100%
Water, Acid & Chemicals Proof, Rust and Corrosion free.
First brand In INDIA for epoxy coated TMT Rebar. World class interna onal quality.
11
10 12
Pres gious Clients Pres gious Clients
JMC PROJECTS (INDIA) LTD. Maharashtra State Power Generation Co. Ltd. South Eastern Central Railway The Uralungal Labour Contract
Co-operative Society Ltd. G.D. Construction & Co.
FA
Construction
KOLKATA MUNICIPAL
CORPORATION
(KMC)
10
JMC PROJECTS (INDIA) LTD.
13
10 14
For any other
communication
Raipur Branch Offi ce-Govind S arang Complex, 2nd
Address: Floor, New Raiendra Nagar, Raipur,
RAIPUR, CH H ATTI SGARH,492OO 6
Phone: 077I-2419404
Fax: 07712419404
E-Mail: [email protected]
Web: www.bis.org.in, www.manakonline'in
clwl-No TiT"
of the Licensee with the Factory Name of the product Indian Standard No.
AOOTeSS
Whereas, the licence was valid upto Twenty December Two Thousand Twenfy Two.
Nder, consequent upon renewal, the validity of the licence given in schedule of the Licence Dated L9-DEC-2022 has been extended from Twenty
December Two Thousand Twenty TWo to Nineteenth December Two Thousand Twenty Four
Manak Bhavan, 9 Bahadur ShahZafar Marg, New Delhi 110002. ,9 Bahadur ShahZafar Marg, ,D8LHI,110002
Whereas, the licence was valid upto Twenty Fourth March Two Thousand Twenty Four.
Now, consequent upon renewal, the validity of the licence given in schedule of the Licence Dated 23-MAR-
2024 has been extended from Twenty Fourth March Two Thousand Twenty Four to Twenty Third March Two
Thousand Twenty Six
And, whereas the renewal was deferred till 18-Mar-2024 and licensee was not allowed to use or apply the
Standard Mark from 24-Mar-2023 to 18-Mar-2024.
Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002. ,9 Bahadur Shah Zafar Marg, ,DELHI,110002
Contact No: +91 11 23230131, 23233375,
Fax: +91 11 23234062, 232 Email: [email protected]
23239402
For any other
communication
Raipur Branch Office-Manakalaya,
Plot No. 13-C,, Sector-24,Nava
Address:
Raipur,Atal Nagar, Raipur,
RAIPUR,CHHATTISGARH,492101
Phone: 0771-2419404
Fax: 07712419404
E-Mail: [email protected]
www.bis.org.in,
Web:
www.manakonline.in
Whereas, the licence was valid upto Fifth November Two Thousand Twenty Five.
Now, consequent upon renewal, the validity of the licence given in schedule of the Licence Dated 04-
NOV-2025 has been extended from Fifth November Two Thousand Twenty Five to Fourth November
Two Thousand Twenty Seven
Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002. ,9 Bahadur Shah Zafar Marg, ,DELHI,110002
Hariom Ingots and Power Pvt Limited - Carbon Steel Cast Billet Ignots, Billets,
5900008511 Plot No. 59 and 60, Light Industrial Blooms and Slabs For Re-rolling into IS 2831 : 2012
Area , , Bhilai : 490026 Structural Steel (Ordinary Quality)-
Whereas, the licence was valid upto First June Two Thousand Twenty Three.
Now, consequent upon renewal, the validity of the licence given in schedule of the Licence Dated 31-MAY-2023 has been extended
from First June Two Thousand Twenty Three to Thirty First May Two Thousand Twenty Five
Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002. ,9 Bahadur Shah Zafar Marg, ,DELHI,110002
APPROVAL FOR EPOXY COATING - MMRDA
MMRDA
FaTT RATT 3777 HETHT
To
Project Director
SYSTRA-CEG-SMCIPL CONSORTIUM
3rd Floor, Universal Business Park,
Kamani Oil Mills Road,
Chandivali Estate, Andheri (E)
Mumbai. Maharashtra 400072.
Email: [email protected]
This office is in receipt your letter under ref (1), As recommended in the letter
approval is hereby accorded for FBE coating for steel reinforcement Bar from M/s Hariom
Coatings Pvt. Ltd...
(Madhukar Kharat)
Chief Engineer
Metro-PIU, MMRDA
Copy to: Project Manager, M/s. JKIL, Metro Line 9.
qriiardr swttfu{
(, gt#,g,g"
CITY AND INDUSTRIAL DEVELOPMENT GORPORATION OF MAHARASHTRA TIMITED
(crN - u99999 MH 1970 SGC - 0r4574)
nreO. OFFICE: HEAD OFFICE:
"NIRMAL", 2nd Floor, Norimon Point. CIDCO Bhovon. CBD Belopur.
Mumbgi - 4O0O21. Novi Mumboi - 400 614,
PHONE : OO-91-22-6650 0900 PHONE: 00-91-22-6791 8.|00
FAX : 0O-91-22-22022509 FAX :00-91-22-6791 8166
per. ruogtDcor EE
(PA & Ry P-2025r202A Bg Datti.02.2022
To;
M/s Hariom Ingots & Power Pvt. Ltd,
Plot No 59,60 & 61, Light Industrial Area,
Bhilai- 490026, Chhattisgarh (India)
Contact Person: Mr Ved Prakash
Mob.No:+91 7400192321
Tel : 0788-4083301 /4049063
Email : [email protected]
Page 1 of 2
J-{
In case of any corruption related complaints, please visit :
Yours fafthfully,
l\r
,_u_"1
(N.P.Wani) \4'42s'.,-.
Executive Engineer (PA & R)
CIDCO Ltd, 3'd Floor,
CIDCO Bhavan, CBD Belapur,
NaviMumbai-4O0 614
Page 2 of 2
UOI{ EI{GINEERING CONSULTAiITS ryT, LTD, TECHNOGEM CONSULTANTS PvT. LTD.
Lion Tower, Plot No. 97, Elegant State, Near Mother Office 803, 8th floor, B-wing Lodha Supremum ll,
In JV with
Teresa Sdrool, Kolar Road, Bhopal - 462042 (M.P.) Near New Passport Ofice, Road no. 22,
Ph: 0756 2879,t9982132yB21il37 13212728 Wagle Estate, Thane - 400 60'[
email: [email protected] Ph.: 02{97 19899 I 197 177 99
email : [email protected]
Date:29.M.2022
Tq
The Project Director (Nodal),
MSRDC Infrastnrcture Projects Limite{
Opp. BandraReclamation Bus Depo!
Near Lilawati Hospital, KC Marg,
Bandra (W), Mumbai-40005 0
Email : [email protected]
Sub: Constnrction of 6/8 laning of existing 4lane Vadape to Thane from Km 539.202 to Km
563.000 section of NH-3 (New NH-848) Under Bharatrnala Pariyojna in the State of
Ivlaharashtra to be executed on Hybrid Annuity Mode - Consent to Uarion nooxv Co s
Dear Sir,
This is with reference to above cited letter under reference at sr. no. i) wherein Chemical test
reports for diameter 08mm, 10mm, l2mm,l6mm, 20mm, 25mm and 32mm from VNTI Nagpur
has been submitted for review of IE.
In this concern refer letrer no. 3931; dated: 08.04.2022; urherein conditional consent for
procurement of epoxy coating TMT bar (FBEC) has been issued. Further, IE has reviewed above
submitted chemical test reports and consented the sarne to use in construction work provided
compliance / submission given below:
l. During construction period, the Concessionaire shall arrange all testing (as specified in clause
602.2.8 & 1009 of MORTH Specifications) from third party laboratory (other than site
laboratory) as md when required by the Independent Engineer.
2. The Concessionaire shall ensure to collect manufactures test certificates for all tests (As specified
in clause 602.2.8 & 1009 of MORTH Specifications) for each supply and the same shall be
available in site laboratory.
3. As per NFIAI Policy Matter-Technical (l4ll20l3) vide I l04ll2l8/2007-Adrnn; dtd: 12- 08-2013
"All steel shall be procured form "Original producers" who manufacture billes directly from iron
ores and roll the billets to produce steel confinning to 13:1786. No re-rolled steel shall be
incorporated in the works."
4. The Concessionaire shall zurange adequate storage of steel at construction site or camp or
as per manufacturer guidelines and good industrial practices.
5. [t will be ffre responsibility of the Concessionaire to obtain the test certificates of
W
PK&ct Office - Fht No. 102 A 105, Firct Floor, Chandrabhaga Building, Near Retiance lrta*et, Parsik
Kalwa, Thane- 4fi1505. Phone: +91 Eil569 11104, email: [email protected]
Page 1 of2
fimish ftem to ftis offie as andwhen required.
6. ln case the test results indicate that the bars procured do not confimr to the specifications, the
same shall be rejected and it shall be removed from the site of work.
7. The steel bars shall be stored at site of work in such a way as to prevent their distortion.
8. The rwiew of Independent Engineer does not relieve the Concessionaire from its obligations and
liabilities under the Concession Agreement in any manner.
(r.
Tearn
Cc: l. The Project Drector, NHA[, PIU, Thane for information please.
2. The Authorized Signatory, Sr. CGM (Tech/BD), Lion Engineering Consultant hrt. Ltd For
information.
3. The Executive Director,IWs Technogem consultants hrt. Ltd. for infonnation.
Prdect Office - Flat No. 102 & 105, First Floor, Ghandrabhaga Building, Near Rellance ilarte( Parsik Nagar, Kharigaon,
Kalwa, Thane- 4{Xl6O5. Phone: +91 83569 1110'1, emai!: [email protected]
Page 2 of 2
BRIHANMUMBAI MUNICIPAL CORPORATION
No. Ch.E. |B.M. /02923/11 date 17 MAY 2023
Office of the
Dy. Chief Engineer (B.M.) City
Engineering Hub Bldg.3rd Floor,
Dr.E.Moses Road, Worli Naka,
a Worli, Mumbai - 400018.
TO, RumbaiMunicipal
M/s. Hariom Ingots & Power Pvt. Ltd.,
Plot 59-60, Light Industrial Area,
Bhilai, Chhattisgarh- 490 026.
Gentlemen,
The Director (E. S. & P.) is pleased register your following products as per
table-1 in the list of Approved Building Materials maintained by this office
provisionally for a period of THREE YEARS i.e. from the date of issue of this letter,
subject to the following conditions.
TABLE -1
1of 3
2) This registration shall not bind B.M.C. to give your products any priority or
preference and placement of purchase orders and does not guarantee that all or
any of the enquiries for the above items would necessarily be sent to you.
3) For renewal, the invoice/s for the product/s purchased by contractor/s for the
B.M.C. works shall be submitted to the office of respective Chief Engineer in
charge.
4) The product/s itself shall invariably bear the brand name and all the relevant
details such as date/year of manufacturing, etc.
5) The product/s shall be in conformity with relevant BIS/ISO standards. You shall
keep your BIS/1S0 registration valid and subsequent validations shall be
intimated to this office.
6) The training for the Municipal's engineering staff and Contractor's staff regarding
the technical information, product application, procedure, workmanship to use of
your registered products shall be arranged free of cost at B.M.C. sites to all the
B.M.C. Engineers departments in consultation with Chief. Engineer (Building
Maintenance) in every six months and the compliance report in that regard shall
be submit within first 6 month of the registration period and thereafter every year
(including sitevisit &field report).
7) Your representative shall inspect the B.M.C. sites where your registered products
are being used, at least once in a quarter year and the report shall be forwarded
to the Chief Engineer (Building Maintenance).
8) The change in the rates shallbe informed to this office.
9) The necessary tests shall be performed for the registered product/s as per the
relevant specifications, free of cost for assuring the quality of product/s during
and after the project/construction work is over, as and when required by the
Engineer in charge.
10)The application for renewal of this registration shall be submitted to concerned
Executive Engineer of B.M.C. two months prior to the expiry date, along with the
non-refundable renewal fees and necessary documents as applicable then and
performance certificates of registered product/s from an officer. The renewal will
be done on its merits.
2 of 3
Please note that if it is observed that the product performance on B.M.C. works
without assigning
1S not satisfactory, this registration will be revoked by the B.M.C.
any reason thereof.
advertisement of
This registration shall not be construed as a certificate for
authority.
your product/s and for obtaining registration /approval from any other
Yours faithfully,
umbal
To,
M/s. Hariom Coating Private Limited
Plot no. 210 & 211, Village-Gaurapur,
Tq- Wada, Palghar -421312
Gentlemen,
The Director (E. S. & P.) is pleased to register your product Anticorrosive
Treatment to Reinforcement Steel Bars- Fusion Bonded Epoxy Coating"
confirming to IS 13620:1993 in the list of ApprovedBuilding Materials maintained by
this office provisionally for the period of THREE YEARS from the issue of this letter,
subject to the following conditions.
1) This approval has been granted on the basis of documents/information furnished
by you at the time of application.
2) This registration shall not bind B.M.C. to give your products any priority or
preference and placement of purchase orders and does not guarantee that all or
any of the enquiries for the above items would necessarily be sent to you.
3) For renewal, the invoice/s for the product/s purchased by contractor/s for the
B.M.C. works shall be submitted to the office of respective Chief Engineer in
charge.
4) The product/s itself shall invariably bear the brand name and all the relevant
details such as date/year of manufacturing, etc.
5) The product/s shall be in conformity with relevant BIS/ISO standards. You shal
keep your BIS/ISO registration valid and subsequent validations shall be
intimated to this office.
6) The training for the Municipal's engineering staff and Contractor's staff regarding
the technical information, product application, procedure, workmanship to use of
1of 2
your registered products shall be arranged free of cost at B.M.C. sites to all the
B.M.C. Engineers departments in consultation with Chief. Engineer (Building
Maintenance) in every six months and the compliance report in that regard shall
be submit within first 6 month of the registration period and
thereafter every year
(including site visit &field report).
7) Your representative shall inspect the B.M.C. sites where your registered
products
are being used, at least once in a quarter year and the report shall be forwarded
to the Chief Engineer (Building Maintenance).
8) The change in the rates shall be informed to this office.
9) The necessary tests shall be performed for the registered product/s as per the
relevant specifications, free of cost for assuring the quality of product/s during
and after the project/construction work is over, as and when required by the
Engineer in charge.
10)The application for renewal of this registration shall be submitted to concerned
Executive Engineer of B.M.C. two months prior to the expiry date, along with the
non-refundable renewal fees and necessary documents as applicable then and
performance certificates of registered product/s from an officer. The renewal will
be done on its merits.
11)lf any dispute arising in respect of registration OR supply of material to B.M.C.
contractors, the cause of action thereof shall be deemed to have arisen in
Mumbai and all legal proceeding in respect of any dispute shall be instituted in
competent court in the city of Mumbai only.
During the factory visit to the product manufacturing factory premises, if any
deviations from the quality of product are observed, this registration certificate will
be revoked by the B.M.C. without assigning any reason thereof.
Please note that if it is observed that the product performance on B.M.C. works
is not satisfactory, this registration will be revoked by the B.M.C. without assigning
any reason thereof.
This registration shall not be construed as a certificate for advertisement of
your product/s and for obtaining registration / approval from any other authority.
Yours faithfully,
2 of 2
CPWD - APPROVED VENDOR LIST
APPROVAL COPY - MHADA 1
APPROVAL COPY - MHADA 2
of Compliance
NQAC
INTERNATIONAL
Issued
For
ISO 9001:2015
QUALITY MANAGEMENT SYSTEM
This Certificate is applicable to the following product or service ranges
“Fusion Bonded Epoxy Coating on Steel Products”
NQAC
ISO 9001
NQAC
INTERNATIONAL
www.nqacintl.com INTERNATIONAL www.iimsedu.org
Knowledge Partner Authorised Signatory
This Certificate is issued as per procedure of Quality Management System, Which will be monitored by NQAC International.
AC Certificate validity is based on successful completion of surveillance audits & to check certificate’s status visit www.nqacintl.com.
NQ
National Quality Assessment & Certification - International
This statement of compliance is for the exclusive use of NQAC INTLs client and is provided pursuant to the agreement between NQAC INTL and its Client. NQAC INTL's
responsibility and liability are limited to the terms and conditions of the agreement. NQAC INTL assumes no liability to any party, other than to the Client in accordance with the
agreement, for any loss, expense or damage occasioned by the use of this statement of compliance. Only the Client is authorized to permit copying or distribution of this
statement of compliance. Any use of the NQAC INTL name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in
writing by NQAC INTL. As applicable, the observations and inspection results referenced in this statement of compliance are relevant only to the sample inspected.
PURCHASE ORDER COPY FOR INDIAN OIL CORPORATION PROJECT
ErrcrE F;rs dfffiElar srTs aCaI fufuag
(rffm Wf.r;ft .tr1 -..fO{)
Tg'
' i\l/s Inrporl'crtr:rns |tvl. l,td,
Kokilu llc.sirlcncl', lrr Floor, rtttttnl:t \/ilt:tr,
Pokhlri put, lf ltuluncsr\'!tr, () l) lSl I r\- 75 | (f 2ll.
li nr n il : n b lr is t' k. d :t s in) t' ttt p ort' e r I t':t tt s. co ttt
li:rd-AUu. sJ1-r\!!15q k !-I! l lt,-$ r, tV'nr ;u.cr- ill u q,c ! _l[r111ir gqn-q n0
StlR: Supph' ol'cptrxl' cortlcd ol' Ill; Stccl lirr cottstruction lvork oI'220KV D/C Pandiabiti-
Sentngru l't. of OPTCt..
Desr Sir.
\\Ic herebv convey our in-principle acceptance to your request for supply of Fusion boncled epory
coated reinforcement steel from lv{/s Hariom Ingots and Porver Pvt Ltd, Bhilai specific to this
proj-e_ct only'rvith the lbllowing terms and conditions.
l. Source of fusion bonded epoxy coating material shall not be changed after successful testinp
of the sarnples.
2. Bare reinforcement steel bar shalt be ananged/procured by IWs Emporvertrans from
POVERGRID approved vendors for the above which are required to stored/stacketl separately
for proper identification and smooth & easy handling.
3. Traceability records & internal quality records shall be maintained by rhe parry
61ul/s
Emporver).
4. The epoxy coated reinforcement steel shail confirm to IS 13620.
5' Iv{anufacturing 1-est certificates with mentioning conesponding
MTC of R.,\W nraterials shall
be provided for each lot for tests given in the relevant IS code.
6' POWERCIUD rescrvc thc rigtrt lo carry out inspection ot'Bare RF
Steel as l,cll as pre-dispatch
inspcction of cpoxy coalcd IU; stcel as & lvhcn rcquircd.
7 ' I hc storage and handling ol'thc nratcrials to bu strictly conrplied in line rvith LOr\ TS l.l 1.3
IS-l 3620,
Continue. ,..p12.
gnBffiqffi,:qlre i.-
odisha Proletts: Plot no. a, Unit.41, Niladri vihar, chandrasekharpur, Bhubaneswar
rdffifr, - 751021, Tel:0624-2?20754
dqftc frrr: Flrd;icr-2, tEr<-zg, rrFrnT-122oor(gfu1q11, 0124zs?1700-719 tffirrrg:
corporate office: "5audamini", Ptot no.2, sector-Z9, Gurugrarn-122001, (Haryana).
Tel: 0124 257170G719
rtrfi.S 3fiffi: fr-g, *aq fserc,Err.r rrftqr, qzotftqr s<rq, r* ftd-rro ore, iq._fiQqg;0u-26s6ou2, 26s60lt r,
26564872
Ilegistcred office: B-9, Qutab Institutional Area, Katwaria 5arai, New Delhi-l10
016. Tel: 01l-2Gs6o1lz, 26s60llt, l6s6dsll
w,powergridindia.com
Page-02
llence. )/ou n)ay carry out Epoxy Coating of supplied RIi Steel on standar4
length TIvIT bars of
POWERGRID approved ntake (TATA, RI , SAIL & JSPL) to lrlls Ilariom
Ingots and Forver
Pvt l-td. $'orks at 59-60' Light Industrial Area, Bhillai for the commencement
of foundation work
of sulrject line at earliest.
Thanking you,
Yours Faithfully
Pzlzo>t
(P K Jena)
DGM @rojects)
Copy: For kind information please
l)
Senior GM (Projects) Bhubaneswar
2) Senior GM (Engg.) Bhubaneswar
3) GM (PESM), Bhubanesr,var
CONTENTS
Sr. Description Page
No. No.
1.0 Manufacturing Process 2-4
2.0 Quality Assurance Plan 5-6
3.0 Manufacturing Process Flow Chart.
4.0 EPOXY Shield Coating Procedure 7
I Scope Of Procedure 7
II Coating Material 7
III Procedure Description 7
III.1 Reinforcement Bars 7
III.2 Surface Preparation 7
III.3 Application of Coating 8
IV Coating Inspection 8
IV.1 Coating Thickness 8
IV.2 Continuity of Coating 8
IV.3 Adhesion 8
V Test Methods 9
VI Retest 9
VII Removal of Non-comforting Products 9
VIII Repair Procedure 9
IX Handling & Identification 9
5.0 Quality Assurance Plan(Inspection & Test Plan) 10
Format of Bare Bars Inspection Report
Summary of In-process Quality Control Report
Format of Coating Thickness Record
Format of Testing of Continuity of Coating
Format of Testing of Adhesion of Coating
Format of Test Certificate of Steel bars and FBE Coating
MANUFACTURING PROCESS
After the complete melting of charge, the hot liquid metal samples are taken to analyze the chemical
ingredients present, i.e. carbon, manganese, silicon, phosphorous, sulphur etc. In order to balance
chemistry of the metal as per required grade silicon, manganese and Ferro silicon is added. The
temperature of liquid metal is raised upto 1680 degree centigrade for casting.
Charging
Charging is the process by which raw materials such as following. Pig Iron and Processed Iron Ore,
Met coke are fed into the furnace. Exposure to toxic metal fumes, carbon monoxide, heat stress, and
other toxic gases are the main hazards associated with furnace charging.
Melting
Melting is the process by which the charge material is melted by giving suitable Electrical power in
Induction Furnace.
Removal of slag
This is the process by which unwanted debris is removed from the molten metal. This process is
carried out manually as per requirements in floor time to time.
Refining
Refining is the process in which required alloying additions are done and undesirable impurities are
removed from the steel through various oxidation treatments & ferro alloys killing.
Tapping
Tapping is the process of transferring the molten metal into a ladle from the furnace at required
Temperatures for casting.
After Ladle Set on the CCM Stand Ladle Slide Gate Opened through Hydraulic Force & Molten Metal
Poured into the Tundish. After Tundish Level gained for billet casting then Tundish Nozzle Opened for
Continuous Casting of Billets & molten Metal started pouring in Copper Mould Tube . With the Help Of
Oscillation Process Hot Billet Starts coming out from Copper mould Tube through Machine Radius
cooled with pressure water Jets towards withdrawal strands. After that Billet goes through automatic
Shearing Cutting of Hot Billets and shipped to Rolling Mill with high Speed Conveyors for Rolling Of
TMT Bars to Rolling Mill Division.
1.1 PROCESS OF MANUFACTURING HSD/QST BARS
100 mm square M. S. Billets we receive from Continuous Casting Machine which is Directly Hot
Charged to our Rolling Mill as per our required Rolling Size sheared by Hot Shearing Machine
automatically with fully computerized PLC Unit and it is directly Rolled to TMT Bars as per Size
and Quality.
In our 16” Roughing Mill there are 4 stands driven with the help of 1250 HP motor, flywheel,
reduction gear, and pinion into several passes to achieve intermediate and finishing mill size. The
Cutting/Shaping of Grooves/Passes in Rolls being taken care by experienced Foreman/Engineers In
charge of the Rolling Operations. The material feeded into the first pass of the roughing mill travels
via various Intermediate Stands and to the finishing stands in between the front and the back end
(split ends ) of the material Sheared by the help of Alligator type shearing machine. The forth stand
of Roughing Mill is exclusively for Finishing Pass of Dia 25, 28 and 32 mm only. The hot material
moves through various passes in oval-square series in the rolling mill.
From the third stand of roughing mill material moves to the first stand of intermediate mill. From
first stand it goes to second, third, fourth stand. Which is the finishing stand for 16 & 20, mm dia
from the last stand of intermediate mill material passes through the first finishing mill which is the
finishing stand of 12 mm dia. HSD/QST Bars. From the second stand of first finishing mill there
are four continuous stands from where the 8 mm and 10 mm dia. HSD/QST Bars gets finished.
Hot Rolls bars from the finishing stands of rolling mill passes through the Ra TMT system where
the bars gets quenched by water under controlled pressure. The temperature of Bars at the entry
point to Ra TMT system is 950 to 1000 °C and after passing through the cooling pipes of the Ra
TMT system the temperature of Bars is reduced to 580 to 620’C to get desired grade of Fe-500. At
cooling bed bars having temperature of 580 to 630’C get natural thermal exchange of temperature
as the inner core of bar which remain hot expends temperature towards the outer surface of bars and
extra hardened surface of bars get normalize and a hardened tempered surface of marten site at
periphery and the fine grain ferrite perlite structure in the central zone forms. The cooling pipes of
Ra TMT system gets cooled water from cooling tower via cold water pumps the quantity and
pressure of water entering through the pipe is control as per the size being rolled of different grades
such as Fe-500.
1.2.5 PHYSICAL TESTING OF HSD/QST BARS.
After the Ra TMT process every 20 minutes taken a sample of bars checked the section weight As
per IS: 1786 then physical tests done at UTM for Yield stress, Ultimate load & Elongation % of Bar
sample as per IS: 1786 all tested done at our fully computerized laboratory by Experienced Quality
Control Engineers & Chemists.
Bars after getting thermo Mechanical Treatment reaches to the cooling bed where is being cooled by
natural cooling upto handling condition and cut to the required length of 12 Meters and bundling of
bars done and stacked in a lot or batch for commercial Sales.
The finished material marked with tag containing the details of marking like lot No. / Size / etc. after
complete mechanical / Physical testing etc.
2.0 QUALITY ASSURANCE PLAN
CONFIRMING TO IS 2831
W = Witness R = Review
QUALITY ASSURANCE PLAN FOR TMT BARS
CONFIRMING TO IS 1786
Sr. Characteristics Activity Description ROLLING CLIENT Frequency of Testing
No. MILL
W = Witness R = Review
4.0 MANUFACTURING PROCESS FOR FBE COATINGS DIVISION
I. SCOPE OF PROCEDURE
The procedure is based on the assumption that the principal contractor named in this job shall
provide material for coating after their certification for the quality of the reinforcement steel
bar with respect to relevant project specifications and / or IS-1786:1985.
This procedure defines production method used by HARIOM EPOXY SHIELD for FBE
coating of rebars at BHILAI EPOXY COATING DIVISION. This procedure is a part of ECL
Quality Control Programme.
II.1 The coating material shall meet the requirement of specification as per Annexure-A of IS –
13620:1993.
II.2 The patching/repairing material shall be compatible with the coating while in use in coating
plant or in the field. The patching or repair shall be performed in accordance with ECL
recommendations.
All Steel to be used shall be high yield strength deformed bars conforming to IS – 1786:1985
unless otherwise specifically approved by inspection agency / Client. All reinforcement shall
be coated with fusion bonded epoxy powder. Coating of bars, testing, handling etc. shall be
done as per IS- 13620:1993/ASTM 775M. The bare bars received shall be checked for bar
dia., weight & surface defects.
III.1.1 Random checks shall be made on the rebar supplied for coating and in case of any problems
noticed shall be intimated to the principal contractor.
(Format attached as per BARE BAR INSPECTION REPORT)
The surface of the steel, reinforcing bars to be coated shall be cleaned by impact of steel
shots/Grits during shot blasting operation. The blasted surface should visually look to be near
white metal and may meet the requirement of SA 21/2 of Swedish Standard SIS-055900.
Any formation of rust blooms on the cleaned bars shall be removed by blast cleaning before
application of the coating. In no case shall the coating be delayed more than 8 hours after
cleaning as per IS-13620-1993.
III.3 APPLICATION OF COATING
The coating shall be applied by electro-statically charging the dry powder sprayed on to
the grounded steel bars using an electrostatic spray gun.
The coated bars shall be given a thermal treatment specified by the manufacturer of the
rebar epoxy powder in order to achieve fully cured finishing coating. Temperature shall be
controlled as recommended by the manufacture of the powder & ensure a workman like
job without blistering, holidays or other coating defects.
The thickness of coating shall be maintained between 100 microns to 300 microns after
curing. For acceptance of at least 90 percent of all coating thickness shall be within above
range. These coating thickness limits do not apply to the patching work or repair work.
The frequency of testing shall be one bar / 20 bars for each size. (Format attached as per
COATING THICKNESS RECORD)
IV.3 ADHESION
The adhesion of coating shall be evaluated on a representative number of bars, 1 for every
one ton up to 16 mm dia., 1 for every 2 tons above 16 mm dia. And up to 25 mm dia. And
1 for every 4 tons above 25 mm dia. From each production lot. No visible cracks and
disbanding in the coating on the outside radius shall be allowed when tested in accordance
with clause No. 8.3 of IS – 13620:1993. (Format attached as per TESTING OF
ADHESION COATING)
V. TEST METHODS
Test methods for thickness of coating, holiday detection, adhesion of coating etc. shall be in
accordance with not limited to Clause No. 8 to Clause No. 10 of IS – 13620:1993
VI. RETEST
If the specimen for coating thickness or for adhesion of coating fails to meet the specified
requirements, twice the number of samples originally selected shall be tested for each failure test.
If the results of these retests meet the specified requirements, the coated bar represented by the
sample shall be accepted.
VII. REMOVAL OF NON-CONFORMING PRODUCT
Coated bars represented by the samples that do not meet the requirements of this specification
shall be rejected. Such bar may be stripped of coating, re-cleaned, re-coated and resubmitted for
acceptance test in accordance with the requirements of the specification by mutual agreement
between the purchase and the manufacturer. Plant shall keep documents separately for such re-
coated material and data shall be made available for inspection to clients.
VIII. REPAIR PROCEDURE
Coating damage due to fabrication and handling need not be repaired in case where the damage
area is 40 mm sq or smaller. All damaged area larger than 40 mm sq shall be repaired with
patching material. Maximum amount of damage shall not exceed 2 percent of the surface area of
each bar. Patching shall be done in accordance with ECL recommendation. ECL shall provide
skilled manpower and supervision as and when required by the client or training for client’s
technicians.
IX. HANDLING AND IDENTIFICATION
The coated bars shall be carefully handled. The bundles of coated bars shall not be dragged or
dropped during handling. Wooden packing batons shall be used while conveying, stacking,
placing or stacking so as to avoid rubbing of coated bars against each other or hard surface, which
may damage the coating during handling. Bundles of coated bars shall be tied with PVC binding
material.
The coated shall be stacked leaving gap between ground and bars with wooden batons between
rows of bars or bundles of such tied bars. All bundles of coated bars shall be lifted with a strong
back, spreader bar, multiple supports or a platform bridge to prevent bat-to-bar abrasion from sags
in the bundles.
The identification of all reinforcing bars shall be maintained through coating process to the point
of shipment, by way of tagging which will be reflecting on the test certificate from the time
reinforcing bars are delivered to the plant until delivery point of the client. (Format attached as
per TEST CERTIFICATE & INSPECTION REPORT FOR FBEC BARS FOR CONCRETE
REINFORCEMENT)
5.0 QUALITY ASSURANCE PLAN FOR EPOXY COATING LINE TEST PLAN.
Sr. Activity Description ECL CLIENT Reference Frequency Acceptance
No. Specification of Testing Criteria
W = Witness R = Review