Date : June 07, 2024

To : Engr. Wilma Saguid


Quality Surveyor - MEC

Project Name : Grand View Tower


173 Buendia Sen. Gil Puyat Corner Leveriza St. Makati City

Subject Application of Epoxy Floor Coating for Grandview Tower Fire Exit and Common Areas

Umeas Unit Rate


Item Location Description Area Total Amount
Lot Labor Materials Total
1 Fire Exit 1, 2 and 3
2 Basement Sq.m 40.10 138.00 207.00 345.00 13,834.50
3 Ground Floor Sq.m 69.70 138.00 207.00 345.00 24,046.50
4 2nd Floor Sq.m 67.30 138.00 207.00 345.00 23,218.50
5 3rd Floor Sq.m 54.30 138.00 207.00 345.00 18,733.50
6 4rt Floor Minor grinding + application of SEALBOND Sq.m 58.40 138.00 207.00 345.00 20,148.00
Deep penetrating sealer using sprayer let
7 5th Floor Sq.m 59.70 138.00 207.00 345.00 20,596.50
cure and final coat of Sealbond Deep
8 6th Floor penetrating sealer. Sq.m 70.60 138.00 207.00 345.00 24,357.00
9 7th floor Sq.m 60.70 138.00 207.00 345.00 20,941.50
10 8th Floor Sq.m 51.70 138.00 207.00 345.00 17,836.50
11 9th Floor Sq.m 1,836.80 138.00 207.00 345.00 633,696.00
12 46th Floor Sq.m 53.40 138.00 207.00 345.00 18,423.00
13 Loft Level Sq.m 63.60 138.00 207.00 345.00 21,942.00
Pump Room Preparation Includes Minor Grinding and -
Chipping + Application of SEALBOND deep 15,065.00
14 Pump Room @ Ground Floor Sq.m 32.75 200.00 260.00 460.00
Penetrating Sealer + Patching + 1st
15 Pump Room @ fuel Tank Topcoat Sealbond EFC 80 + Finalcoat of Sq.m 5.64 200.00 260.00 460.00 2,594.40
16 Pump Room @ 6th Floor Sealbond EFC 80. Sq.m 22.60 200.00 260.00 460.00 10,396.00

Vat 12% 106,299.47


885,828.90
Grand Total: PHP 992,128.37

Terms and Condition


1. Project Duration
45 days upon mobilization
2. Warranty
Two (2)yrs for non-human made damages such as bubbling, crack and peel off
3. Payment
30% down payment, 60% progress billing and 10%retention
4. Retention
Release in 95 days upon issuance of letter of acceptance and turn over

Note:
1) Quotation is VAT-exclusive
2) Owner to provide water and electric supply

Prepared by: Conforme:

John Cubillan
JJJJG Const. Services
Operations Manager