Handover Forms

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

FORM NO.

: F-QM-GF-013
PROJECT

HANDOVER LOCATION

(Subcon to MDC) DATE: HANDOVER NO.:

This is to certify that (NAME OF SUBCON) is handing over the


area stated below to Makati Development Corporation (MDC).

AREA :

Subcon PIC Date

This is to certify that we have fully inspected/surveyed the above-mentioned area being handed over to us and is
now ready (except the items listed below) to receive our work.

MDC Project Superintendent Date

ADDITIONAL NOTES / REMARKS :

NOTED BY:

MDC Project In Charge Date

DISTRIBUTION c Subcontractor c Project Document Controller


Revision: May 2018
FORM NO.: F-QM-GF-012
PROJECT

HANDOVER LOCATION

(MDC to Subcon) DATE: HANDOVER NO.:

This is to certify that Makati Development Corporation (MDC) is handing over the area stated below to
(Name of Subcon) .

AREA :

Project Supervisor/ Project In-Charge Date

This is to certify that we have fully inspected/surveyed the above-mentioned area being handed over to us and is
now ready (except the items listed below) to receive our work.

Subcon Representative Date

ADDITIONAL NOTES / REMARKS :

NOTED BY:

MDC Project Manager Date

DISTRIBUTION c Subcontractor c Project Document Controller


Revision: May 2018

You might also like