NATIONAL HIGHWAYS AUTHORITY OF INDIA KCC BUILDCON PVT LTD. ECSTATIC ENGINEERING CONSULTANTS
(Ministry Of Road Transport & Highways
5th Floor, JMD Empire, Golf Course Extension PRIVATE LIMITED
Government Of India) S Lal Tower, 545, Dundahera Road, Shankar
G-5 & 6, Sector 10, Dwaraka, New Delhi. Road, Sector -62, Gurugram - 122102
Chowk Rd, Gurugram, Haryana 122016
`X'
·
·
·
·
·
·
·
·
GL.
A1 A2
B
AT SUPPORT
A A DETAILS OF PSC GIRDER
TO HAPUR TO BAREILLY
Bou
Span 30
nd
Proposal New Construction
ary W
all
ROW
ROW
PROW PROW
PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW
PROW
PROW
A1 A2
ell Bo
eW un
Tub HALF TOP PLAN
PLAN
HALF BOTTOM PLAN
da
ry
W
all
PROW
PROW
5+500
PROW PROW PROW
PROW PROW PROW
ROW
PROW
Ch. 5500.00
PROW PROW PROW
PROW PROW
Ch. 5300.00
Ch. 5400.00
5+300
5+400
ROW
ROW
HALF TOP PLAN B
R=-2000.000
R=∞
HALF BOTTOM PLAN
PLAN DESIGN DIRECTOR KEY PLAN
CLIENT:- EPC CONTRACTOR:- DESIGN CONSULTANT:- PROJECT:
APPROVED BY: U.S
Improvement & Up-gradation of NH-734 section of Moradabad
NATIONAL HIGHWAYS AUTHORITY OF INDIA KCC BUILDCON PVT LTD. ECSTATIC ENGINEERING CONSULTANTS & Kashipur bypasses on EPC basis in the state of Uttar
(Ministry Of Road Transport & Highways PRIVATE LIMITED CHECKED BY: N.S
5th Floor, JMD Empire, Golf Course Extension Pradesh & Uttarakhand: ''Package-I: Moradabad Bypass''
Government Of India) S Lal Tower, 545, Dundahera Road, Shankar
G-5 & 6, Sector 10, Dwaraka, New Delhi. Road, Sector -62, Gurugram - 122102 (Length= 33.724km), Start from Ch. 0+00 (Km. 144+381 of
Chowk Rd, Gurugram, Haryana 122016 DESIGNED BY: R.S NH-24) and ends at Ch. 33+724 (167+790 of NH -24)
TITLE:
AUTHORITY ENGINEER:- PROOF CONSULTANT:- SAFETY CONSULTANT:- DRAWN BY: A.P
GENERAL ARRANGEMENT DRAWING FOR FLYOVER
CHAITANYA PROJECT CONSULTANT {SPAN 1x30(SQ)x5.5} AT CH. 5+390 (SKEW 25°)
SCALE: AS SHOWING
PRIVATE LIMITED M/s AN INFRA PROJECT ROAD LINK CONSULTANCY SERVICES
19.08.2023 R0 AP ISSUED FOR APPROVAL IN ASSOCIATION WITH M/s SHREE SHEETS: 01 OF 02 DRG NO.: REV.
DATE REV BY DESCRIPTION OF REVISIONS BHAWANI CONSULTANCY PVT. LTD. AUG, 2023 MOR-BY/NH/SS/FLY/CH. 5+390/GAD-101 R0
DATE:
GL. GL.
SECTION B-B
A1
*
BORE HOLE -01 BORE HOLE -02
DETAILS - `X'
DESIGN DIRECTOR
SECTION B-B
TRAFFIC
B DIRECTION D
T T
SECTION D-D
E "1" E UNFAVOURABLE BOND CONDITION
A
C
L L L L
DETAILS -`3' DETAILS AT "2"
SCHEDULE OF REINFORCEMENT
"3"
* BAR MARK 1 & 1a ARE BUNDLED TOGETHER BAR BAR NO./ SHAPES REMARKS
MKD. DIA. SPACING
PILE & PILE CAP
MAXIMUM LOAD ON A PILE (IN t)
NORMAL SEISMIC
VERTICAL HORIZONTAL VERTICAL HORIZONTAL
SECTION E-E
DETAILS -`4'
LEVELS (IN m)
PILE CAP PILE CAP FOUNDING LENGTH
ABUT.
TOP LEVEL BOTTOM LEVEL LEVEL OF PILE
"4"
NO.
(m) F F
A1
B D T
A2
T
PILE CAP TOP PLAN PILE CAP TOP PLAN "2"
LEGEND:-
REINF. DETAILS OF PILE
SECTION F-F DESIGN DIRECTOR
·
·
·
·
`X'
GL.
GL. GL.
SECTION A-A
A1 LEVELS (IN m)
TRAFFIC DIRECTION
B ABUTMENT CAP
ABUT.
FRL BOTTOM LEVEL.
NO.
(m)
A1
A2
SECTION B-B
A1
A A
DETAILS - `X'
B
PLAN OF ABUTMENT CAP
DESIGN DIRECTOR
CLIENT:- EPC CONTRACTOR:- DESIGN CONSULTANT:- PROJECT:
APPROVED BY: U.S
Improvement & Up-gradation of NH-734 section of Moradabad
NATIONAL HIGHWAYS AUTHORITY OF INDIA KCC BUILDCON PVT LTD. ECSTATIC ENGINEERING CONSULTANTS & Kashipur bypasses on EPC basis in the state of Uttar
(Ministry Of Road Transport & Highways PRIVATE LIMITED CHECKED BY: N.S
5th Floor, JMD Empire, Golf Course Extension Pradesh & Uttarakhand: ''Package-I: Moradabad Bypass''
Government Of India) S Lal Tower, 545, Dundahera Road, Shankar
G-5 & 6, Sector 10, Dwaraka, New Delhi. Road, Sector -62, Gurugram - 122102 (Length= 33.724km), Start from Ch. 0+00 (Km. 144+381 of
Chowk Rd, Gurugram, Haryana 122016 DESIGNED BY: R.S NH-24) and ends at Ch. 33+724 (167+790 of NH -24)
TITLE:
AUTHORITY ENGINEER:- PROOF CONSULTANT:- SAFETY CONSULTANT:- DRAWN BY: A.S DIMENSIONAL DETAILS OF ABUTMENT (A1 & A2)
CHAITANYA PROJECT CONSULTANT FOR FLYOVER AT CH. 2+485
SCALE: AS SHOWING
PRIVATE LIMITED M/s AN INFRA PROJECT ROAD LINK CONSULTANCY SERVICES
19.08.2023 R0 AS ISSUED FOR APPROVAL IN ASSOCIATION WITH M/s SHREE SHEETS: 01 OF 01 DRG NO.: REV.
DATE REV BY DESCRIPTION OF REVISIONS BHAWANI CONSULTANCY PVT. LTD. AUG. 2023 MOR-BY/NH/SS/FLY/CH. 2+485/SUB-202 R0
DATE:
NOTES:-
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
REINFORCEMENT DETAIL:-
C C C C C C BAR BAR NO./ SPACING SHAPE REMARKS
MKD. DIA.
A B
N
IO
CT E R
DI
IC
A B
FF
RA T
PLAN
LEGEND:-
DESIGN DIRECTOR
SECTION AT D-D
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
T-T AXIS
L-L AXIS D
SECTION A-A
SECTION C-C
DESIGN DIRECTOR
SECTION B-B
C B
A A
AT SUPPORT AT MID
DETAILS OF PSC GIRDER
C PLAN B
`X'
DESIGN DIRECTOR
DETAIL-X
SECTION C-C
SECTION B-B
q°
q°
X
ELEVATION SHOWING CABLE PROFILE
B A
(-) Z
B PLAN SHOWING CABLE PROFILE A
X
(+) Z
TABLE - I (CABLE COORDINATES):-
CABLE
No.
TABLE II:-
CABLE THEORETICAL ELONGATION EMERGENCE ANGLE OF NO. OF JACKING FORCE SEQUENCE OF EMERGENCY LENGTH OF
NO. AT EACH END (mm) CABLE ( STRANDS (Tonne) STRESSING STRANDS CABLE (m)
B B
A
A
VIEW X-X
TYPICAL DETAILS OF 16 T
Q 10 TURNS
SPIRAL REINFORCEMENT
REINFORCEMENT DETAILS:-
VIEW D-D BAR BAR
DIA. NO./SPACING SHAPE REMARKS
MKD.
NOTES:-
E
E SECTION E-E
SECTION A-A SECTION B-B SECTION C-C TYPICAL DETAIL OF LIFTING OF
GIRDER AT EACH END OF THE GIRDER
A REINFORCEMENT DETAILS:-
BAR BAR
NO./SPACING SHAPE REMARKS
MKD. DIA.
SECTION A-A
REINFORCEMENT DETAILS:-
BAR BAR
NO./SPACING SHAPE REMARKS
MKD. DIA.
A A
B PLAN
DESIGN DIRECTOR