100% found this document useful (1 vote)
30 views4 pages

Unit Start-Up Checks

Uploaded by

godwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
30 views4 pages

Unit Start-Up Checks

Uploaded by

godwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

START-UP CHECK FOR GTG'S

STATUS DURING
S/N UNIT START-UP CHECKS (GTG: ---------------------) TIME INSPECTION (OK REMARK
OR NOT)

GAS RECEIVING STATION


1
Ensure that the GMS isolation Valves is opened
2

Ensure that the incoming gas pressure is within the operating limit ( 30 - 35 Bar)
3
Check and drain condensate on gas line before the ESD valve
3
Ensure that the gas line is equalized (up-stream and down-stream pressure are the
same) before ESD valve is opened
4
Ensure that the GRS Instrument Air line valve are lined-up properly
5
Ensure that inlet and dicharge valve of filter separator are opened depending on the
one to be in-service
6
Check and drain condensate in the filter separator that is in service
7
Ensure that all the vent valves on in GRS are properly closed
8
Ensure that gas chromotograph isolation valve are opened
9
Ensure that one of the PRCS is line-up
10
Ensure that the gas pressure after PRCS is within the operating limit (24.5 - 26bar)
11
Ensure that the inlet and discharge valve of water bath heater one or two are lined-
up
12
Ensure that water bath heater expansion tank are filled upto 90% full
13
Ensure that the water temperature is within the operating limit (75-85 OC)
14
Ensure that the gas temperature leaving the water bath heater is 55 OC or abaove
15
Ensure that all the vent valves on coalescing filter are closed
16
Ensure that condensate is drained from coalescing filter that needs to be in service

PLANT AIR COMPRESSOR


17
Check and line-up the plant Air Compressor system
18
Ensure that all the drain valves are properly closed
19
Ensure that all Filters are drained
20
Enure that one of the Air Dryer is on service
21
Ensure that the two Air Recievers are drained
22
Ensure that there is proper ventilation in the Compressor Room
MV ROOM
23
Ensure that UAT and SAT are energized on the GTG's 6.6 KV BUS-BAR
24
Ensure that all the Bus -Tie in MV Room are closed
25
Ensure that the respective incomer breakers are energized.
26
Ensure that all Relays and Alarms are Reset in both MV and LV breaker
26
Ensure that all the supply breakers to BOP equipment are energized
27
Ensure that the plant batter charger and inverter are energized
28
Ensure that there is proper illumination in MV ROOM
29
Check and confirm Plant Batteries Electrolyte Level
30
Ensure that Battery Room Ventilation Fans are ON
STATUS DURING
TIME INSPECTION (OK REMARK
OR NOT)
GAS TURBINE GENERATOR SECTION
31

Ensure that the Unit is not under Permit to Work


32

Ensure that the Unit CO2 system is healthy


33

Check the Unit Compartment and Remove every combustible material


34

Check the Wnit for water and Oil leakage


35

Ensure that the Unit DC Voltage is within the operating range (125 dc)
36

Line -up all the Motor Bucket in the Unit Peec for Start-up on Auto
37

Confirm that the Unit is on Turning Gear


38

Check and Reset GCP/Transformer Alarm Panel


39

Check and Reset Hazardous Gas Alarm Panel


40

Confirm that Mark VI is Healthy and No Alarm Active


41

Ensure that the unit APU is available


42

Ensure that Generator Breaker (FKG) is on Open position


43

Ensure that the Generator Breaker (SF6) is within the operating range.
44

Enure that all the Acoustical Enclosure doors are closed


45
Check and line-up unit cooling water system, ensure that inlet and dicharge valve of
the two pump are opened and confirm water level in the Expansion Tank
46
Check the level and temperature of lube oil in the reservior or sump to ensure it
within the operating range.
47
Check the lube oil filter differential pressure and ensure it's within the Operating
limit
48

Ensure that the oil mist eliminator valve is lined-up properly


49
Check the hydraulic filter for differential pressure and ensure is it's within operating
range
50

Confirm the status of 52AR and 52AS Breakers


51

Ensure that Unit Power Supply is on 52AR


52
Ensure that the selector switch of 415v supply breaker at the PEEC is on Normal
Position

Shift Lead: ----------------------------------- Field Operator: -----------------------------------