S/N UNIT START-UP CHECKS (GTG: ---------------------) TIME INSPECTION (OK REMARK
OR NOT)
Ensure that the incoming gas pressure is within the operating limit ( 30 - 35 Bar)
3
Check and drain condensate on gas line before the ESD valve
3
Ensure that the gas line is equalized (up-stream and down-stream pressure are the
same) before ESD valve is opened
4
Ensure that the GRS Instrument Air line valve are lined-up properly
5
Ensure that inlet and dicharge valve of filter separator are opened depending on the
one to be in-service
6
Check and drain condensate in the filter separator that is in service
7
Ensure that all the vent valves on in GRS are properly closed
8
Ensure that gas chromotograph isolation valve are opened
9
Ensure that one of the PRCS is line-up
10
Ensure that the gas pressure after PRCS is within the operating limit (24.5 - 26bar)
11
Ensure that the inlet and discharge valve of water bath heater one or two are lined-
up
12
Ensure that water bath heater expansion tank are filled upto 90% full
13
Ensure that the water temperature is within the operating limit (75-85 OC)
14
Ensure that the gas temperature leaving the water bath heater is 55 OC or abaove
15
Ensure that all the vent valves on coalescing filter are closed
16
Ensure that condensate is drained from coalescing filter that needs to be in service
Ensure that the Unit DC Voltage is within the operating range (125 dc)
36
Line -up all the Motor Bucket in the Unit Peec for Start-up on Auto
37
Ensure that the Generator Breaker (SF6) is within the operating range.
44