DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)

Equipment:- RMG 6482 (1200 L )


Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 1250 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1700 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 340 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 170 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 1764.70588 Sec
29.4117647 Min
0.49019608 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 2040 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 14.7293776 litrs/sec
53025.7593 litrs/hr
53.0257593 m3/hr

From pump Cataloque,Capacity


KVT-3.14 129 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6478 (400 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 3.6 m 1 kgf/cm2
Level to be generated 0.36 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 700 Litrs


Cyclone seperator 120 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 70 Litrs

Therefore,Total Volume 890 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 40 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 600 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 10 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 760 Sec
12.66667 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 178 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 89 Kgs

Material to beTransfered 50 Kgs ASSUMED VALVUE


Total time required 426.9663 Sec
7.116105 Min
0.118602 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 421.5789 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.6931472
So, Q= 15.422525 litrs/sec
55521.089 litrs/hr
55.52109 m3/hr

From pump Cataloque,Capacity


KVT-3.8 m3/hr
VACCUM PUMP CALCULATION

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 3.6 m 1 kgf/cm2
Level to be generated 0.36 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 700 Litrs


Cyclone seperator 120 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 70 Litrs

Therefore,Total Volume 890 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 40 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 600 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 10 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 760 Sec
12.66667 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 178 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 89 Kgs

Material to beTransfered 50 Kgs ASSUMED VALVUE


Total time required 426.9663 Sec
7.116105 Min
0.118602 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 421.5789 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.6931472
So, Q= 15.422525 litrs/sec
55521.089 litrs/hr
55.52109 m3/hr

From pump Cataloque,Capacity


KVT-3.8 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6403 (1200 L )
Client:- QCIL

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 1250 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1700 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 10 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 280 Sec
4.66666667 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 340 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 170 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 1647.05882 Sec
27.4509804 Min
0.45751634 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 2185.71429 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 14.7293776 litrs/sec
53025.7593 litrs/hr
53.0257593 m3/hr

From pump Cataloque,Capacity


KVT-3.140 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6480 (1200 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 1250 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1700 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 340 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 170 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 1764.70588 Sec
29.4117647 Min
0.49019608 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 2040 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 14.7293776 litrs/sec
53025.7593 litrs/hr
53.0257593 m3/hr

From pump Cataloque,Capacity


KVT-3.140 129 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6481 (1200 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 1250 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1700 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 340 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 170 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 1764.70588 Sec
29.4117647 Min
0.49019608 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 2040 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 14.7293776 litrs/sec
53025.7593 litrs/hr
53.0257593 m3/hr

From pump Cataloque,Capacity


KVT-3.140 129 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6482 (1200 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 1250 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1700 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 340 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 170 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 1764.70588 Sec
29.4117647 Min
0.49019608 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 2040 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 14.7293776 litrs/sec
53025.7593 litrs/hr
53.0257593 m3/hr

From pump Cataloque,Capacity


KVT-3.140 129 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6479 (800 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 850 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 1300 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 260 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 130 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 2307.69231 Sec
38.4615385 Min
0.64102564 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 1560 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 11.2636417 litrs/sec
40549.1101 litrs/hr
40.5491101 m3/hr

From pump Cataloque,Capacity


KVT-3.140 129 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6478 (400 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 450 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 900 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 180 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 90 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 3333.33333 Sec
55.5555556 Min
0.92592593 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 1080 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 7.79790578 litrs/sec
28072.4608 litrs/hr
28.0724608 m3/hr

From pump Cataloque,Capacity


KVT-3.100 98 m3/hr
DATA SHEET FOR VACCUM PUMP SELECTION BASES ON DISCHARGE(Q)
Equipment:- RMG 6478 (250 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 300 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 750 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 150 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 75 Kgs

Material to beTransfered 1000 Kgs ASSUMED VALVUE


Total time required 4000 Sec
66.6666667 Min
1.11111111 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 900 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 6.49825482 litrs/sec
23393.7173 litrs/hr
23.3937173 m3/hr

From pump Cataloque,Capacity


KVT-3.100 98 m3/hr
PUMP , VACUUM - MODEL : DRY PUMP KVT 3.140 , FLOW RATE : 132(m3/hr) , POWER : 4/5.5 (KW/HP) , VOLTAGE

PUMP , VACUUM - MODEL : DRY PUMP KVT3.100 , FLOW RATE : 117(m3/hr) , POWER : 3.7/5 (KW/HP) , VOLTAGE :

PUMP , VACUUM - MODEL : DRY PUMP KVT 3.100 , FLOW RATE : 100(m3/hr) , POWER : 4/5.5 (KW/HP) , VOLTAGE

LID ASSEMBLY , BIN - ID : 350(MM) , MOC : SS 316 , REF. DRG. NO. : AMS25011 , REV.NO. : 02 , REMARK : ALL OTHE
R : 4/5.5 (KW/HP) , VOLTAGE : 415 (V) , FREQUENCY : 50 (HZ) , FLP/NFLP : NFLP , CERTIFICATION : STANDARD , MAKE : BECKER , OTHER S

R : 3.7/5 (KW/HP) , VOLTAGE : 415 (V) , FREQUENCY : 50 (HZ) , FLP/NFLP : NFLP , CERTIFICATION : STANDARD , MAKE : INDO VACUUM , O

R : 4/5.5 (KW/HP) , VOLTAGE : 415 (V) , FREQUENCY : 50 (HZ) , FLP/NFLP : NFLP , CERTIFICATION : STANDARD , MAKE : BECKER , OTHER S

NO. : 02 , REMARK : ALL OTHER DIMENSIONS AS PER DWG.


RD , MAKE : BECKER , OTHER SPECIFICATION : SINGLE STAGE DRY ROTARY VANE VACUUM PUMP, WITH INLINE FILTER AND NRV

RD , MAKE : INDO VACUUM , OTHER SPECIFICATION : SINGLE STAGE OIL LUBRICATED ROTARY VANE VACUUM PUMP, WITH INLINE FILTER

RD , MAKE : BECKER , OTHER SPECIFICATION : SINGLE STAGE DRY ROTARY VANE VACUUM PUMP, WITH INLINE FILTER AND NRV
NE FILTER AND NRV

M PUMP, WITH INLINE FILTER

NE FILTER AND NRV


Equipment:- RMG 6478 (250 L )
Client:- LUPIN

SR NO DATA INPUT VALUE UNIT Atm. Pressure=10.3 m of Water Column


760 mm of Hg.

Total Height of Blender From Ground


1 Level(Level to be Evacuated) 4.5 m 1 kgf/cm2
Level to be generated 0.45 Bar
So, Considering Higher Value 0.5 Bar ABSOLUTE PARTIAL VACCUM TO BE GENERATED
Absolute Pressure 0.5 Bar

2 Total Volume inside RMG 300 Litrs


Cyclone seperator 300 Litrs
48" sifter volume 0 Litrs
Volume of bin 0 Litrs
Total piping 150 Litrs

Therefore,Total Volume 750 Litrs

3 Cycle Time Consideration


3.1 To Build up Vacuum in RMG 80 Sec
3.2 To valve open of feed Material 10 Sec
3.3 To evacuate 30" sifter 0 Sec
3.4 To open valve of sifter 0 Sec
3.5 To feed Material 80 Sec
valve closing of feed mtrl & suction
3.6 hopper 10 Sec
3.7 For purging 30 Sec
valve opening of feed mtrl & suction
3.8 hopper 10 Sec
3.9 Manual delays 30 Sec
3.10 For discharge 50 Sec
Therefore,Total Cycle Time 300 Sec
5 min
4 Material Feed Rate
Volume of Material Sucked per Cycle
assuming 40% eff . 150 Litrs
Bulk Density Assume 0.5 g/cm3

Material feed per Cycle 75 Kgs

Material to beTransfered 250 Kgs ASSUMED VALVUE


Total time required 1000 Sec
16.6666667 Min
0.27777778 hour
MATERIAL TRANSFER RATE REQUIRED AS PER SO
Material to beTransfered in 1 hour 900 kg/hr 2000 KG/HR
5 Pump Discharge(Q)m3/Hr
Vaccum Build Up(120 Sec)=Total
Volume/Q*((ln(Patm/Pabs))

Patm 1 Bar
Pabs 0.5 Bar
ln( Patm/Pabs) 0.69314718
So, Q= 6.49825482 litrs/sec
23393.7173 litrs/hr
23.3937173 m3/hr

From pump Cataloque,Capacity


KVT-3.100 98 m3/hr