Assignment - OM
2 hours
2. If workpieces are completed in a workstation in a batch of 100 and setup time is 2 minutes and run time is 0.2 minute per u
Max possible production rate = 480/42 = 11.42 , i.e. 11 units per day
11
c The situation is worse in this set-up . We are achieving only 27.5% efficiency compared to the maximum possible pr
d Firstly , it is rather impossible to achieve maximum production rate. Addition of equipments or overtime working ho
g When two min saved on both W1 and W3 , then total time taken in producing one unit = 38 min
Thus , new production rate = 480 / 38 = 12.6 , i.e. we can reach upto 13 units maximum .
h If the milling is done beforehand than other processes , it can optimise the time taken by other workstations to deli
= 63000 min
= 1050 hours
ments or overtime working hours or reducing/ optimising the time spent on various workstations is also required when dealing with such s
by other workstations to deliver their output . This can be a good optimising solution for increasing output rate at other workstations .
ctory works 8 hours per day. a. What is the maximum possible
ave 2 minutes in workstation 1, is there an impact in production
f the sequence is milling→grinding →drilling, will there be any
ze is made variable in non-bottleneck split into 500, 500, 500 and
4 h 1.2 0.1
Idle time 0.1
Efficiency 88.46%
ycle time is to be the minimum
following tasks. Break the tie if
Rough
c
1.3
1.1
0.7
0.4
1a b c
2d
3f g
4h
e
1.3
1.1
0.7
0.1
e 0.3
0.2
0.1
0.6
Determine the placement of departments for a newly designed facility that will minimize total transportation costs using the d