CBR Ba-9 - 2
CBR Ba-9 - 2
CBR Ba-9 - 2
PROJECT
Design and Construction of Civil Works (Earthwork, Bridges, Station Buildings, Retaining Walls and other miscellaneous Works) from km 29.68
to km 49.70 & from km 55.60 to km 61.50 and its connectivity's to IR network from New Patli to Patli station & New Patli to Sultanpur station
including modifications/civil works at Sultanpur Station in connection with laying of New BG Double Railway line of HORC project.
Mould no. 4 5 6
720
640
560
480
400 CTP1/PAA/QA/SOIL/BA-450
Load in kg
320
BA No-67,Pit NO-1 13.12.2014
240
17.12.2014
160
80 1.89 11
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm
720.00
640.00
560.00
480.00
Load in kg
400.00
320.00
240.00
160.00
80.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm
400.00
360.00
320.00
280.00
240.00
200.00
160.00
120.00
80.00
40.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm