Takeoff
Takeoff
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
4.0 Concrete Pouring ( one-bagger ) 3000 Psi (100mm tck) cu.m. - 711.97 - -
Page 1 of 16 06/28/2024
PROJECT: Floor Area
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
c Misc lot - -
3.0 Concrete Pouring ( one-bagger ) 3000 Psi cu.m. - 711.97 - -
a Portland Cement (40 kg) bags 250.00 - - -
b Sand cu.m. 950.00 - - -
c Gravel, 3/4" cu.m. 1,000.00 - - -
4.0 Column Finishing sq.m. 200.00 - 80.00 - -
Sub-total #NAME? #NAME? #NAME?
Beams
1.0 Reinforcement kgs. 50.00 - 73.26 - -
16mm dia x 6m pcs
a GI Tie Wire #16 kgs. 89.60 - - -
2.0 Formworks sq.m. 250.00 - 182.09 - -
3.0 Concrete Pouring ( one-bagger ) 3000 Psi cu.m. - - - -
a Portland Cement (40 kg) bags 250.00 - - -
b Sand cu.m. 950.00 - - -
c Gravel, 3/4" cu.m. 1,000.00 - - -
4.0 Beam Finishing sq.m. 200.00 - 80.00 - -
Sub-total - - -
Suspended Slab
Page 2 of 16 06/28/2024
PROJECT: Floor Area
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
DIVISION 5 - METALS
Roofing
a Rib type Long Span sq.m 1,500.00 - included -
b Roof Insulation sq.m 500.00 - -
Page 3 of 16 06/28/2024
PROJECT: Floor Area
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
32'' x 8' pc 60.00
pc
Accessories lot 1.00
2.0 Fascia Installation l.m 53.33 - -
a Fascia board, 12mm thick x 10" x 8' pc 22.00 324.80 7,145.60 7,145.60
b Fascia board, 12mm thick x 12" x 8' pc 364.00 - -
3.0 Thermal Insulation sq.m 84.00
3.0 Waterproofing sq.m - 300.00 - included included -
Sub-total 7,145.60 - 7,145.60
TOTAL - DIVISION 6 7,145.60 - 7,145.60
DIVISION 7 - DOORS & WINDOWS
Doors
1.0 D1 Main Entrance ( 1.2x2.1) pc 8,763.17 - 1,752.63 - -
D2
D3
Windows pc
W1 1.2x1.2 powder coated (BR 1 and 2)
W2
W3
Sub-total - - -
Ironmongeries
1.0 Cylindrical lockset (surelockset) pc 440.59 - - -
2.0 Hinges; to doors pc 250.31 - - -
Sub-total - - -
TOTAL - DIVISION 7 - - -
DIVISION 8 - FINISHES
Ceiling on metal furring
1.0 Ceiling Frame - interior sq.m. - 467.43 - 93.86 - -
2.0 Ceiling Board Installation sq.m. - 122.02 - -
a 12mm thick Gypsum board pc - 506.00 - - -
b Consumables lot - - - -
Drywall Partitons
1.0 6mm thk Drywall Partition on 75mm thk studs sq.m. 26.82 1,103.87 29,605.85 564.48 15,139.35 44,745.20
2.0 Drywall Partition Installation sq.m. 26.82 - -
a 12mm thick Gypsum board pc 10.00 506.00 5,060.00 - 5,060.00
b Consumables lot 759.00 - - -
Sub-total 34,665.85 15,139.35 49,805.20
Wall Finishes
1.0 Glazed Tiles at t&b sq.m. - 185.00 - -
a Homogeneous - 300mmx300mmx3mm thk pc - 250.00 - - -
b ABC Tile Grout (5kg/bag) bag - 147.84 - - -
c Cement Adhesive (25 kg) bag - 348.81 - - -
Floor Finishes
1.0 Homogeneous Tiles (600x600) sq.m. - 185.00 - -
a Homogeneous Tiles (600x600) pc - 250.00 - - -
b ABC Tile Grout (5kg/bag) bag - 147.84 - - -
c Cement Adhesive (25 kg) bag - 348.81 - - -
2.0 Unglazed Tiles at t&b sq.m. - - 185.00 - -
a Homogeneous - 300mmx300mmx3mm thk pc - 250.00 - - -
b ABC Tile Grout (5kg/bag) bag - 348.81 - - -
c Cement Adhesive (25 kg) bag - 1,200.00 - -
3.0 Non Skid Tiles sq.m. - - 185.00 - -
a Homogeneous Tiles (600x600) pc - 250.00 - - -
b ABC Tile Grout (5kg/bag) bag - 147.84 - - -
c Cement Adhesive (25 kg) bag - 348.81 - - -
Sub-total - - -
Exterior wall
Sub-total - - -
Page 4 of 16 06/28/2024
PROJECT: Floor Area
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
Painting Works
1.0 Interior Wall sq.m. 100.00 110.00 11,000.00 11,000.00
a Flat Latex (4 lit) can 4.00 600.00 2,400.00 - 2,400.00
b Semi-gloss Latex can 7.00 700.00 4,900.00 - 4,900.00
c Consumables lot 1.00 1,460.00 1,460.00 - 1,460.00
2.0 Exterior Wall sq.m. 100.00 110.00 11,000.00 11,000.00
a Flat Latex can 4.00 600.00 2,400.00 - 2,400.00
b Textured Latex can 7.00 700.00 4,900.00 - 4,900.00
c Consumables lot 1.00 1,460.00 1,460.00 - 1,460.00
3.0 Column sq.m. 110.00 - -
a Flat Latex gal 800.00 - - -
b Consumables lot 700.00 - - -
4.0 Ceiling - Interior sq.m. 110.00 - -
a Flat Latex gal 600.00 - - -
b Consumables lot - - - -
4.0 Ceiling - exterior sq.m. 110.00 - -
a Flat Latex gal 600.00 - - -
b Consumables lot - - - -
5.0 At Balcony Railings lm 650.00 - 110.00 - -
9.0 Pantry Counter Concrete sq.m. 76.77 - -
a Flat Latex gal 481.60 - -
b Semi-gloss Latex gal 554.40 - -
c Consumables lot - - -
Sub-total 17,520.00 22,000.00 39,520.00
TOTAL - DIVISION 8 89,325.20
DIVISION 9 - SPECIALTIES
Mirrors
6mm Mirror with plywood backing and aluminum frame
1.0
in anodized finish
a. 3150mm wide x 900mm high m2
b. 2100mm wide x 900mm high m2
c 2850mm wide x 900mm high m2
Ledge
3.0 Pre-cast Ledge m2
Modular Counter / Cabinetry
4.0 Installation of Kitchen Cabinets m
5.0 Kitchen Counter sq.m.
a 2.4mm china granite countertop and splashboard sq.m.
Metal Louvers
8.0 Tubular metal Louvers sq.m.
Shower Enclosure
8.0 Glass Shower Enclosure lot
Sub-total - - -
TOTAL - DIVISION 9 - - -
DIVISION 9 - SPECIALTIES
Closets
Window Grills
8.0 1.0 0.4x0.4 sq.m. 3,500.00 - included -
2.0 1.2x1.2 sq.m. 3,500.00 - included -
7.0 0.60x1.20 sq.m. 3,500.00 - included -
Sub-total - - -
TOTAL - DIVISION 9 - - -
DIVISION 10 - SANITARY
lot
Sub-total - -
TOTAL - DIVISION 10 - -
DIVISION 10 - SANITARY
lot 50,000.00 - -
PIPES
20mm (1/2") x 4.0 meters pc. / s 295.00 - 88.50 -
- -
FITTINGS - PPR - -
ELBOW - -
Plain Elbow - -
20mm pc. / s 24.00 - 7.20 -
ADAPTOR - -
Male Threaded Adaptor - -
Page 5 of 16 06/28/2024
PROJECT: Floor Area
OWNER:
LOCATION:
BILL OF QUANTITIES
MATERIALS LABOR
ITEM ITEM DESCRIPTION UNIT QTY. TOTAL
U/COST COST U/COST COST
20mm pc. / s 185.00 - 55.50 -
Female Threaded Adaptor - -
20mm pc. / s 185.00 - 55.50 -
- -
TEE - -
Plain Tee - -
20mm pc. / s 25.00 - 7.50 -
Threaded Tee - -
20mm pc. / s 30.00 - 9.00 -
- -
COUPLING - -
Coupling - -
20mm pc. / s 15.00 - 4.50 -
- -
CAP - -
End Cap - -
20mm pc. / s 15.00 - 4.50 -
- -
OTHERS - -
Hose Bibb pc. / s 284.50 - 85.35 -
Gate Valve pc. / s 255.00 - 76.50 -
Check Valve pc. / s 272.50 - 81.75 -
Shower Valve pc. / s 282.60 - 84.78 -
Shower Head pc. / s 725.00 - 217.50 -
Ordinary Faucet pc. / s 300.00 - 90.00 -
Consumbales (Teflon, Solvent etc.) lot 2,621.60 - -
- -
- -
- -
- -
C. STORM DRAINAGE - -
- -
PIPES - -
Sub-total - - -
TOTAL - DIVISION 10 - - -
DIVISION 11 - ELECTRICAL
Sub-total - - -
TOTAL - DIVISION 11 - - -
Page 6 of 16 06/28/2024
DIMENSION
8 78.91680746
8 78.91680746 157.8336
8 123.7415541
16 126.2668919 250.0084
6 20.83403717
6 20.83403717 41.66807
449.5101
VERTI
Dim. Of Column
No of
Heigth of
Remark Typical Cover Anchorage/Splicing
Column L W
Column
VERTICAL BARS
Rebar (Long)
Unsupported
Standard
No of Main Bars Ø Weight Total Kgs Beam Depth Height per
Cutting Length Hook
level
Column Ties
No of Ties Ties @ CL
Cut length Distance
of ties Confined Space A Confined Space B
Joint (lj) Covered height Spacing Pcs
(lo) (lo)
(lo)
No of Ties Total No
Confined Confined No of of Ties
Ø Weight Total Kgs
Space A Ties (lv) Space B Joint (lj) ties/layer per
(lo) (lo) column