GENERAL NOTES:

A. ALL EQUIPMENT & INSTRUMENT ARE PREFIXED BY THE APPLICABLE ZONE CODE
ITEM No. V-4645 ITEM No. V-4644 B. VALVE TYPE ACCORDING TO APPLICABLE PIPING SPECIFICATION.
C. HIGH POINT VENT, TEST VENT AND LOW POINT DRAIN NOT NORMALLY OPERATED ARE NOT SHOWN ON P&ID.
SERVICE REGENERATION ALKALI VESSEL (1x100%) SERVICE REGENERATION ACID VESSEL (1x100%) D. DELETED.
SIZE ID x T/T (mm) SIZE ID x T/T (mm) E. FOR ON-OFF VALVE TYPICALS CHECK PEFS T-14.487.520
NOTE-4 046-SP-7621 1000 x 2000 400 x 1800 F. FOR TYPICAL PIPING ASSEMBLY, REFER TO T-14.487.519
CAPACITY (m3) 1.57 (GEOMETRIC) CAPACITY (m3) 0.23 (GEOMETRIC) G. FOR MOTOR TYPICAL, REFER TO T-14.487.521
H. FOR THE DETAILED DESCRIPTION OF 46KS-610, REFER TO T-14.487.520 AND T-14.487.522.
N5 - 2"
DESIGN PRESSURE (barg) FULL OF LIQUID DESIGN PRESSURE (barg) +0.035 / -0.0135 I. DELETED.
DESIGN TEMPERATURE (°C) 20 / 65 DESIGN TEMPERATURE (°C) 20 / 65
1-1/2"-W46637-11008-LNG-L-2N N8 - 1"
46VB7093 NOTE-6 MATERIAL GRVE Bisphenol A MATERIAL GRVE BISPHENOL A - INTERNAL LINING PVDF

FV
N1 - 1-1/2" INSULATION NA INSULATION NA

65
C-3
1"

35
10
NC NOTE-8 3"-W461054-11008-LNG-L-2N / 3"-W461056-18160-LNG-L-2N / NOTES:
20 N4 - 2" TRIM LINE NUMBER TRIM LINE NUMBER

AM 20
3"-W461055-11008-LNG-L-2N 3"-W461057-18160-LNG-L-2N

B
N6 - 3" C-2 HH
AA 046 1. FOR ON-OFF VALVE TYPICALS CHECK PEFS T-14.487.520.
2. TRANSPARENT BAND ON GRP TANK WALL TO BE PROVIDED.

L-61
LISA

OVERFLOW
V09 3. BALL VALVE TO BE USED FOR MANUAL CONTROL OF FLOW.
046KBS-658 NOTE-1
L20
612
LL ITEM No. J-4642 ITEM No. J-4641 4. VENT SPOOL PROVIDED BY TANK MFR.
1-1/2" V09 5. DEDICATED CURBED AREA FOR ACID VESSEL (V-4644) AND ALKALI VESSEL (V-4645) WILL BE SHOWN ON CONTRACTOR'S PEFS T-14.186.580.
NOTE-1 C-1 FC SERVICE CAUSTIC SODA EJECTOR (1x100%) SERVICE HYDROCHLORIC ACID EJECTOR (1x100%) 6. THIS NOZZLE CONNECTION IS A FLUSHING REQUIREMENT FOR THE NAOH SYSTEM BEFORE OPENING IT FOR MAINTENANCE.
046KBS-659 N7 - 3" C-2
046 H 7. THIS NOZZLE CONNECTION IS A FLUSHING REQUIREMENT FOR THE HCL SYSTEM BEFORE OPENING IT FOR MAINTENANCE.

L-61
C-1 LISA MATERIAL SS316 MATERIAL CS PTFE LINED 8. 046LISA612-HH AND 046LISA614-HH GIVE ALARM ONLY, NO ACTION.
613 L 9. PROVIDED 5D STRAIGHT RUN UPSTREAM OF FLOW GAUGE.
1-1/2" L20
FO INTERCONNECTING
NOTE-2 ITEM No. V-4646
046 F14 N2 - 1" SKID VAPOUR TRAP FOR REGENERATION VESSEL

20

65
1"-W461024-11008-LNG-L-2N 35 SERVICE GENERAL HOLD:
RO V-4645 (1x100%)
621 20 10
SIZE ID x T/T (mm)

FV
C-2 400 x 500 a. DELETED

AM
1-1/2"-W461033-11008-LNG-L-2N V09 b. DELETED
46VB7049 1"

B
046KBS-660 CAPACITY (m3) 0.06 (GEOMETRIC)
NO
46 -IP
1-1/2" SK-4644 DESIGN PRESSURE (barg) FULL OF LIQUID
NOTE-1 C-1 FC 46VB7050
104 N3 -1-1/2" AA DESIGN TEMPERATURE (°C) 20 / 65 HOLD:
46VB7048 1-1/2" C-2
FROM UNIT 4300 1" MATERIAL GRVE BISPHENOL A - INTERNAL LINING PVDF
NC
20

65

CAUSTIC SODA 1. DELETED.

VENDOR
V09

CONTRACTOR
35 046KBS-651
T-14.186.580 INSULATION NA 2. DELETED.
14.7 C-2
AM 1"
FV

TRIM LINE NUMBER NA


20

B 46VB7047 3/4" NOTE-1 C-1 FC


UNI-D-12 NC
46VG7007
1-1/2"-W46622-11008-LNG-L-2N

46 -IP
VENDOR
CONTRACTOR

1"
AA C-2 110
11008LNG 13411 TO DRAIN
2"-W461025-11008LNG-L-2N 2"-W46631-13411-L-2N NEUTRALIZATION PIT
T-14.186.580
...

046LISA-612 SEQUENCE FAULT

11008-LNG
T-14.487.522
046LISA-613
T-14.487.522
46NR7003
1"
NOTE-1 C-3

13032
V09
C-2 046KBS-657 1"
46VG7004 F17
046 46VB7051 46NR7004 1-1/2" 1-1/2"

65
20
C-1 35 1-1/2"-W461032-13032-L-2N 1-1/2"-W461033-13032-L-2N TO ANION EXCHANGER
FG T-14.487.514
1" 614 C-2 1" 1-1/2"x1" 10 DILUTED CAUSTIC SODA
1-1/2"x1" 1" 1"

FV
20 B
J-4642

SKID

INTERCONNECTING
AM
FC C-3
NOTE-5 VENDOR
NOTE-9

1-1/2"-W461032-13032-L-2N CONTRACTOR
CURBED AREA CURBED AREA
AA TO DRAIN
NEUTRALIZATION PIT
T-14.186.580
...

FROM DEMIN.
20

1-1/2"-W461023-13032-L-2N
65

SERVICE WATER PUMPS 35


T-14.487.516
DEMIN. WATER 10
FV
20 B
AM

AA 13032 18160-LNG
1"-W461034-18160-LNG-L-2N SD-UJV
DOCUMENT STATUS SIGNED DATE
V09
C-2
F17 046KBS-656 J-4641 1 - ACCEPTED AS SUBMITTED (submit certified as final)
46VG7005 046 C-1 46VB7052 46NR7005 1" 1-1/2"-W461034-18160-LNG-L-2N 1-1/2"-W461035-18160-LNG-L-2N
FG TO CATION EXCHANGER
T-14.487.513 REVISE AND RESUBMIT
1" 615 C-2 1" 1" DILUTED HYDROCHLORIC 2 -
1-1/2"x1" 1" 1" 1-1/2"x1" INCORPORATE COMMENTS, UP-REV AND RESUBMIT
C-3 3/4" 20 35 ACID

65
FC REJECTED - Document unacceptable, revise and resubmit
NOTE-9 NOTE-1 1"x3/4" 3 -
10 (work can proceed where not impacted by this rejection)

FV
20 B
C-3 46NR7006

AM
AA
1" 4 - REVIEW NOT REQUIRED
C-2
65 46VB7088 1" NOTE-3
1-1/2"-W46638-18160-LNG-L-2N
20

35 SCF - SUPPLIER CERTIFIED AS FINAL

10 NOTE-1 AA
V09
FV

046KBS-650
20 B

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


AM

V09

SKID

INTERCONNECTING
V09 1" RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
046KBS-653 NOTE-1 46NR7007 046KBS-649 046LISA-614
NOTE-1 C-1 FC T-14.487.522
1-1/2" V09 2" C-1 SEQUENCE FAULT
CWP No:B03-WP4.7-000-FI-MC-201
NOTE-1 C-1 FC 046KBS-654 1"
C-1 V09 FO 046LISA-615
46NR7010 046KBS-655 T-14.487.522
2" N1 - 1-1/2"
1-1/2" 46VB7094 1"
F14
046 FO
CONTRACTOR
VENDOR

N7 - 1" NOTE-7 NOTE-1 C-1 FC


RO 2"-W461027-18160-LNG-L-2N C-3
622 1"
46 -IP AA CERTIFIED FINAL CG 24/02/23 GP 24/02/23 MR 24/02/23
OVERFLOW

N4 - 2" NC
105 V09
046KBS-652 A CERTIFIED FINAL CG 03/02/23 GP 03/02/23 MR 03/02/23
1-1/2" NOTE-8 EQUIPMENT LIST
OE RE - ISSUED FOR REVIEW CG 12/12/22 GP 12/12/22 MR 12/12/22
FROM UNIT 4300 NOTE-1 C-1 FC NOTE-4 N5 - 3" C-2 HH
046 OD RE - ISSUED FOR REVIEW
65
20

1-1/2"-W46621-18160-LNG-L-2N 35 V-4644 CG 04/11/22 GP 04/11/22 MR 04/11/22


L-01

T-14.186.580 LISA
3.5 614 V-4645 OC RE - ISSUED FOR REVIEW
C-2 046-SP-7622 LL CG 06/09/22 GP 06/09/22 MR 06/09/22
FV
20 B
AM

46VB7054 1" L20


F14
046 2"-W461047-18160-LNG-L-2N V-4646 OB RE - ISSUED FOR REVIEW CG 14/02/22 GP 14/02/22 MR 14/02/22
UNI-D-01 NC FV
20 35 5

1-1/2"-W461049-18160-L-2N RO N6 - 3" C-2 J-4641


6

2"-W461028-18160-LNG-L-2N 046 H
20 10

623 N4 - 2" N5 - 2" OA RE - ISSUED FOR REVIEW CG 03/12/21 GP 03/12/21 MR 03/12/21


L-01

65 N1 - 1/2" 65 LISA J-4642


46VB7069 46NR7008
20

20

FROM SERVICE WATER L


T-14.487.518
35 35 615
A MB O ISSUED FOR REVIEW CG 28/09/21 GP 28/09/21 MR 28/09/21
13 C-2 3.5 L20 SK-4644
1/2" 1/2" N2 - 2" N2 - 1" REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
FV

FV
20 B

20 B

1"-W461029-18160-LNG-L-2N
V-4644
AM

AM

NO C-2
AA 46VB7070 REVISIONS
N3 - 1" 46VB7055
N3 - 1-1/2" AA This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
VENDOR

CONTRACTOR

1" Recipient must obtain the written authority of the said company before wholly or partially duplicating.
1/2"-W461040-13411-L-2N NC 1-1/2"
NC All rights reserved.

46 -IP PO No: 1366077


111 VENDOR DRAWING No. NIGERIA LIQUEFIED NATURAL GAS
V-4646
1398-00-A211-05 NLNG - BONNY
TO DRAIN DRAWN: CG
2"-W461030-18160-LNG-L-2N 2"-W46627-13411-L-2N NEUTRALIZATION PIT PROJECT
T-14.186.580 DATE: 24/02/23 NLNG TRAIN 7
...
CHECKED: GP
VENDOR NAME
NOTE-5 VENDOR DATE: 24/02/23 UNIDRO srl
CONTRACTOR
APPROVED: MR
LOCATION DISCIPLINE UNIT No
CURBED AREA CURBED AREA DATE: 24/02/23
TO DRAIN BONNY ISLAND, NIGERIA MEC 4600
APPD. LNG: TITLE
NEUTRALIZATION PIT
T-14.186.580 DATE:
... PEFS - CHEMICAL INJECTION UNIT FOR PO 1366077 - DEMINERALIZATION WATER
CONTRACTOR DRAWING No.
{QRCODE} PREPARATION PACKAGE (A-4640)
L046-PD-B-87517
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
B190170NTP
CAD REF: T-14.487.517-SH01.dwg ORIGINAL SIZE: A1 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED 1:1 CONTRACTOR PROJECT No.
N88480 T-14.487.517 1 OF 1 AA